Loading…
Loading…
5,868 results • Best match
QUANTUM OF WORKS INVOLVED IN REPLACEMENT OF OLD and JARJAR WIRE/CABLE OF 11 KV and L.T. LINE, INCREASING HEIGHT OF 11 KV LINE FROM GROUND LEVEL AT DIFF. SITES AND CONSTRUCTION OF NEW 11 KV LINE FOR THE BIFURCATION OF OVERLOADED 11 KV FEEDERS
For Welding of Rusted and Damaged LT Poles and 11 KV Line Polesin the area of Electricity Urban Distribution Sub-Division-VIII, Under Electricity Urban Distribution Division-I, Meerut.
Construction of (1) 33 KV Line for feeding of existing 33 KV Double Pole of 33 KV Substation Meerut Road-1 at 132 KV Substation Morta to 220 KV Substation Morta, Ghaziabad and (2) 33 KV Line for feeding of 33/11 KV Substation Meerut Road-2 from 220 M
Development of Distribution Infrastructure under RDSS Scheme in Varanasi District
Electrification of LT Line Under EDD Rath
ELECTRIFICATION OF LT LINE UNDER EDD RATH
Repairing and strenghtening of HT LT Line
REPAIR LT LINE GUARDING AND ROAD CROOSING
REPAIR LT LINE GUARDING AND ROAD CROSSING
RESAGGING OF LOOSE 11 LT LINE TIGHTENING
For Welding of Rusted and Damaged LT Poles and 11 KV Line Poles in the area of Electricity Urban Distribution Sub-Division-II, Under Electricity Urban Distribution Division-I, Meerut.
Maintenance for 11 KV LT Line under EDD mehadawal
For Construction of Damaged Undergrounding LT Line by new Undergrounding LT line at Bhadaini, Varanasi under Business Plan 2023-24
VARIOUS 33/11 KV SUBSTATION LAYING ADDITIONAL CABLE AND NEW 11 KV LINE ERRECTION WORK IN BUSINESS PLAN 2024-25
TO ELECTRIFY 33/11 KV LINE BY UNDERGROUND CABLE IN TRANSPORT NAGAR BULANDSHAHR UNDER FULL DEPOSIT IN EDD 5 BULANDSHAHR.
SHIFFTING OF 11 KV LINE OF SONAULI BALLIA TO MEOLI KANASHPUR UNDER DEPOSIT HEAD 2023-24 UNDER EDD II BALLIA
Construction and shifting of 11 kv line on deposit scheme 2024-25 under edd i bhadohi and edd ii gopiganj
1 WORK IN HEAD CONST AND BIFERCATION OF 11 KV LINE AS PER DPR SNO 2 UNDER EUDD 5 NOIDA
For Supply of A-4 Size Paper Rim for the Office Use of EE, EUDD 11 KV Line-North, Meerut.
For Supply of A-4 Size Paper Rim for the Office Use of EE, EUDD 11 KV Line-South, Meerut.
Under the Business Plan Year 2024-25, repair work of 11 KV line under Electricity Urban Distribution Division-III, Muzaffarnagar.
Construction of 11 KV line, capacity enhancement of 11/0.4 KV distribution transformers and replacement of 33 KV VCB etc.
In EDD Bansi under BP 2025-26 construction of 11 kv line and installation of new TF on trunkey basis
For the Work of Additional Business Plan 2023-24 Construction of New 11 KV line Work Under EUDD-II, Meerut.
In EDD DG under BP 2025-26 construction of 11 kv line and installation of new TF on trunkey basis
In road widening the work of shifting 11 KV line from Aadi road in Vadhak tehsil-Gursarayan to village-Amli
11 KV Line Shifting of at vill kalyanpur, block Vikramjot under EDD Harraiya Basti in deposit scheme year 2021-22
Replacement of Jarjar Wire/Pole, Garding of Line, placed new pole Middle of 11 KV Line, Under EDD Budhana, Khatauli
05/2024-25/EDCR Construction of 11 KV Line and bifurcation works under Business Plan 2024-25, EDD-II, Rampur.
01 WORK IN HEAD CONSTRUCTION AND BIFERCATION OF 11 KV LINE AT DPR Sl NO 8 UNDER EUDD 5 NOIDA
Erection of 11 KV Line Line Sifting Rajkiya Nalkoop in Deposit Scheme again Semi Turnkey basis under EDD-II, Prayagraj.
Operation and Maintenance of 11KV Switch Gear and 11 KV Line from BTPS Switchyard to DTPS substation for FGD Erection
For Guarding of 11 KV Line in the Area of UEDD-II, Chaukaghat, Varanasi under Add. Business Plan 2024-25
WORK OF CONSTRUCTION 11 KV LINE AND INCRESING CAPACITY OF 33 KV Ss FOR CE JAL UNDER EUDD 1 NOIDA
Business Plan 2026 27, Installation New 11 0.4 KV Distribution Transformer and Strengthening Work of 11 KV Line Head Work
Construction/Mentinance of 11 KV Line Under Full Deposit Scheem at Navodaya Vidhalaya, Agsoli, Sikandra Rao Under EDD III Hathras
Electrification of Payjal Yojana at Near Mahaveeran Mandir and Extension of 11 KV Line at Vill. Mahokhar under EUDD, Banda
Replacement of damaged Pole at 33/11 KV Line Govind Puram (Bussness Plan) under the jurisdiction of EUDD-I, GHAZIABAD.
Maintenance of 11 KV line with re sagging of loose lines replacement of straightening of tilted pole at verious palace
Construction of 11 KV Line, 11/0.4 KV S/S for New Connection 02 Nos Tube well at Faleda Bangar
11 KV LINE PCC POLE AND BRECKED INSOLETER AND LINE TO BE REPLECE FOR RANING CONTRAC AT SUB DIVISION BHUDANA
Construction of LT Substation 11 KV line and other associated work to provide Electricity connection to consumers under deposit scheme.
Rural Electrification work on semi turnkey bais of Block Fatehabad and Pinahat of Agra District
Rural Electrification work on semi turnkey bais of Block Kheragarh Saiyan Shamsabad of Agra District
Rural Electrification work on semi turnkey bais of Block BarauliAhir Etmadpur Khandauli of Agra District
Work of Feeder separation of 11 KV Feeder Dhanghata emanating from 33/11 KV Sub-Station Mukhlishpur under Electricity Distribution Division Khalilbad.
Deployment of manpower for RDSS Kashmir
03 WORK IN 33 KV LINE AT DPR 3 6 7 AND 01 WORK IN SYSTEM STRENGTHENING AT DPR 26 EUDD 7 NOIDA
33/11 KV Sub-Station in Nagla Bhama, associated 33 KV Line with 11 KV Feeders District-Mathura on Semi Turn Key Basis
Construction of New 33 KV Line from 132/33 KV S/S Ahraura Mirzapur to 33/11 KV S/S Ahraura Dist- Mirzapur