Loading…
Loading…
5,870 results • Best match
DISCONET AND RECONCT THE HT AND LT LINE IN ALL SUB DIVISION UNDER EDD GAJRAULA DUE TO THE FESTIVAL OF MOHHARAM
CONSTRUCTION HT/LT LINE 11 KV LINE FROM 33/11 KV ITI SUB STATION TO VILLAGE BARKHAPUR UNDER ELECTRICITY DISTRIBUTION DIVISION RAEBARELI. SEMI TURN KEY BASIS IN DEPOSIT SCHEME.
Replacement of damaged ST Pole 11 Mtr. long/ 9 Mtr. long and PCC Pole 8.5 Mtr. long installed at 11 KV Line and LT line Meerut as Running Work
Construction of 33Kv line from 220/33kV substation sector-32 to proposed 33/11kV substation R and R of village abadis in jewar banger,YEA
Work of 33KV line shifting and 33 KV Pole mounted CT PT unit at VBS Purvanchal University Jaunpur in the area of EDD-Buxa Jaunpur
Laying of Spare Circuit of 33KV UG cable from Dewadi Public School to Kotwan S/S (Kotawa Tarana 33KV Line) Varanasi under Business Plan2023-24
Construction of 33/11KV Sub-station 33KV Line and 11KV Feeder on semi turnkey basis at Marthara in District Etah under DDUGJY a GOI Scheme
11 kv line construction for STW
work of 11 KV Line Construction
work of 11 KV Line Construction
Construction of LT Line and converting LT veasel to LT ABC and other work in front of fire station under EDD-2 Azamgarh
Schedule of Works / Rates and Technical Specifications for construction of 33 KV, 11 KV Line and dismantling work for shifting of existing line in the route of OLD NATIONAL HIGHWAY No.-2 at ASFABAD CHAURAHA
Quantum of works for construction of 11 KV line AND S/S on HT/LT for releasing connection under the full deposit scheme in the area of EDSD-II, Magarwara under the EDD-II, Unnao
Quantum of works for construction of 11 KV line and S/s on HT/LT for releasing connection under the full deposit scheme in the area of E.D.S.D.-II, Safipur under EDD-IV, Bangarmau, Unnao.
Sifting of 11 KV Line and other electrical work against Pradhan Mantri Gram Sadak Yojna (Deposit scheme) Under Jurisdiction of EDD, CESS-III and IV, Ciss Gomti, Lesa, Lucknow (Package No. UP46114, UP4697, UP46112, UP46113)
For the Work of 11 KV Line Construction/Strengthing, Installation of New T/Fs and other associated works Head on Buisness Plan 2023-24 VARSHA RITU on Semi Turn Key Basis under EDC-1 Agra
Work of shifting the line of 11 KV line form Nagar Palika Parishad Gate No. 1 to Gate No. 3 against full deposit scheme in the area of E.E., Electricity Urban Distribution Division-Tech, Muzaffarnagar
Quantum of works Construction of 11 KV Line AND S/S for releasing connection/other related works under the full deposit scheme under the area of EDSD-III AND EDSD-IV under EDD-IIst, Unnao
Quantum of works for construction of 11 KV line AND S/s on HT/LT for releasing connection under the full deposit scheme in the area of EDSD-I, Shuklaganj under the EDD-II, Unnao
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection under full deposit scheme in the area of E.D.S.D.-I, Ajgain under Electricity Distribution Division-V, Hasanganj, Unnao.
Quantum of works for construction of 11 KV line and S/S on HT/LT for releasing connection under the full deposit scheme in the area of EDSD-III, Banther under the EDD-II, Unnao
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection under full deposit scheme in the area of E.D.S.D.-I, Ajgain under Electricity Distribution Division-V, Hasanganj, Unnao.
Construction of 11 KV Line and installation of 5 MVA Power Transformer for release of 1500 KW connection Regional Manager Prayag. Depot, Rajapur, Prayagraj on Semi turn key Basis Under Electricity Urban Distribution Division Mayohall.
VARIOUS ELECTRICAL WORK- UNDER BUSINESS PLAN 2024-25 IN EDD SALEMPUR DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT, INSTALLATION OF DISTRIBUTION TRANSFORMER, STRENGTHENING OF 11 KV LINE, NEW AND REPAIRING OF LT LINES, REPLACEMENT OF VCB , XLPE CABLE
VARIOUS ELECTRICAL WORK- UNDER BUSINESS PLAN 2024-25 IN EDD GAURIBAZAR DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT, INSTALLATION OF DISTRIBUTION TRANSFORMER, STRENGTHENING OF 11 KV LINE, NEW AND REPAIRING OF LT LINES, REPLACEMENT OF VCB, XLPE CABL
Schedule of Works / Rates and Technical Specifications for construction of 33 KV, 11 KV Line and dismantling work for shifting of existing line in the route of OLD NATIONAL HIGHWAY No.-2 at ASFABAD CHAURAHA
Quantum of work for construction of 11 KV line S/s for releasing connection/other related works under deposit scheme in the area of EDSD-I, Shuklaganj and EDSD-III, Banthar of EDD-II, Unnao
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection under full deposit scheme in the area of E.D.S.D.-II, Safipur under Electricity Distribution Division-IV, Bangarmau, Unnao.
Quantum of works for construction of 11 KV line S/S on HT/LT for releasing connection under deposit scheme in the area of EDSD-I, Ajgain under the area of EDD-V, Hasanganj, Unnao.
33/11 KV line coming out from Power Substation- Saidpur under Power Distribution Section-IV, Sayana, Saidpur under Pradhan Mantri Gram Sadak Yojana-3 Work of shifting the line poles obstructing the widening of road.
Quantum of work for construction of 11 KV line AND S/s on HT/LT for releasing connection/other related works under deposit scheme in the area of E.D.S.D.-III, Banther of EDD-II Unnao
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection under full deposit scheme in the area of E.D.S.D.-I, Ajgain under Electricity Distribution Division-V, Hasanganj, Unnao.
Construction of New 11 KV Line for giving to New Light and Fan Connection in Jhuggi Jhopri near DTC Depot, Waqueel Wala T/f, Sector-16 and A-53, Sector-16 Along the Nala Patri
The Work for construction of U/G 11 KV line for Bifurcation of 11 KV Ashapur Feeder emitting from 33/11 KV S/S Ledhupur in the area of UEDD-VI Ashapur Varanasi under EE, UECD-II, Varanasi in Grism Kalin Business Plan-2019-20 on Semi Turn-Key Basis.
For the Work of 11 KV VCB Incoming and Outgoing and 11 KV Bus Coupler 33 KV C and R Panel, 33 KV VCB and Under Business Plan 2025-26 in the Area EE EUDD-33 KV Line, Meerut.
Supply of Materials and Erection for Construction of 33 KV line From 132 KV S/S Jigna to 33/11 KV S/S Bharatganj Distt. Prayagraj in Business Plan 2023-24 on Semi Turnkey Basis under EDC-I, Prayagraj
The work for Reconductoring of 33 KV Line of S/S Pannalal Park from Dog to Panther in the area of UEDD-Varunapar, Varanasi Under EE, UECD-II, Varanasi in Business Plan 2025-26 on Semi Turn Key Basis
Construction of 33 KV line to 10.00 Km Approx from 132 33 KV Ss Rudhauli Basti to 33 11 Ss Puraina Basti and 17.5 Km Approx from 132 33 KV Ss Rudhauli Basti to 33 11 Ss Saltaua, Basti.
SHIFTING OF 33 KV LINE (KARKHIYON AND SINDHORA) NEAR 220 KV SUBSTATION GAJOKHER TO MAKING OF 33 KV BAY FOR GIVING NEW CONNECTION OF 2950 KVA TO M/S B.D WENCHER LLP, KARKHIYON PINDRA VARANASI ON SEMI TURNKEY BASIS.
Construction of new 33 kV line for 33/11 kV S/S W.B. Barra and 33/11 kV S/S Karrahi under EUDD-W.B. Barra, KESCo., Kanpur for provision of Double Supply from 220/33 kV GIS S/S.
Supply of Materials and Erection for Construction of 33 KV line From 132 KV S/s Sirathu to 33/11 KV S/s Dhata (Kharshedawa) Distt. Fatehpur in Business Plan 2024-25 on Semi Turnkey Basis under EDC, Fatehpur
Supply of Materials for Construction of 33 KV Line, Increasing Capacity of Power T/F installed at various Sub-Stations, Repairing and Replacement of 33 KV Switchyard equipments etc. and Installation of Batter and Battery Charger under EDC Pratapgarh
For Construction of Alternative Source Line to 33/11 KV Sub-Station Vikas Puri from 33 KV Line Lisari Gate for Maintaining Uninterrupted Power Supply in the Area of Electricity Urban Distribution Sub-Division-VI, Under EUDD-3, Meerut
For Shifting 33 KV Line of Ladies Park Coming from 220/132/33 KV Modipuram Sub-Station and Passing Over the Residential Uday City Colony, Pallavpuram, Phase-2, Modipuram Under Deposit Scheme, Under Electricity Urban Distribution Division-I, Meerut
Supply of Materials and Erection for Construction of 33 KV line From 220 KV S/s Sato Dharampur to 33/11 KV S/s Fareedpur Distt.-Fatehpur in Business Plan 2026-27 on Semi Turnkey Basis under EDC, Fatehpur
Supply of Materials and Erection for Construction of 33 KV line From 220 KV S/s Sato Dharampur to 33/11 KV S/s Asothar Distt.-Fatehpur in Business Plan 2026-27 on Semi Turnkey Basis under EDC, Fatehpur
Supply of Materials and Erection for Construction of 33 KV line From 220 KV S/s Sato Dharampur to 33/11 KV S/s Thariyao Distt.-Fatehpur in Business Plan 2026-27 on Semi Turnkey Basis under EDC, Fatehpur
OPENING OF H.T, L.T. AND 33 KV LINE ON THE OCASSION OF MOHARRAM FOR PASSING TAJIYA AND BINDING OF THEM AFTER PASSING TAJIYA IN DIFFERENT VILLAGES OF PEEPALSANA, JAHAGEERPUR AND DILARI SUBSTATION UNDER THE AREA OF EDD II MORADABAD
Repairing and extension of LT Line S/F of LED Street light and cabling work At NMY Aharaura
Repair of LT line and line shifting, S/F of main switch and LT panel at NMY Shahjahanpur.