Loading…
Loading…
632 results • Best match
A/R M/O State highway under Sub Division No.I, NACD, APWD, Mayabunder during 2023-24. SW- Construction of RCC Retaining wall to protect the berm and to retain the earth filling before culvert No. C-1/02 at Danapur Sub Division No.I, NACD, APWD, M/B
PROVISION OF TOILETS AT VARIOUS LOCATION FOR 2U DET, PROVN OF STAINLESS STEEL RAILING INFRONT OF BLDG. NO P-521 AND P-507 AT 2U DET, DURGAPUR AND SPECIAL REPAIR (ELECTRICAL WORKS) OF RETAINING WALL IN FRONT OF BLDG NO.P-420 AND P-425 AT CGDHQ UNDER
Special Repairs to existing building for ZSI, ANRC located at Port Blair during 2021-22. SH: RCC Roof, Strengthening of old RCC Retaining wall, columns and upgradation of common circulation areas. SH: Providing and fixing floor carpet in Officer-in-charge room at ZSI Office, Port Blair.
RandM of rural road under SD-II, CD-I, APWD, Rangat. SW - Construction of gabion wall near Rangat Bridge to protect the nearby land from erosion during flood along the bank of Rangat river under SD-II, CD-I, Rangat.
AR and MO rural road under SD-II, CD-I, APWD, Rangat during the year 2022-23. SW - Construction of Gabion wall at sliding area near Culvert No. 1 at Sabari Jn. to Yeratta rural road under CD-I, Rangat.
Improvement of Road from SH-09 to check dam including CC toe wall at Panighat under RCD Wimberly Gunj.
Profile correction of existing damaged drain starting from Teylerabad road near RSN Poultry farm towards Nagamuthu house under CD-II, APWD, Prothrapur.
Construction of RCC Box Culvert including earth work, wing wall and protection wall near the house of Ramaswamy house in the existing katcha road from Ayyanar Temple to Shri. Chelleya house at Calicut ward no.06 under Zilla Parishad, South Andaman
Construction of RCC Road along with retaining wall inside Campbell Bay Power House.
A/R M/O District Road under Sub Division No.II, NACD, APWD, Mayabunder. SW- Construction of RCC Retaining wall of 3 mtr hieght to protect road sliding at Ch. 0.379 km of road lead Lall Bahadur house on PMGSY Road at Tugapur No.07 under SD-II, NACD,MB
Up-gradation of Rural Road from Guptapara Junction to Subhash Banik house at Manglutan under PMGSY-II. SW- Providing Gabion structure for a length of 50.00 mtr on either side of RCC Culvert along with RCC Road in the left out portion
De-Silting work for the Downstream pond of Mini Bund and constructing Gabion structures across bund to protect earth, situated on back side of the Institute Auditorium under DBRAIT Campus under CD-I, APWD, Port Blair. Sub Work Laying of pipe line
AR and MO State Highway-15 under SD-II, CD, APWD, Diglipur during 2024-25. Sw- Construction of Gabion wall structure for restoration of sliding of road at SH-15 Chainage 16.75 Km under Radhanagar Section, CD, APWD, Diglipur. SH- Balance work
Mechanically Woven, Double - Twisted, Hexagonal Wire Mesh Gabions, Revet Mattresses and Rock Fall Netting as per IS 16014 (Q3)
Construction of Retaining Wall and fencing of Newly Constructed Anganwadi Centre at Mannarghat 5
Repair and renovation of Type-II Qtr No.BL-I 01 to 14 (Roof slab S/S) at Bahadur line-I and Leveling the ground C.C. road including step to door and C/o RCC Retaining wall at back side Qtr under Bahadur line-II, section, SD-II, APWD, Port Blair.
Special Repairs to Administrative Building for Subsidiary Intelligence Bureau, South Point, Sri Vijaya Puram during 2025-26. SH: Providing Galvalume roof sheet covering at portico, Concrete surfacing around the administrative building, Construction ... damaged retaining wall near ...
Re plastering and painting of Retaining wall in front of Forest Training Institute building Wimberlygunj
Repair and renovation of Patwarkhana Tushnabad. Sub Work Construction of toe wall cum drain to protect the existing Patwar Khana at Tushnabad.
Construction of Protection Wall along the existing road from ATR to Abdul Kader at Ograbraj, Renovation of CC Road from ATR to P.K. Hamsa house at Ograbraj Renovation of CC Drain alongwith the existing CC Road from Zulmat Ali house to Panni Diggi GP
TOPOGRAPHIC SURVEY AND SOIL INVESTIGATION FOR RETAINING WALL BEHIND MT POOL, DHQ 14 ICGS, PORT BLAIR
Construction of support/Toe wall with boulder pitching behind Type-III qtr.SC-21 and 24 at ALHW residential colony Shadipur in Sri Vijaya Puram
Construction of retaining wall to protect the raised embankments at culvert Junction on SH-10 at Kakachang
Construction of Retaining Wall cum drain and 300 mtr road at Khusiram Khari at Manpur (Balance Work).
Construction of 01 No. semi RCC structure pump ho use including suction and delivery line and toe wall at IRBn camp us, Port Mout, Port Blair
Renovation of 02 Nos. Type-I Qtr. For JPP Hazaribagh Ferrargunj including Construction of RCC Retaining wall (10 Mtr)
Construction of approach footpath from School building to Mid Day Meal hall and staff quarters including CC retaining-toe wall at GSSS, Oralkatcha, Baratang Balance work Oralkatcha
Preventive measure for siltation on reservoir as suggested by CGWB, Kolkata at IRBn,HQ, Port Mout Sub Work Construction of 2nos Gabion wall of 3.00mtr height and 2nos. gabion wall 2mtr height at AKA KARI Dam at IRBn Complex
Slope Protection work at km 71.720, in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020- 21- 2nd Call
Construction of Road side drain, retaining wall from Chunna Bhatta to Surya Chakra Power house Balance Portion under RCD, Wimberly Gunj
Repair of footpath and construction of Retaining wall from main road to Shri.Ashok house at South Point in Ward No-10.
Sw - Construction of RCC Toe wall cum drain in PMGSY-II Road Code AN03DGP05 Stretch Kishorinagar to Paschimsagar Package No. AN0305 Ch.5 800 Km to 6 300 Km
Sw - Construction of RCC Toe wall cum drain in PMGSY-II Road Code AN03DGP05 Stretch Kishorinagar to Paschimsagar Package No. AN0305 Ch. 2 900 Km to 4 000 Km
Sw - Construction of RCC Toe wall cum drain in PMGSY-II Road Code AN03DGP05 Stretch Kishorinagar to Paschimsagar Package No. AN0305 Ch. 2 900 Km to 4 000 Km
Pl ref tender documents
Providing wall with Polymer flexible gabion structure for erosion control and protection to existing check weir at Tirur.
SW-Imp. of rural road from Dasarathpur Anganwadi to Shiv Temple Sabari for a length of 632.00 mtrs with road side shoulder and toe wall for a length of 201.00 mtrs.
Sw- Construction of RCC retaining wall along approach for arresting sliding for newly construction 04 Nos Type-III Qtrs at VIP Colony Diglipur
Construction of Retaining wall, drain and Renovation of Steps near the house of Shri.C.Murugan at Shadipur (Andaman Herald road) in Ward No-11.
Construction of CC and RCC Retaining Wall/Toe Walls wherever required to the sides of road from Shoal bay - 15 to Shoal Bay -19.
Protection of the Existing Compound Wall at Forest Training Institute Wimberlygunj Sub Work Construction of Retaining Wall and drain for a length 57 Mtr
Repair and Improvement of Rural Road from SH 9 towards Sai Baba temple Near Rama Rao House including CC Toe wall cum drain Saucer drain etc at Rajiv Nagar under RCD Wimberly Gunj
Construction of Office Building, Pump Room and Retaining Wall for National Centre for Disease Control (NCDC) branch at Nayashar, South Andaman. SH-1 Building Portion including water supply, underground sump, ETP, sanitary installation, drainage. SH-2 Providing Internal Electrical Installations, Sub-Station, Fire alarm, Fire Fighting, VRV AC, CCTV, EPBAX, LAN, AV System, UPS, DG set and Street light, ETP & Solar PV power generation system with allied works.
Slope Protection work at 02 Locations (km 72.00 and km 72.80), in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020-21- 2nd Call
Reconstruction of damaged CC drain and construction of RCC retaining wall to prevent sliding in front of water treatment plant Garacharma under AEIII, CDIII, Prothrapur
Construction of RCC retaining Wall and Footpath with hand Railing Starting from Bala Krishna Bahadur house to Khil Bahadur house at Nepali Basthi in Ward No12
Urgent restoration of damaged and sliding road portion at New Manglutan rural road Chainage 2420 to 2476 by construction of RCC retaining wall 3mtr and 2mtr
Construction of RCC Retaining Wall for a length of 110 mtr. For protection of Playground at Tankya Pahad under Steward Gunj Gram Panchayat under Ferrargunj Tehsil.
Restoration of flexible pavement at Km 106.60 and Construction of Slope Protection work by Reinforced Earth Structure at 3 locations (i.e. Km 68.80, Km 71.50 and Km 71.55), in the UT of A N Islands on Item Rate basis in FY 2021-22 - 2nd Call
Chargeable Work Improvement and widening of Road from Bird Line Junction to Pema Junction including Construction of Toe wall, Drain etc Sub Work Transportation of Bitumen from IOC Kolkatta Plant to Store Yard at Bird line secti