Loading…
Loading…
33 results • Best match
Slope protection work of ROR line in MGR
Construction of Retaining Wall in front of Training Hall
PROVISION OF TOE WALL AROUND AIRFIELD AREA AND CERTAIN MINOR AND REVENURE WORKS AT AF STN BIHTA
Balance work for side slope protection work for approaches of Major Bridges and between KM 3 to KM 5 in DBG bypass line.
Balance work for side slope protection work for approaches of Major Bridges and between Km 3 to Km 5 in DBG bypass line.
Construction of RCC Retaining Wall near AWRS PH - Ash Dyke Area - NTPCKahalgaon
REPAIR AND MAINT RUNWAY SIDE DRAINS, APPROACH ROAD, HARD STANDING TOE WALL AND OTHER MISC WORK AT AF STN BIHTA.
Addn/Altn to retaining wall and Trg Shed along with roadway at WT Range at OTA Gaya
Construction of Boundary wall including RCC Retaining wall and earth filling at satellite campus of IIM Bodhgaya, Bihta, Bihar.
PROVN OF RETAINING WALL AT 154 INF BN (TA) BIHAR OFFICERS MESS AT ARMY LAND UNDER GE (I) CAMPBELL BAY
Construction of Slope Protection work with Dry-Stone Pitching over Geotextile filter for rail embankment constructed for North end approach of New Mokama Bridge across river ganga, in connection with Rampur Dumra-Tal-Rajendrapul Project
Construction of 06 nos. RCC Retaining Wall / guard wall in Stage-I and Stage-II Coal yards in CHP area at NTPC Kahalgaon
Construction of Sump-pit, Protection wall, drain and pedestal for Zero liquid discharge (ZLD) system at KBUNL
Construction of Bridge, Retaining wall, Drainage system and other miscellaneous work regarding Toy train at Sanjay Gandhi Biological Park (Zoo) Patna under ADEN/L/PNBE.
Repair of service road, Construction of RE wall, slope protection work, Earth filling work (Weight bridge) and Safety work for Approaches to Rail - cum -Road Bridge across River Ganga at Munger Ghat near Munger of NH-333B in state of Bihar (2nd Call
Construction of Retaining wall surrounding of driver waiting shed and repair of paved road near weigh bridge No 1 at ICP Jogbani along Indo-Nepal Boarder
Raising of retaining wall, road surface, drain improvement to prevent waterlogging during monsoon at LHS No. 10D,17,22, 24 in HJP-CHPG section under ADEN/Line/SEE.
Construction of Boundary wall including RCC retaining wall, MSE wall, Pre-cast compound wall, Main gate complex and other associated works for AIIMS at Darbhanga (Bihar) and their maintenance during Defect Liability Period on Engineering, Procurement and Construction (EPC) basis.
Provision of Side cover, Extension of shed (to Height gauge), Retaining wall, Prevent entry of Rain water drain of LHS No. 98, 97, 94, 94A between section BYP- DMH.
Construction of Boundary wall including RCC Retaining Wall and earth filling at satellite campus of IIM Bodhgaya, Bihar. SH:-Preparation of Civil Structural Drawings and Conducting digital Topographical Survey.
PROVISION OF RETAINING WALL AND CHAIN LINK FENCING AT VARIOUS LOCATION AT SECUITY ZONE-III, AREA OF RESPONSIBILITY OF 154 INFANTRY BATTALION (TERRITORIAL ARMY) BIHAR BRICHGUNJ MILITARY STATION, SRI VIJAYA PURAM.
Construction of Administrative Building, Cafeteria, Extension and widening of existing road, construction of Retaining wall, Boundary wall and other works associated with development of Track Machine depot at CHAK SIKANDAR Railway Station
Construction of RCC Retaining wall near TAL junction to retain embankment slope for provision of future track on Delhi Howrah Main line in connection with Mokama Bridge project in Danapur Division of East Central Railway
Construction of Railway formation using Coal Ash,Blanketing incl Bridges, Service Buildings,Quarters,Service Road, Drain,Retaining wall,General Electrical works etc.in Const of MGR for Linking of Hurra C mines with existing MGR of Kahalgaon STTP
LIMITED
AC DIP Timer (Output Type: L/N), Time Setting: 4-8 Hours, Supply Voltage: 230 VAC, with Over Voltage and Under Voltage Protection, Wall Mounted, Over Voltage Cut-off: 280 V, Under Voltage Cut-off: 160
PROVN OF TOE WALL WITH CATTLE FENCING AROUND AIRFIELD IN OPS/TECH AREA AT AF STN BIHTA.
PROVN OF RETAINING WALL BEHIND BLDG NO P-57 OF SIG COY AND DRAIN FROM 154 TA BIHAR MAIN GATE TO CULVERT NEAR 282 FD WKSHOP REAR GATE AND BETWEEN MT GATE TO TCP 1 GATE AT BRICHGUNJ ML STN PORT BLAIR UNDER GE BTICHGUNJ
Construction of Minor Bridges, Retaining wall, Earth Work in formation, Blanketing, linking of permanent way including supply of ballast, transportation of P.Way materials, building work, water pipe line and others associated works in between Ch: 141.430 to Ch: 143.070 in connection with Chopan-Chunar doubling work in Dhnabad Division of E.C.Railway.
Epoxy grouting of exposed reinforcement, provision of insp. steps, construction of ballast retaining walls, toe walls, slope pitching works, etc in Bridges No 48 UP, 48 DN, 49 DN, 50 Up, 50 DN, 51 UP, 51 DN, 52 UP, 52 DN, 53 UP, 54 UP , 54 DN, 55UP, 55 DN, 56 UP, 56 DN, 58 UP, 58 DN, 59 UP, 59 DN, 60 UP, 60 DN, 63 UP, 63 DN, 64 UP, 64 DN in between NJP-AUB under SSE/Works/KNE
Miscellaneous Civil works of Designing, fabrication and Erection of Shed over pumps/UG tanks/ETP, Provision of Security Cabins, Retaining walls, Drains, Area Development and landscaping and other allied works at Motihari Terminal
Epoxy grouting of exposed reinforcement, provision of insp. steps, construction of ballast retaining walls, toe walls, slopepitching works, etc in Bridges No 32 DN, 33 DN, 34 DN, 34 Up, 35 Up, 35 DN, 36 UP, 36 DN, 37 UP, 37 DN, 38 UP, 38 DN , 39Up, 39 DN, 40 Up, 40 DN, 41 Up, 41 DN, 42 UP, 42 DN, 43 UP, 43 DN, 45 UP, 45 DN, 46 Up, 46 DN, 47 Up, 47 DN, in between NJP-AUB under SSE/W/KNE
Construction of Permanent Infrastructure at 71st Bn. Hqr of SSB Motihari, Bihar under Patna frontier, comprising of Admn block (Except training shed) and office, 128 Men Women Barrack 01 Block, Type II 12 Nos. Qtrs. (S plus 3) 01 Block, Type III 08 ... RCC Retaining wall , ...