Loading…
Loading…
1,143 results • Best match
Construction of RCC Road and retaining wall along the river to control flood from Nizampur Road to Sahbajpur Road in MC Nangal Choudhary
Construction of Retaining wall and Street From Community Centre to Goga Madi at Village Mamidi, Ward No -13, (FOR L/C SOCIETY LTD)
Construction Street, Drain and Retaining Wall in Village Sito Majra, Charnia, Karanpur, Kona, Khera, Marranwala Nichli Pargain and Khokhra Block Pinjore District Panchkula
D PLAN CONST. OF LIBRARY ROOM IN GSSS SCHOOL JATWAR AND RETAINING WALL OF POND ALONG SCHOOL BOUNDARY AT VILL JATWAR BLOCK SHAHZADPUR
BURJ GRAM PANCHAYAT FUND CONSTRUCTION OF RETAINING WALL ALONG RASTA IN FRONT OF FIELD OF KARNAIL SINGH IN VILLAGE BURJ KOTIAN GRAM PANCHAYAT BURJ KOTIAN IN BLCOCK PINJORE DISTRICT PANCHKULA
Pavement of Streets With IPB and Toe Wall at various Places in Village Tigaon Block Tigaon Distt Faridabad (From Jhande To Baba Sarda and H/O Sekhar To H/O Rinku)
IPB FLOORING, TOE WALL
TOE WALL,WBM,ILPB
Const. of Retaining wall on Various roads in Morni Area in Panchkula Distt.
(fixing of grills on brick toe wall with three years mtc and defect liability period free of cost and all other works coantingent thereto).
Const. of toe wall with G.I. interlocking wire mesh jail 2x2 wire size 10 gauge fabricated on M.S. angle iron frame with brick pillar on ground around the green belt adjoining MG road and in front of metro station in Sector-28, Gurgaon
estimate for repair of protection wall and widening or left side service road at rd 72200 of hansi branch
Providing and fixing of grill fencing with toe wall and all other works contingent thereto with three year mtc and defect liability period free of cost
Construction of Retaining Wall on Mandkola Silani road RD 3.70 to 4.55 Km (LHS) (ID 3567) under Hathin constituency in Palwal Distt. (Without GST)
REPAIR/ MAINT OF RETAINING WALL, FENCING, PCC/ RR MASONRY, BRICK DRAINS, DRAIN COVER AND HARDSTANDING ETC AT MIL STN KALKA UNDER GE (I) JUTOGH
Construction of Retaining Wall in Forest Nalla backside of house of smt. Krishna devi in ward No. 23, Rathpur MC Kalka Under CM Announcement
A/M of various ODRs in PSD-Barwala (Section-I) (Constg. Of retaining wall along Gaibipur to Parbhuwala in km 2 in Hisar Distt
Construction of Retaining Wall, Sinchewal Model, Heritage Well and IPB Footpath of Goga Medi Pond Near Park at Village Fatehpur Niyamat Khan, Block Baragudha.
Construction of retaining wall on Narwana to Tohana road (MDR-111) at Km. 15.45 to 15.75 (Both Side) in Jind District (Road ID 6732)
Construction of Brick Retaining Wall (House of Sh Manphool singh to field of Sh Chotu Ram) At Village Barseen, Block Fatehabad, Distt Fatehabad (ReTender)
Providing flood retaining wall around the huge soil mass supporting T. No. 70 of 66kV D/C Hydle-Yamuna Nagar line and toe wall at 66 kV S/Stn. HVPNL, Jathlana.
A/Mtc of L/s work in Sector - 2, Panchkula. (Repair of Brick toe wall and repair of exisitng grills at site of green belt area and all other works contingent thereto).
A/ Mtc of L/s work in KDB Road in Sector - 4 , 5 , 7 and 8 Kurukshetra. (Painting of grills and snowcem on brick toe wall and all other works contingent thereto)
HEW 97 Construction of toe wall with grill fencing, Const. of footpath, Prov. and fixing of open gym, children playing equipments, and all other works contingents thereto in sector-56-A Faridabad
Const. of Toe Wall of ILPB from h/o banta s/o Kisan Ram to h/o Subhash s/o Bhagawan das near mussakhera road at village - Shakarpura Block Jakhal Distt. Fatehabad
(Painting of grill, Toe wall ,Tree Guard of Green Belt Area with one year mtc and defect liability period free of cost and all other works contingent thereto)
DRAIN,ILPB,TOE WALL ETC
WBM, Toe wall, Drain, IPC
IPB PAVEMENT , TOE WALL , WBM
TOE WALL, WBM,ILPB ETC
Toe wall, Nala, WBM, IPB
TOE WALL,WBM,ILPB ETC
TOE WALL WBM ILPB ETC
CC Block Abutment Wall, Protection Wall No 1 and 2, CC Stud No 1 in Kot Block in Chhachhrauli Range
Work for Protection wall arround tower no 02 of 220KV Panipat Ch Dadri SC Line under OM Division BBMB Panipat
Const of Retaining wall of Pond from Asgar to Mubarik at Village Asaisika G P Shadipur Block Nagina Distt Nuh (Zila Prishad List 01)122108
Constructing R.C.C. Retaining wall in inner side of West Jua Drain from RD 4150 to 34000 for Northern Bye-pass of Bahadurgarh City ( Phase-I)
CONSTRUCTION OF RETAINING WALL OF DHAB POND AT VILL CHHATTAR BLOCK UCHANA DISTTJINDCONST OF CATTLE GHAT AT DHAB POND VILL CHHATTAR BLOCK UCHANA DISTT JIND
Constructing 335 mtr long RCC retaining wall left side of River Markanda in Kala Amb to protect the abadi of Rambagh colony from river Markanda
Construction of retaining wall for 3 Nos. tower and 2 Nos. gantry for LILO of 220kV Fatehabad-Chormar line at 220 kv Sub-Station Hukmawali.
Uklana Block, Construction of Cow ghat and Retaining Wall Near Hanuman Mandir Pond and Near H/o Dharmpal Singh Khichar at Village Chamar Khera (HRDF)
Construction of Brick Toe Wall with Grill Fencing and Construction of Foot Path with Chequered Tiles around HSVP Nursery and Rose garden Sector-17 Faridabad with three years defect liability free of Cost
Fabrication and fixing S.S sign board and const. of fencing, toe wall, earth pits, paver blocks, gravel in yard, PCC under container at 33 KV S/Stn. GIS S/Stn. Jatton Gate Karnal
Job No.1050/2025 (HEW) Work for improvement of Parks with toe wall and grill fencing in Sector-6 U/E Jhajjar with 03 years defect liability period free of cost. (Re-Invited).
Reconstruction of toe wall in approach road with Annual Special Repair of Godowns including Steel Gates, Monkey Gates,Turbo Ventilator and Reconstruction of Damaged/Tilted Boundary Wall at SWH Sewari, District Gurugram. Recall
/Mtc of L/s work in Green belt Sector- 8, 9, 10 Ambala. (Dismentling of Brick Toe Wall and Repairing of Boundary wall of green belt area and all other works contignent thereto)
A/Mtc of L/s work in Sector - 15, Jagadhri. (Painting of grill , brick toe wall with one year mtc and defect liability period free of cost and all other works contingent thereto)
Construction of toe wall construction of foot path along with development of Horticulture works in parks in Sector-110-A Gurugram (Including three years of maintenance and defect liability period free of cost)
hew 82 Construction of footpath and Toe wall adjoining with Group Housing societies in HSVP Sec-2 Palwal and all other works contingent thereto including 3 years defect liability period free of cost.
The project involves the construction of a toe-wall with G.I. interlocked jali fencing along the green belt of Sector-87 Road, Asset ID 1045, Faridabad, with a total road length of 1900 meters on both sides and a green belt width of 18 meters.