Loading…
Loading…
1,143 results • Best match
A/Mtc of L/s work in Town Park and Bonsai Garden in Sec - 5, Panchkula. (Painting of grill, tree guards, white washing around the toe wall complete in all respect and all other works contingent thereto with one year Mtc and defect liability period fr
Construction of Stone Masonary RCC Retaining Wall
Construction of Retaining Wall and cow Ghat
Wdg. By 150 mm GSB plus 75 mm WBM and Stg. By 150mm WBM Stg. with WBM, BM , PC etc. Stg. with WBM, BM , PC with tack coat, seal coat, Side drain, CCB Road Furniture etc. Pdg. and laying WBM, BC, Breast wall, Retaining Wall, side drain and Road f
construction of retaining wall at village GARHI SAMPLA PAVEMENT OD STREET FROM MAIN GALI TO SHIVALYA AT VILLAGE SAMCHANA construction of boundary wall at school at vill nayabans construction of cowghat at chappar pond at village Hassangarh
LAYING OF WBM, ILPB 80MM ,NALA 1.5X1.5, TOE WALL, AND TYPE 1 DRAIN
Pavement of kachha rasta with IPB over WBM and toe wall both side
Construction of brick toe wall for pavement and all other works contingent thereto
RCC protection wall from RD 122000 to 123000 of Meham Drain to protect abadi and agriculture land of village Nindana and constructing various RCC box culverts instead of narrow pipe culvert.
Preventing erosion, Managing water runoff, Structural support
A/mtc of of L/s work in Town Park Sector-34, Ambala for the year 2025-2026. ( Painting of water body , Pits boulders, toe wall , Rain Shelter and tree guard etc. with one year mtc defect liability period free of cost and all other work contingent the
Dev of balance park in Sec 33 part A B C karnal (P and F of MS sq pipe railing on Brick toe wall , MS gate Wicket gate , Const of path with Chequred tiles , open air gym equiments , dustbin , garden benche mtc of grassy lawn trees shrubs other work)
A/mtc of L/s work in Green Belt Sector-9, Karnal for the year 2025-26.( Providing and Fixing of wire mesh Jali grill on toe wall, etc.with three year mtc and defect liabilkity period free of cost and all other work contingent thereto complete in all
A/mtc of L/s work in sector-33, Karnal for the year 2025-26.(Construction of extra brick toe wall in development of two No.parks in sector-33, part-A,B and C karnal etc.with three year mtc and defect liability period free of cost.)( Balance work)
A)DRAIN FROM H/O PREM HARIJAN TO ROAD (B) NALA H/O NAIN SINGH TO DRAIN (C) IPB STREET H/O SUKHWINER TO MAIN STREET (D) TOE WALL NEAR SHANI MANDIR (E) IPB STRRRT FARM OF PIRTHI TO H/O RAKAM VILLAGE BAHADUR PUR BLOCK PARTAP NAGAR
A/mtc of L/s work in Sector-33, U/E Karnal for the year 2026-27.(Providing and fixing of grill on existing toe wall (balance work )i sector-33,Karnal and all other work contingent thereto with three year mtc and defect liability period free of cost.)
Re-development of Mata Mansa Devi Temple Campus including Water ATM, Entry Hall, Main Gate, Shakti Chowk, Retaining wall, Staircase, Corridor for temple and Upasana Sthal at Village Bilasapur Panchkula including three year mtc. and defect liability p
Construction of roads, EPHS services near Kaushalaya Dam and behind of Himshikha colony alongwith construction of RCC retaining wall along the road in sec-5, Pinjore Kalka Urban Complex including 3 year defect liability period free of cost
Construction of Retaining walls and cow ghats of three main ponds in Village Khudan Block Machhrauli District Jhajjar
Work for construction of Fire protection wall between 50 MVA 220/132 kV Transformer (T-3) and New 100 MVA 220/132 kV transformer (T-4) at 220 kV Substation BBMB Kurukshetra
Construction of Retaining wall of Pond near school
Vill- Kamania, Const. of Retaining wall of Pond
Providing and fixing of grill fencing on brick toe wall around the green belt.
Construction of Internal Road and Parking, Toe Wall, Kerb Channel and road furniture etc.
Main PWD road to Dada Bhaiya Rasta with IPB, WBM, Toe wall with brickwork
Construction of footh path with 60mm thick interlocking paver block, construction of toe wall
DNIT for development of 2 4 lane access controlled road following the bank of westren Yamuna Canal construction of 6.3 Km (Proposing intersection design, underpass shed, traffic control measures, tiles on inside face retaining wall under pass and BC
Six laning of Panipat-Jalandhar section of NH01 from km 96.000 to km 387.100 in the State of Haryana and Punjab - Repair to slip road (LHS) joining Kali Paltoon bridge at km 200.600 including dismantling reconstruction of retaining wall
Re development of Mata Mansa Devi Temple campus including water ATM, Entry Hall, Main Gate, Shakti Chowk, Retaining wall, Stair case, corridor for temple and upasana sthal at Panchkula (including provision of the escalator with stair path and protect
1.Providing of toe wall in yard at 66 kV S-Stn Raipur Rani. 2.Repairing of parapet wall and sunshade of control room building at 66 kV S-Stn Raipur Rani. 3.Tile terracing on roof of control room building at 66 kV S-Stn Raipur Rani. 4.Providing gr
A/Mtc of L/s work in Green belt in Sector - 12 and 12 A, Panchkula. (Repair of Existing C.C. Path, Painting of grill and Toe Wall in Sector - 12, 12 - A, Park area with one year mtc and defect liability period free of cost and all other works conting
A/Mtc of L/s work in park in Sector-33 Karnal(Hiring of JCB leveling and making of road berm around park near H.No 804 to 815 for construction of toe wall with grill fencing and rough leveling in green belt Sector 8 and Sector 8 Part II, Karnal and
Construction of Internal Roads RCC Retaining wall in Residential Sector 80 Faridabad Construction of internal road including earthwork GSB WMM Prime coat tack coat thermoplastic paint and sign board etc in Phase II Sector 80 Faridabad and all other w
Protection work at Mata Mansa Devi Corridor 5D, MDC, Panchkula (Balance work) (Ch. To. Re-development of Mata Mansa Devi Temple campus including water ATM, Entry Hall, main gate, shakti Chowk, retaining wall, stair case, corridor for temple and upasa
Retaining Wall CONSTRUCTION OF STREET AT VILL OF BALET GP KOTI BOLCK MORNI VEGY CONSTRUCTIO OF STREET AT NEAR G.P. KOTI TO BAVDI GP KOTI BLOCK MORNI VILL TURON GP BALDWALA BLOCK MORNI CONSTRUCTION OF STREET AND R/WALL NEAR H
Construction of internal road and RCC retaining wall in sector 75 Faridabad.. Construction of internal road including earthwork GSB WMM Prime coat thermoplastic paint and sign board etc in Part 1 Sector 75 Faridabad and all other works contingent the
Estimate for special repair by Providing Retaining wall on Tosham Sagwan road via BLS College from Km. 3.100 to 3.300 in Bhiwani District. (Road ID No. 2173). (Under Work rpogramme 2026-27 Priority-I)(Tosham Constituency) Estimate for Special repair
Construction of internal road and RCC retaining wall in sector 75 Faridabad Construction of internal road including earthwork GSB WMM Prime coat thermoplastic paint and sign board etc in Part 2 Sector 75 Faridabad and all other works contingent there
Vill- Khatoti Khurd, Block- Narnaul, Retaining Wall of Pond
Construction of Retaining Wall at Village Bedwa Block Smiti
Const. of Retaining wall of Pond near Vishwakarma mandir
Construction of Retaining Wall of Pond ( Rodo Wala Pond )
Construction of retaining wall of pond along pwd road
Const. of IPB Street , varandha , and Toe Wall in Sc Shamshan Ghatt at village dumara
Const. of Rasta Mandir to h/o Parmanand, WBM, IPB, Toe wall, Pond R/wall
HEW 99 Construction of Brick Toe wall on Sarvodaya Hospital Mod in Sector-8, Faridabad
To check soil erosion
To check soil erosion
Construction of 02 Nos. Cow ghats (at RD 2000-L of Legha-Kairu Link Channel and at RD 27300-L of Ch. Bansi Lal Canal) and protection wall in Abadi area of Bhakra village.
Construction of Ramp, Plinth, and Protection wall 1 Nos. of tube well chamber and other maintenance works to functional the existing 4 Nos. tube well bore near Bhudena boosting in ward No.28 Faridabad.