Loading…
Loading…
1,143 results • Best match
Maint of Asphalt Base Construction Toe Wall, Exercise Mirrors Repair, Maint of Turf, Maint of Goal posts, Maint of Nets
Work for balance repair of grill fencing and construction of toe wall in HSVP Nursery Sector-2, U/E Rohtak
Estimate for site surfacing, supply of gravel, spreading of gravel, Making of toe wall and disposal of surplus soil etc.
CONSTRUCTION OF RETAINING WALL AND LAYING BOE ALONG ROAD IN VILLGE KILORDH BLOCK SONIPAT
VILLAGE-BALJATTAN CONST. OF RETAINING WALL OF POND NEAR SHIV MANDIR ON DHARAMGARH ROAD
Construction of RCC culvert and retaining wall near Kathuria Hotel ward no. 15, Gharaunda
Vill- Balaha Khurd Block- Narnaul, Const. of Retaining wall of Johad nr. Shiv Mandir
Construction of RCC retaining wall in MC Stadium in Ward No 12 MC Sadhaura.
VILLAGE-BALJATTAN CONST. OF RETAINING WALL OF CHAND WALA POND IN THE EAST SIDE
Construction of Stone Retaining Wall and Raising of Bwall and other Miscellaneous repair Works
CONSTRUCTION OF RETAINING WALL OF POND AT KHAJA KHERA, WARD NO 25,MC SIRSA
Development of parks including construction of toe wall wire mesh jali and Footpath in parks under MMAY in Sector-9 Mahendergarh
PROVIDING AND LAYING OF 60MM THICK PAVER BLOCK WITH CEMENT CONCRETE 1816 KERB STONE TOE WALL FIXING OF SS PIPE RAILING
Development of Parks with Construction of toe wall Barbed Wire Fencing and Footpath in Parks under MMAY in Sector-18 Rewari
Dabri Construction of Toe Wall (Widening) From Dabri Main Road to Dera Amrik Singh at Village Dabri Block Chirao Scheme VANGY
B/WALL PAINT AND FLOOR REPAIR 8O MM STREET WITH PVC PIPE 8O MM PAVER AND PVC PIPE CC TOE WALL
Development of parks including Construction of toe wall wire mesh jali and footpath in parks under MMAY in Sector-19 Rewari
CONSTRUCTION OF IPB RASTA/TOE WALL FROM AADRIS TO RASID S/0 ASAD FIELD AT VILLAGE GARHI BASIK BLOCK SANOLI KHURD
PAVEMENT OF FIRNI WITH IPB AND TOE WALL AT VILLAGE DAMKORA BLOCK LOHARU ( JHANJAR SHEORAN LINK ROAD TO FIRNI MOR TAK )
HEW 88 Construction of brick toe wall and fixing of M.S grill in park near H.No.1500 in Sec-2, Palwal
CLEARANCE OF JUNGLE, CONSTRUCTION OF RETAINING WALL, EARTH FILLING, RCC PILLAR FENCING, TOEWALL, MAIN GATE , TURNING GATE, TURFING OF LAWN, PLANTATION, ETC. CLEARANCE OF JUNGLE, CONSTRUCTION OF RETAINING WALL, EARTH FILLING, RCC PILLAR FENCING, TOEW
Construction of I.P.B Rasta With Drain And Toe Wall PWD Road To Krishna W/O Prahlad At Village Jahari block Sonipat GP
Work for balance improvement and repair of grill fencing and construction of toe wall in HSVP Nursery Sector-2 U/E Rohtak
HEW 89 Construction of brick toe wall with grill fencing in green belt along Delhi Mumbai Vadodara Expressway in Sector 32, Faridabad
Construction of Sumpwell with Dewatering and Supply, erection, commissioning and testing of 1 No. sewage submersible pump of 40 HP having discharge of 5500 LPM at 20 meter head including starter panel, cable etc. in Sector-5, U/E, Rohtak
CA NO. GE AF NO.1 / GUR-32 / 2026-27 REPAIR TO FLOOR, SANITARY FITTINGS, INTERNAL WATER SUPPLY, PLINTH PROTECTION, WALL AND OTHER ALLIED WORKS IN AIRMEN MESS, SNCOS MESS, DSC LINE, DSC MD ACCN, MADHUR MILAN, OFFRS MESS, CIV QUARTERS, SMQ AND OFFRS
HEW 90 Construction of brick toe wall with M.S. grill fencing in green belt along Delhi Mumbai Vadodara Expressway in Sector-9, Faridabad
Development of parks including Construction of Toe wall Wire mesh Jali fencing and Foot Path in park under MMAY in Sector-10 Mohindergarh.
Development of Various Parks in Sector-18, Rewari including Construction of toe wall and cement Concrete Foopath and all other works contingent thereto.
Development of Various Parks in Sector-19, Rewari including Construction of toe wall and cement Concrete Foopath and all other works contingent thereto.
In estimate 100mm mixed soil removing and providing and laying of gravel, making of toe wall in 220/132/33 kv switch yard.
Construction of RCC retaining wall around Industrial Estate, Ambala Cantt for protection from external rain water.
VILLAGE-BALJATTAN CONST. OF RETAINING WALL OF CHAND WALA POND ON THE SIDE OF WINE SHOP
VILLAGE-BHADAUR COMPLETION OF BRAHAMAN CHOUPAL VILLAGE-ADIYANA CONST. OF RETAINING WALL OF BABA SARDUDAS POND
PNP Construction of retaining wall of Gaggar Wala Pond at Village Seenk Block Israna Distt Panipat.
Construction of Retaining Wall towards hill side near D and F houses in SHKMGMC Nalhar Nuh.
Const. Of B/wall and Retaining wall of SHAMSHAN GHAT Village BHANSIMAJRA Block Thanesar Distt. KURUKSHETRA
As per Tender Document
Work for providing and fixing of grill fencing, iron main gate, wicket gate, C.C. Path, Rain Shelter, supply and planting of plants, cleaning of holes, PCC tree guard, road side plantation, garden benches, making lawn with rough grassing and mtc. in
Repairing of Protection wall from RD 66125 to 77810 of Hansi Branch
Improvement to protection work against scouring for bridge no. 1307 UP&DN, 1317UP&DN, 219 UP&DN, 245 UP&DN etc . by providing boulder apron and stone pitching work, Ballast Retainer, Retaining Wall, Jacketing, water way clearance, Inspection Steps, river training works, spandrel wall and other repairing works at various bridges under ADEN/SRE.
CONSTRUCTION OF IPB STREET AND TOE WALL FROM MAIN FIRNI TO SATISH S/0 KARMSINGH HOUSE AT VILLAGE KURAR BLOCK SANOLI KHURD DISTRICT PANIPAT
Pavement of IPB street with Toe wall (PWD Road to Rajender s/o Amar Singh) at Village - Mitathal, Block and District - Bhiwani (Panchayat SFC)
Development of Various Parks in Sector-37 C, Gururgam including Construction of toe wall and cement Concrete Foopath and all other works contingent thereto.
earth filling with loading unloading and carriage complete in all respect, brick work for retaining wall, WBM
VILLAGE-BALJATTAN CONST. OF RETAINING WALL DHOBI WALA POND NEAR H/O BHARAT SINGH NAIN NORTH SIDE
Providing retaining wall at tower no. 20 of 66 KV Joria-Radaur line (Including Labour and Material).
BAPOLI CONSTRUCTION OF BRICK STEPS AND RETAINING WALL ON TANKU POND AT VILLAGE BAPOLI BLOCK BAPOLI PANIPAT
Scope of work includes construction of retaining wall including the cost of labour and material at site.
Construction of Retaining wall at RD 198000 and clearance of Hansi Branch from RD 195335 to 198000