Loading…
Loading…
5,625 results • Best match
Construction of Jeepable road from Miarigala to Thatti road Km. 0/0 to 0/850 (SH Construction of 900 mm dia HP culvert at RD 0/335,0/660 and Retaining wall at RD 0/690-705,0/720-745 and 0/790-890)
RRD on Hafwana to Panyas road km. 0/00 to 17/500 (SH C/o PCC toe cum wire crates R/wall at RD 13/975 to 13/986 and PCC Retaining wall at RD 10/480 to 10/495) under PDNA
M/R to DPRA at Bemloe, Chotta Shimla and Park Area during 2025-26. SH: Provision of Plum concrete retaining wall and RCC drain for channelization of rain water runoff for further safety of Portland Guest House at Chotta Shimla (H.P.) (Recall)
A/R and M/O to GPRA under Phagli Section, Shimla during 2024-25. SH: Providing retaining wall for soil protection at Nabha State near Transformer Room of HP Electricity Board at Block A-2, Type-IV Qtr. at Phagli, Shimla (H.P.)
Repair and replacement of water supply line for Type-II quarters of AG Colony at Phagli & Tutikandi at Shimla (H.P.). SH:- Provision of retaining wall near RCC water storage tank for protection of soil around RCC water tank at Tutikandi, Shimla (H.P.)
M/R to GPRA at Bemloe Park area & Chotta Shimla dg. 2023-24. SH:- Repair of pathway and covering of drain at Oatland residential qtrs. repair and restoration of retaining wall and provision of toilet for pump house at GPRA Colony Bemloe Shimla.
A/R and M/O to Residential and Non-Residential building at IIAS, R.P. Niwas Shimla. SH: Provision of stone masonry retaining wall to prevent settlement of earth along existing road near Post Master Flat, Squire Hall road at IIAS, Shimla (H.P.).
M/R to IIAS at R.P. Niwas Shimla during 2026-27. (SH: Repair of retaining wall near Curzon House, repair of road side drainage on path, CC work on kaccha path portion, cross drainage work on road and other related miscellaneous repair works.
BSP 2024 661 Repair of Maintenance of Bus Stand Shikawari to Shila Kutla road in km 0 000 to 3 000 SH Construction of Retaining wall at Rd 1 710 to 1 720 and Construction of Unlined Surface drain in km various Rds
(Sub Head -Construction of Breast wall at RD 38/435 to 38/450 under NDF Deposit SID/NDF/2023/76)
ROFD in Km 0/370 to 0/505 and construction of Breast wall at R.D. 0/445 to 0/470
Construction of PCC Breast wall at RD 0.440 to 0.554, 0/680 to 0.699.50 and 2.082 to 2.087.50 balance work
(Sub Head -Construction of Breast wall at km 0/020 to 0/030) under BASP Deposit SID/BSP/2024/801
SH Construction of PCC Breast wall at RD 0/330 to 0/360 0/475 to 0/485 Under BASP
Construction of PCC Breast wall and one layer crate above CC B/wall at RD. 0/040 to 0/060
C/O Toe walls U/S and D/S of peirs , bed flooring and C/O Gabion stucture i.e. protection wall Alampur and Shivnagar side(U/S) of existing bridge over Bandel Khad at RD 0/0100 (Near Shivnagar Chowk)
C_O retaining wall to protect the source Nr. Storage tank at Kotlu Nallaha and dismantling of old rusted GI Pipe 15mm dia and laying and jointing and testing of GI Pipe of various dia in distribution system. Under DMFT
Repairs to road, path, drain, Chequered tile (Vibrator tiles only) retaining walls, water supply work park work and other miscellaneous works.
CO crate diversion weir, inlet outlet chamber and pressure break tanks 66 Nos, LJT of HDPE pipes at various RD, Retaining Breast walls at various RD, Pattra cutting and CAD networks
Construction of Retaining wall RD 0 to 50 Rmt and Stud Near Neugal Bridge and Retaining wall RD 450 to 515 65 Rmt and 1 No Spur
Tender for providing PCC retaining wall in place of damaged retaining wall during flash flood at 33/11KV Sub-Station Nagni under ESD Thural, under ED Lamabagaon .
Restoration of rain damages on NH-305 Sainj- Luhri- Aut road Km 0/00 to 97/00 (SH- Construction of protection wall on LHS abutment of Anni Bridge at RD 22/920) under FDR 2022-23
R/R of Damages on Gumma Pujali Baghi Road Km 0/00 to 28/500 C/o Protection wall at Rd 5/440 to 5/460 and B/wall at RD 5/410 to 5/455
Construction of temporary protection wall with stone masonry at Construction Adit/ Emergency Exit Tunnel of underground Larji Power House from flooding during the upcoming monsoon season for the year 2024-25 of 3x42 MW Larji HEP
Construction of Multi-story parking and office accommodation (Armsdale building Phase-III) at H.P. Secretariat, Shimla. (SH- Construction of platform for DG set and protection wall for installation of transformer including cleaning of floors and corr
Repair renovation to various residential buildings under division no III Shimla SH Repair of glass house in the front portion and repair of protection wall at the back side in Club Cottage at U.S Club Shimla
Restoration of rain damages to various residential and non residential buildings under division no III Shimla. (SH- C/O Retaining wall on back side of set no 20 for protection work C/O R/wall on back side of NH circle at Balkwali at Chaura
Construction of RRM wall at Leg C and D and Gabion crate walls below Leg A and along A and B on adjacent road at Tower location no. 33 of 400 KV DC Jhakri- Rampur Transmission line
Metaling Tarring on Chamyana to Surala road km. 0/00 to 6/00 (SH C/O R/wall at RD. 1/450 to 1/460 and Hume pipe culvert at RD. 4/705, 5/165 toe wall and P/F erecting of WBM crash barrier in km. 3/780 to 4/00(Under SCCP
R/R of Damages on Tharolla Pujahi via Chhanj Road Km 0/00 to 6/100 C/o R/wall at RD 1/455 to 1/465 and B/wall at RD 1/525 to 1/537, Both side wing wall, U/S and D/S toe wall at RD 1/025,1/100,1/270,1/450
Construction of PCC Toe wall and R wall at RD 1-345 to 1-359 under PDNA
Construction of PCC Toe wall alongwith R wall at RD 4-105 to 4-125 under PDNA
C/O PCC Toe Wall and wire crate R/Wall at Rd 2/085 to 2/110
Construction of PCC Toe wall alongwith construction of R wall at RD 1-490 to 1-530
C/O R/wall alongwith PCC Toe wall at RD-1/636 to 1/646.80) (under PDNA).
C/O R/wall alongwith PCC toe wall at RD-0/165 to 0/190). (Under PDNA).
C/o Downside Boulder Apron, PCC Toe Wall and RCC Flooring of Bridge at RD 14/060
C/O PCC Toe wall alongwith R/wall at RD- 4/605 to 4/635) (under PDNA).
C/o Building Portion, Providing W/S and S/I, C/o Septic Tank with Soak Pit, Rain Water Harvesting Tank and Site Development i.e. Site Leveling and Retaining/Breast Walls etc.
SH- Construction of building portion , providing water supply, sanitary installation, construction of septic tank with soak pit, rain water harvesting tank , site development i.e. site leveling construction of retaining/ breast walls etc. ).
C/o solid waste management site at village Rikki, G.P. Bhanthal (SH PCC breast wall, brick work, stone soling for road.)
Construction of Breast wall at RD. 0/730 to 0/870 (Left side) and 0/710 to 0/870) (Right Side)
SH C/O Breast wall in wire crate at RD 0/800 to 0/850 and 1/170 to 1/180
C/O approaches of culvert i.e. R/wall, Breast wall and Const.of soling causeway at RD 1/670 to 1/680.
Cutting in earth work in km 0.350 to 0.500 and Construction of Breast wall at RD 1/595 to 1/643
SH C/O Breast wall at RD 0/140 to 0/185,B/Wall at RD 0/415 to 0/450
Formation cutting at R.D. 0/405 to 0/830 and Construction of Breast wall at R.D. 0/735 to 0/750
SH. Construction of Breast wall in wire crate at RD 0/885 to 0/915 and 0/960 to 0/990
Formation cutting, construction of 2.00 mtrs span RCC slab culvert construction of breast wall alongwith pusta and construction of drain etc
SH C/o wire Crated protection work, C/o Diversion Channel and C/o Breast wall below Channel).SDP/2025/37