Loading…
Loading…
5,625 results • Best match
Construction of Retaining wall at RD. 0/00 to 0/021)
SH Co 12mtr Long retaining wall to protect the CCStone channel
C/O Retaining wall in front of Lal Kothi Storage Tank
Construction of Retaining wall at RDs 3/875 to 3/900)
Construction of Retaining wall at RD 2/750 to 2/770
Construction of retaining wall at RD 46 630 to 46 670
Construction of Retaining wall at km. 1/025 to 1/038)
Construction of Retaining wall at RD 5/110 to 5/117.50)
Construction of Retaining wall at RD 5/117.50 to 5/125)
Construction of Retaining wall at RD 1/430 to 1/460)
Term Contract for Maintenance and Repair of Cantt Fund Buildings in Jutogh Cantt for one year
RR damage to steel truss bridge 45mtr span over Pabber river at Badiyara Flood Mitigation protectionSH Co Concrete wall and wire crate protection wall towerds left bank of river at Badiyara bridge site aboutment protection) UNDER PDNA
Job 5 Construction of link road from Sunehra Bridge to Abadi near IPH Pump House Tehsil and Distt. Una at Km. 0-0 to 1-0 G.P. Sunehra Sub Head P.L GSB and C.O Retaining Wall Km. 0-0 to 0-120 Under MMSY
Restoration of rain damages on NH-70 New NH-03 on Jallandhar Hoshiarpur Gagret Amb Nadaun Hamirpur Taunidevi Awahdevi Sarkaghat Dharampur Mandi road from Km. 58/400 to 196/495 (SH Construction of PCC Retaining wall from Km. 63/370 to 63/395 LHS
Construction of Link road from Jole to Kainth via Choora Amroh Dharun Kuhroo Sanjhot road Km 00 to 14255 ic MT under NABARD RIDF XXIVSH Co 5 7 mtr wide Formation cutting Retaining wall Cross Drainage work, GSB,WMM MTU shape drain, Parapets KM. Sto
Const of link road Repoh Piploo to Sandhari Gurudwara Bye Pass Portion Piploo to Sandhari km 000 to 2000 SH Const of UVshape drain with protection work between km 000 to 1270 and Const of Retaining wall at RD 0775 to 0790 under MNP
Construction of School of Architecture Building in Rajiv Gandhi Govt. Engineering College at Nagrota Bagwan in Distt. Kangra (H.P.).(SH-Balance work of Retaining wall along with Nallah at RD 0/000 to 0/098 and Right side at RD 0/098 to 0/136)
Repair and Restoration in 31 Nos Schools Approved under PDNA 2023 in Dharampur Block Distt. Solan HP SH Construction of Damaged Retaining wall at GPS Sandhog PF Steel fabric fencing on existing R Wall Water proofing of School Building and PF G I She
Job 2 Construction of Boul Jhamber Lam upto Takka Bridge Mohalla Batia Harizen From Km. 0-0 to 8-745 Sub Head 5-7 Meter Wide Formation Cutting, Retaining Wall, Cross Drainage Work, P.L GSB, W.M.M. and 30MM Thick Bituminous Concrete, C.C. Pavement, U
Restoration of rain damages under LWSS PC Habitation of Arki Constituenct from Gambar Khad in Tehsil Arki District Solan HP SH Construction of RCC retaining wall with cutoff key on front side of pump house along khad to protect pump house base from e
Restoration of rain damages on Bathri Sundla Langera J and K Boundary road K.M. 28/0 to 93/400 (SH Construction of 6.37 metre span culvert over Sarog Nallah at R.D. 61/258 and Construction of PCC Retaining wall along both sides of slab culvert)
Job 3 Construction of link road Sidhyana to Menon Abadi Lower Dehlan km. 0-0 to 0-700 Sub Head C.O 6 mtr. Span Culvert at RD 0-260, C.C. Pavement at RD 0-225 to 0-400, C.O Retaining wall and wire crates etc.
Up Gradation of various path in ward No 23 Bhatta Kuffer (i) Path from Gupta Niwas to Chauhan Niwas (ii) Path from Sharma Niwas to Verma Niwas, Kanthala Niwas (SH Construction of Retaining wall on Paths Providing and Laying Chequred tile and M S Pipe
Improvement of Black spot on Oddi Khaneti Kotgarh road Km 0/000 to 21/000 SH Construction of Retaining wall in wire crate at RD 11/280 to 11/304 and W metal beam crash barrier at RD 11/280 to 11/312 Jalthi Nallah
Const of link road Chururu Dhussara via Seri Behri km 000 to 6500 SH Const of Retaining wall for upstream of box cell bridge both sides approaches along the Khad at RD 000 to 025 and Const of protection work at RD 3525 to 3536.50
Completion of Ambulance road from village Diana to village Mehlu GP Diyana km 0.0 to 1.500 Under MMSY SH Construction of Wing wall Retaining wall both side at RD 0.990 to 1.000 and Providing and laying Cement Concrete pavement at RD 0.450 to 0.6
Job 2 Restoration of rain damaged on link road to Village Upper Arniala via Bazigar Mohalla km 0-0 to 3-0 Sub Head C.O Retaining Wall at RD 2-625 to 2-640, 2-720 to 2-733, 2-900 to 2-930
Job 4 Construction of Link road from Baba Balak Nath Mandir Badehar Jhurowal to Sasan Lamlehra via Basti Pandit Cheelawala Badehar km. 0-0 to 1-140 Sub Head C.O Retaining wall, P.L Cement Concrete pavement in km. 0-0 to 0-150 Under OTMNP
DNIT for the work of Restoration of rain damages of FIS Hanuman Badog in Tehsil Arki Distt. Solan SH Construction of retaining wall for protection of Kuhal between RD 400 to RD 500 mtr and RD 1900 to RD 2000 at various point Under CRF
Repair and Restoration of Rain Damages Sanghnai to Kala Panga Km 000 to 6620 SH Construction of Retaining wall between RD 5500 to 5685 and 5800 to 5815 UShape Drain Between RD 5345 to 6600 and Wire Crate wall at RD 5600 to 5612 Under
Restoration rain damages on Rehari Gussan to Kathli Bharan road Km 0/0 to 13/0 (SH Construction of Retaining wall between km 3/435 to 3/455 and W Metal Crash Barriers between Km 3/400 to 3/500). Under PDNA blance amount.
Improvement of truck Parking chowk Barotiwala AND C/o road from Truck Parking Barotiwala to Himuda Mandhala (SH- C/o Retaining wall, P/L WBM grade-1, 2 AND 3 Berms filling, AND P/L 40mm Bituminous Concrete over 50 MM Dense Bituminous Macadam
Job 11 Construction of link road to Bangarh Panchayat to village Fatehwal Labana basti Mehatpur Handola road to Mehatpur Panchayat ward No.4 OTMNP Sub Head P.L GSB, WMM and premix carpet with seal coat, Retaining wall at RD.0-460 to 0-660 etc.
Construction of road leading from Junga road Chauhan Niwas Via Chandel Niwas at Roop Colony in ward No.26 Phanthaghti RD 0 0 to 0 198 Phase I (SH Construction of Retaining wall Cutting B wall etc in RD 0 118 to 0 198)
Construction of link road from NH-70 Saloha to village Badwal in GP Nounghi km 0/0 to 1/0. (SH P/L Wet Mix Macadam and 25mm thick BC in km 0/0 to 0/810 and Retaining wall, V-Shape drain etc.).
Improvement and Widening of Peo Karchham Shilti road km 0/000 to 11/635 (SH- ROFD, Providing of W- metal Beam Crash Barriers at various essential reaches in between km 6/200 to 7/000, C/o PCC Retaining Wall at various essential reaches in
Repair/ Renovation to Lokayukta office building at Shimla-2 (SH- C/O PCC. Retaining wall in front of Building at RD. 0/06 to 0/013 , providing and Fixing Casement window shutters (DGU) in First floor of Lokayukta office room , PVC. flooring in court
M.T on link road Saily to Handola via Kamoon Pattian and construction of link road Saily to Mahadev Mandir via GPS Laubowal from Km 0.000 to Km 14.640 under NABARD RIDF XXVII SH. Formation cutting, C/o Retaining Wall, wire crate, CD Work, CC Pavemen
Restoration of rain damages on MC road from Lakkar Bazar Bus Stand to Maszid idgah in ward No.2 Ruldu Bhatta RD 0 0 to 0 510 (SH Construction of Retaining wall etc RD 0 153 to 0 159 and 0 200 to 0 208)
Construction of road from Aghar Mandi to Thuian via Baniyana Village and G.P. Rey Km. 0.0 to 2.600 SH Formation cutting from RD. 0.00 to 0.350 Construction of retaining wall at RD 0.070 to 0.090 0.120 to 0.125 0.150 to 0.160 and providing and layi
Job 1 Construction of and M.T of link road Bhera Malkada to Panjora via Baba Balak Nath Temple including 1 No. Bridge Km. 0-0 to 8-635 Sub Head Formation Cutting , Retaining wall , Cross drainage work, GSB, WMM, 30mm thick SDBC, C.C. Pavement, U
Construction of road from Houri Devi Badnad link road to Rajeev Banta, Subhash etc house village Badnad, GP Bagroli Under SDP Deposit work SH Construction of Retaining wall at RD 0.460 to 0.466, 0.480 to 0.489, 0.510 to 0.519, Edge wall at RD 0.450
Job 5 Construction of link road GHS Behdala to Khindrian WSS Tank Mohalla Palasrian km. 0-0 to 3-0 Sub Head Construction of C.C pavement at RD.1-396 to 1-725, along with drain and Retaining wall at various RDs Under OTMNP
Soli investigation Job No 33MB/AMWP/01/2022-23 Aug of W/supply through borewell and upgradation of existing w/s scheme at Mil Stn D/Sala and Para-35 Provn and repair of retaining wall and rep/allied infra in Mil Stn D/Sala
A/R and M/O on link road to village Challan Km 0/000 to 1/000 SH Construction of Retaining wall at RD 0/300 to 0/345 0/382 to 0/420 0/429 to 0/480 and 0/495 to 0/510
Job 2 Construction of link road Kuthar Harijan Basti from Una- Jaijon road RD 0-0 to 4-0 Sub Head P.L 80mm thick interlocking paver block at RD 2-0 to 2-500 and Retaining wall 2-300 to 2-315.Under SCCP
Construction of Balance work of Kaloha Shantla road Km 0/00 to 16/720 (Section Km 8/0 to 16/720) Stage-II Under Nabard RIDF-XXV (SH. Construction of Retaining wall, Cross Drainage work, Cement concrete pavement, Metalling and Tarring, Road side PCC
xecution of Civil Work in 31 Schools approved Post Disaster Need Assesment PDNA 2023 SH C o of Retaining wall back side of school building at GPS Banwa and Repair and maintenace of Govt. Primary School at GPS Barar Colony Tehsil Arki Distt. Solan
Construction of cement concrete path from Hand pump to Mohalla Laliye Kashmir Singh Rajeev etc. Ward No. 2 in G.P. Tatwali SH Construction of retaining wall at RD 0.060 to 0.070 and providing and laying Cement concrete pavement at RD 0.0 to 0.180 Und
Restoration of rain damages on Ranital to Lunsu via Kuthar road in Km 0.0 to 1.700 SH ROFD, Retaining wall form RD 1.320 to 1.345 C.o V-Shape drain between RD 0.0 to 1.000 1.200 to 2.230, 2.870 to 3.370 P.L 80mm Thick paver