Loading…
Loading…
5,625 results • Best match
C/o Retaining wall and crash Barrier in Km. 0/050 to 0/080)
SH C/O Retaining Wall, Drain, Steel work in truss, CGI Sheet roofing etc.
SH Construction of steel boundary wall gate parking and retaining wall downside the building
C/o Retaining Wall in Wire Crate at RD 0/360 to 0/400
Construction of PCC Retaining wall at RD 3.430 to 3.445 and 13.670 to 13.685
Construction of Retaining wall Behind STP at Khaliyar RD 0 to 96 96 Rmt
Construction of PCC Retaining wall at RD 1.780 to 1.795 length 15mtr height 8.10mtr.
SH Construction of PCC retaining wall in Km0/016 too 0/041 Deposit work
Construction of PCC Retaining wall at RD 3.510 to 3.535 and 4.315 to 4.335
Construction of P.C.C. Retaining wall with Pusta at RD 2/620 to 2/648)
Construction of PCC Retaining wall at RD-12/260 to 12/290 under PDNA
Construction of wire crate in Retaining wall at Rd 22-745 to 22-780
REPAIR AND MAINT OF RETAINING WALL, PATH, DRAIN AND OTHER CONNECTED WORKS AT DALHOUSIE
Construction PCC Retaining wall with wire crate at R.D. 66/870 to 66/880
Construction of Retaining wall in wire crate at R.D. 0/630 to 0/637.50
(SH- Repair of retaining wall in CC 1 5 10 with 15 Percent Plums)
Sub Head Construction of Boundary wall and Retaining wall around the Kisan Bhawan Rehan.
Formation cutting, Construction of Retaining wall at various Rd 0/00 to 0/900
SH ROFD Retaining wall and Cross Drainage in km 0/540 to 1/0
SH C/o Crate wire Retaining wall at RD 0/255 to 0/274
Construction of Retaining Wall in PCC at RD 1 960 1 975 Under PDNA
CO Retaining wall to protect the MCS main line at RD 16930 to 16945
Construction of Retaining wall Back side of Transit accommodation Block No.4 mehli Shimla
C/O PCC Retaining wall at RD -5/600 to 5/640)(Under PDNA).
C/O PCC Retaining wall at RD-3/310 to 3/325).(Under PDNA).
Construction of Retaining wall at RD 185/750 to 185/765 and essential parapet
Construction of PCC Retaining wall at RD-1/140 to 1/170 under PDNA
Construction of PCC Retaining wall at RD-3/140 to 3/190 under PDNA
Construction of Crate wire Retaining wall at Rd. km.0/790 to 0/810
Construction of Retaining wall for protection of storage tank 1200000 liter capacity at Garouru
C/O at Retaining wall at Rd. 1/615 to 1/621.60)(Excluding GST
C/O Wire crate Retaining wall in km. 4/300 to 4/332.50) (PDNA)
Construction dismantalling and Retaining Wall at RD 3/725 to 3/732 ).Balance work.
Construction of PCC Retaining wall at RD-0/620 to 0/660 under PDNA
C/O Edge wall alongwith Khad and Breast wall alongwith road, C/O sitting steps, levelling of ground and U shape drain etc) Sports Deposit
Formation cutting in km .o.490 to 0.650 and Construction of Breast wall at RD 2.070 to 2.085, 0.680 to 0.700 and 0.440 to 0.455
Construction of 2 Nos. class room under RMSA, site development work by formation cutting by providing breast wall at RD 0/000 to 0/020
SH Repair works, Distempering, Painting Plastering etc. at AE Residence Nirmand and C/o Breast wall, Edge wall in the front of JSV Residential complex).
Portion Kuttan to Barandah mehkar kms 19/075 to 22/340 under NABARD RIDF-XXVI earth work, CD, Retaining walls, Drains, Parapits and M/T etc.
C/O PCC Toe wall alongwith C/O Wire Crated B/wall at RD- 3/850 to 3/880) (Under PDNA)
Construction of R/wall in wire crate with PCC toe wall at km 22/060 to 22/087 ) Under P.D.N.A. -2023
Construction of R/wall in wire crate with PCC toe wall at km 22/015 to 22/040 ) Under P.D.N.A. -2023
C/O PCC Toe wall alongwith C/O wire crated B/wall at RD- 0/140 to 0/160) (under PDNA).
Construction of RCC cantilever retaining wal, toe wall and apron river diversion removal of obstruction RD 49000 to 49292 292 Rmt)
Construction of R/wall in wire crate with PCC toe wall at Km 28/700 to 28/730 ) under P.D.N.A -2023
Construction of protection wall on both side of Nallah Bank
P/L C.C Pavement and Protection wall in various RDs
CO Protection wall at RD 0 to 19 19.00 Rmt
(SH- C/O approaches road wing wall and protection wall)
P/L C.C Pavement and Protection wall in various RDs)