Loading…
Loading…
5,625 results • Best match
Construction of Protection wall of Bridge at R.D. 0/015)
construction of Pcc protection wall at Rd 286 to 302
Construction of Protection wall of Bridge at R.D. 0/400)
Construction of Pcc protection wall at Rd 515 to 565
CO protection wall around the civil structures for 2nd stage
CONSTRUCTION WORK
C/O R/wall right side of dumping site.
C/O R/wall left side of dumping site.
Tender for Construction of RCC Foundation/Base for erection of 1No. 4Pole Str., 1No. 3Pole Str. And Construction of protection wall for 5Nos. Double pole str. To shifting of existing 22kV Old Kinnaur Feeder crossing over Pot Head Yard near HPPCL Powe
CO and MT link road Bharwain Duhal Bangwalan road near house of sh Suresh Kumar to vill Thanikpura upto Gugga Mandir and Radhey Shyam Mandir km00 to 1500 SH PL CC pavement and protection wall between km 1050 to 1250 under MNP
RRD rain damages on Link road to Lohara Ward No. 5 GP Baliana Km. 0/0 to 1/0 (SH C/o Protection wall from RD 0/129 to 0/149.50, 0/155 to 0/175 and 0/270 to 0/285)
Const of Jeepable road from Jole to Khurwain road to Seri Ward No 4 village Bhagnal to abadi Atma Ram Vinod Kumar Hem Raj Naresh Kumar in G P Ambehra Deeraj Distt Una HP SH PL 60mm thick Paver block in km 0170 to 0340 and Const of Retaining wall
Restoration of Rain damages of path from JIO to Khanog Km 0 0 to 0 115 and JIO to Mali House Km 0 0 to 0 296 (SH Construction of Retaining wall at RD 0 100 to 0 110 and RD 0 120 to 0 135) in ward No 10
Restoration of rain damages on Takarla to Upper Takarla road km 000 to 2500 SH Const of Retaining wall at RD 2000 to 2040 LHS and Const of UShape drain cum Edge wall at RD 2000 to 2100 RHS and both side berms at RD 2000 to 2095 under PDNA2023
Job 1 Construction of link road to Mohalla Naina and Rajputtan of Village Baliwal Tehsil Haroli Distt.Una H.P. km.0-0 to 1-465 Sub Head FC, filling, C.O Retaining wall at RD.0-345 to 0-375 and 0-490 to 0-585, 2Nos.2mtr RCC slab culvert at RD
Construction of Batra Nallah to Bijlidhar road Km 0/000 to 2/000 SH Formation Cutting 5/7 mtr wide Road Km. 0/735 to 1/270 and Construction of 900mm dia Hume Pipe Culvert at various RD including both side wing wall, C/O Wire Crate Retaining Wall/Wire
Restoration rain damages on Neripul Deothi Majhgaon road Km 0/00 to 12/00 (SH Providing and Laying WBM G -III,Metalling ,Tarring between km 8/00 to 9/00 ,Crash Barrier Between km 0/250 to 0/700 AND Retaining wall at Rd 10/075 to 10/096 PDNA
Job 1 Construction of link road Nagnoli to Harizan basti via Mohalla Brahmana, Gujran Chooti khad Tehsil Haroli Distt. Una km..0-0 to 3-345 Sub Head Providing and laying Retaining wall at RD. 2-895 to 3-055 and 3Nos. Hume Pipe Culvert at RD. 2-175, 2
R/R damages on road from Lohani Tindi to Bhujand Km. 0/0 to 8/915 SH C/O Crated R/wall at RD 5/045 to 5/075 and 5/940 to 5/955 and Retaining wall at RD 6/465 to 6/480, 7/640 to 7/650.
Special repair to Manglour Bridge at Km. 79.875 on NH.305 in the state of H.P SH. Construction Retaining wall in wire crate at RD 0.015 to 0.070 C.o R.wall in PCC at RD 0.170 to 0.180 and C.o B.wall in PCC at RD 0.170 to 0.190 on Diversion Road
Job 2 Construction of link road Shiv Mandir to Malahat via Chattara Dhesi Mohalla to Majra Una Aghar road to Ward No. Mohalla Bharamana to Hardan Wala Bag Lower Arniala Una Sub Head C.O Embankment at RD 0-0 to 0-300, Retaining Wall at RD 0-0 to 0-100
Job 9 Construction of Link road Lawana Basti Ispur to Dera Baba Damiyan GP Ispur Tehsil Haroli Distt. Una km. 0-0 to 4-100 Sub Head C.O Hume pipe culvert 900 mm dia NP2 at RD. 1-300 and Retaining wall at RD. 1-315 to 1-335 Under OTMNP
Construction of balance work Ukhoo Badal Jainagar road km 0/0 to 8/500 (SH- ROFD i/c retaining wall and B/wall.C.D.works.WBM Grade-I,II and III ,MT works ,PCC parapets ,V-shape drain, Logo board km stone in km 0/0 to 8/500) under NABARD RIDF-XXVIII
Balance work of special repair of Alterative road from Baramala Barrier to Industrial area Goalthai road in km. 0/0 to 4/165 (SH- C/o retaining wall at RD 0/085 to 0/090, 0/415 to 0/445, 0/885 to 0/900 and 1/013 to 1/034)
Balance work of Landslide mitigation measures for prevehahitiation of land slide disaster on link road from Ghumarwin Seer Khad Bridge to Nalwari Mela Ground Ghumarwin in km 0/00 to 0/400 SH C/o of Retaining wall at RD 0/178 to 0/213,C/o U-shape dr
C/o link road from Baliana Lamber Basti to Suked Km. 0/0 to 2/0 (SH cement concrete pavement in Km. 0/0 to 0/060, retaining wall at RD. 0/005 to 0/060 and providing and laying premix carpet in Km. 0/510 to 0/710) under MMSY.
Restoration of Rain Damages to FIS Kandaie in GP Samleo in Tehsil Dalhousie Distt Chamba HP SH C O PCC Retaining Wall at RD 1320 to 1328.50 8.50 Rmt removal slip at RD 0 to 660 660 Rmt and Laying jointing and testing of HDPE pipe 125 mm dia at
M/R to GPRA at Longwood and Craigdhu Shimla during 2023-24. SH: Replacement/Restoration of existing cracked/slided stone masonry gravity retaining wall into plum concrete wall including carrying out related items behind type-I quarters at Sylvan hall and below Craigdhu approach road at Longwood and Craigdhu, Shimla.
A/R and M/O to Residential and Non-Residential building at IIAS, R.P. Niwas Shimla. SH: Repair of compound, toilet of servant quarter, repair of G.I. water supply pipe line, repair of sheet roofing and provision of retaining wall near garage in Observatory Cottage IIAS, R.P. Niwas Shimla (H.P.).
Tender for prov SOP to Proposed 630 KVA, 11/0.4 KV S/STN LWSS Luhardi, 400 KV, 11/0.4 KV S/STN LWSS Doh Golu Sub Head- Tender for construction of Retaining wall for Protection of 630 KVA, 11/0.4 KV S/STN LWSS Luhardi UESD,Rewalsar.MED/R-29/23-24
Restoration of damages due to laying of pipeline on link road from Chhughera Sadoon Kandi road in Distt Kangra (HP) (Deposit work) (SH-Construction of retaining wall in Km 6/730 to 6/745, 7/745 to 7/090, 7/790 to 8/000 and 10/150 to 10/160).
F/C 5/7 mtr. Wide,R/walls, breast walls, Meetalling Tarring, Cross drainage, V-shape drain, Parapets, Dumping site, Stone in Km. 0/00 to 4/515) (RIDF-XXIX) (UNDER NABARD) (Including 5 years of routine maintenance)
(SH-C/O breast wall in wire crate in km. 1/475 to 1/497.50 and in C.conc.in km 2/045 to 2/075)Under SCSP.
SH GEOTECHNICAL INVESTIGATION
Construction of Head weirs, Curtain Guard Walls Desilting Tank Escape Structures Main Rcc Channels V Notch outlets Retaining Walls Wire Crate and Footpath crossing at Shiv Kuhl
Construction of Head weirs, Curtain Guard Walls Desilting Tanks Escape Structures Main RCC Channels V Notch outlets Retaining Walls Wire Crate and Footpath crossing at Nalhota Kuhl
Construction of retaining walls, construction of X-drainage work, construction of road side drain, including metalling and tarring, including 5 year routine maintenance after completion of work
Replacing the existing damaged truss, nut bolts, suspenders, guy ropes and construction of retaining walls etc and raising the deck level by 3.00 meter above existing level.
Replacing the existing damaged truss, nut bolts, suspenders, guy ropes and construction of retaining walls etc and raising the deck level by 3.00 meter above existing level).
Slope stabilization and rock fall mitigation works at Km.10/530 to 10/700 along hill side of link road to Village Nesang (SH- Removal of loose rock mass, Construction of Gabion walls in benches in sliding zones and providing Erosion mat in sli
M/R to GPRA under Bemloe Shimla dg. 2022-23. SH: Fencing of CPWD land for prevention of wild animals into GPRA Colony and provision of chequerred tiles and repair of retaining wall near Block-I, Type-III (GPRA) and Block-10 (CPWD Pool) at Bemloe Shimla. Subwork/Packages: Fencing of CPWD Land for prevention wild animals
Construction of Pusta and wire crated Retaining wall at R.D. 12/050 to 12/060)
SH Construction of Retaining wall at RD 1/880 to 1/900 with crash barrier
SH Construction of Retaining wall in wire crate at RD. 1/285 to 1/295
SH C/o Retaining wall at RD 4/951 to 4/973 with Crash Barrier
Construction of Retaining wall in PCC at RD 1 265 to 1 280 Under PDNA
Construction of retaining wall on washed away portion at Km. 33/435 to 33/455).
Construction of Retaining wall in km. 14/800 to 14/830 and 10 Nos Parapets.
Construction of retaining wall on washed away portion at Km. 32/300 to 32/315
SH C/o PCC retaining wall at RD 0/0 to 0/300. NTPC Deposit.