Loading…
Loading…
5,625 results • Best match
C/o Protection wall at Rd. 0/135 to 0/158.50) ( D.C. Deposit)
SH C.O R.wall in with PCC toe wall at RD 4.840 to 4.860,4.930 to 4.950 and Stone soling at RD 4.470 to 5.00 Under PDNA.
Construction of PCC Toe wall alongwith Wire crated B/wall at RD- 1/210 to 1/235 and 4/790 to 4/810). (Under PDNA)
C/O PCC Toe wall alongwith C/O B/wall at RD-4/640 to 4/652 and 6/090 to 6/105)(Under PDNA)
C/O PCC Toe wall alongwith C/O R/wall at RD-4/130 to 4/145 and 6/325 to 6/345) (Under PDNA
C/O Toe Wall of HP culvert at RD 2/150 and C/O U-shape drain at RD 2/130 to 2/230) (PDNA)
C/O Gabion crate wire R/Wall at RD. 11/760 to 11/785.
Job 3 Restoration of rain damages on Una Santoshgarh Mehatpur road km. 0-0 to 21-0 Sub Head C.O Retaining wall with U-shape drain in RD. 2-600 to 2-620 RHS , 3-760 to 3-770 RHS, 7-300 to 7-309 RHS, 7-300 to 7-303 LHS and 12-850 to 12-925 RHS
Job 1 A.R and M.O link road from Old Saloh Bhadouri road to Saloh Nalka 0-0 to 0-400 Sub Head Providing and Laying GSB, WMM, SS-1, RS-1 and BC RD at km. 0-0 to 0-400 and C.O Retaining wall RD 0-111 to 0-136, 0-176 to 0-200.
C/o Link road to Harizan Basti Dhadi village Fatoh km 0/00 to 0/230 SH Formation Cutting in km 0/00 to 0/130,Hume Pipe Culvert at RD 0/010 and Retaining Wall at RD 0/010 to 0/080 and metalling and Tarring at RD 0/00 to 0/130 under DMFT
Restoration and Rain Damaged on Kelodhar Patikari road Km 0 000 to 11 000 SH Construction of 900mm dia RCC hume pipe culvert with wing wall at RD 1 310 and 1 686 PCC Retaining wall at Rds 0 930 to 0 950 4 760 to 4 770 8 640 to 8 670 and 8 870 to 8 9
Restoration of rain damages on Joginder Nagar Sarkaghat Ghumarwin JNSG road km 95/00 to 103/300 SH C/o Retaining wall at Rd 97/068 to 97/078, 98/210 to 98/220, 98/480 to 98/500, 98/900 to 98/920, 98/850 to 98/870 , 98/875 to 98/890 and C/o B
Restoration of Rain Damages to Jagadhri Chachrauli Khizrabad Bata Chowk road km 45/880 to 53/300 ( SH C/O PCC Retaining wall from RD 47/120 to 47/131RHS and C/O PCC B.w at RD 45/970 to 46/028 46/060 to 46/096 46/810 to 46/830 47/770 to 47/790
Job 13 Construction of link road Ward No. 7 in Upper Delan Hinhas Mohalla to Jakhera P.L C.C. Pavement in RD 0-0 to 0-055 and 0-090 to 0-300 , P.L 80mm thick interlocking paver blocks in RD 0-055 to 0-090 and C.O Retaining wall at RD 0-125 to 0-3
Balance work of Repair and Maintenance of road from Sunhara to Tadoli km. 0/0 to 1/0 SH Construction of PCC Retaining wall at RD 0/450 to 0/465 0/705 to 0/715 and 0/840 to 0/855 and cement concrete pavement at RD 0/780 to 0/889 Under Chief Ministe
Improvement of black spot on Rast manal Chunoti road Km 0/00 to 15/960 (SH- widening of narrow curves at RD 1/465 to 1/675, C/o Retaining wall at RD 1/626 to 1/653, P/L interlocking concrete block in RD 1/610 to 1/660 and P/F Crash barrier in RD 1/6
C/o Link road from Kharial Basti to Chanoria Basti via Nai Basti,Chatak Basti ward No.2 GP Nalsuha (SH ROFD in Km 0/325 to 0/800, c/o Embankment in km 0/225 to 0/325 Retaining wall at Rd. 0/225 to 0/305nd solid causeway at Rd. 0/200 to 0/225) under
Job 1 Improvement of black spot Ajouli Santokhgarh Polian Road RD 0-0 to 17-900 MDR-39, Tehsil Haroli District Una Sub Head C.O Retaining wall , RCC Crash Barrier and P.F sign board at RD 9-0 to 9-150, 9-210 to 9-260, 9-315 to 9-365 and 17-760 to 17-
C/o link road from Lag to Harizan Basti, Rajput Basti, Ward No. 3 GP Baliana (SH Removal of Formation Deficiency, in Km 0/0 to 0/500, c/o Retaining wall at Rd. 0/250 to 0/285 solid causeway at Rd. 0/080. and 0/185 and CC pavement at Rd. 0/0 to 0/
Restoration of rain damages on Yol Banordu Barwala road km 0/000 to 7/745 in Tehsil Dharamshala, Distt. Kangra H.P. SH - Construction of Retaining wall at RDs 1/750 to 1/763, 1/763 to 1/775, 2/700 to 2/725, 3/075 to 3/090, 3/800 to 3/810, 4/300 to
C/o Circular road around NAC Ghumarwin Court Complex Tekri to Kulahru km 0/00 to 2/00 SH Formation cutting in km 0/850 to 0/950,C/o Retaining wall at RD 1/00 to 1/004 and 1/015 to 1/019,interlocking paver blocks in km 0/800 to 0/883 under MMGSY
Job 4 Restoration and Repair of road from Guga Mandir Haroli upto Payjal Yojna Haroli RD. 0-0 to 2-100 Sub Head Providing and laying 80mm thick BC at RD 0-045 to 0-320, C.O Retaining wall at RD 0-120 to 0-140 and C.O V-shape drain at RD 0-060 to 0-10
A/R and M/O to Residential and Non Residential building of NAAA yarrows, Shimla during 2023-24. SH: Repair of existing damaged gravity retaining wall infront of Koteshera Collage gate, repair of existing patterned stone pavement, restoration of rain water channelization/disposal System including carrying out connecting items in Yarrows Campus at NAAA, Shimla (H.P.)
A/R and M/O GPRA, CPWD Colony at Prospect Hill, Summer Hill and Boileauganj under RP Niwas section Shimla (H.P.). during 2024-25. SH: Levelling of existing sloping land by constructing plum concrete retaining wall for providing additional space as well as for prevention of soil erosion near Type-4 GPRA quarters at Prospect Hill Shimla (H.P.).
C/O Retaining walls at Rd. 3/030 to 3/060, widening of road at 3/00 to 3/045, Crash barrier at RD. 2/900 to 3/100)(Under SCSP).
C/o Building Portion, Providing Water Supply and Sanitary Installation, C/o Septic Tank with Soak Pit, Rain Water Harvesting Tank and C/o Boundary Wall and Breast Wall etc.
Construction of Breast wall at Rd 0/680 to 0/710, R/wall at Rd 0/680 to 0/695 and wire crate at Rd 0/710 to 0/740).
Construction of two Nos RCC Slab Culverts 1.50 mtr span including wing walls at RD 0/969 and 1/235 and Construction of Breast wall at RD 1.525 to 1.600
SH Construction of Breast wall at RD 2.330 to 2.350 LHS 2.460 to 2.480 RHS U shape drain with edge wall at RD 2.545 to 2.645 RHS Under PDNA 2023.
C/O left out work of Path from Surrender Mahajan towards Kapoor house in Ward No.6 Sub Head - P/L interlocking paver block, grating and C/O breast wall
SH- C/O Breast wall at RD 4/147 to 4/167, 4/175 to 4/180 and V-shape drain at RD 4/147 to 4/200) (PDNA-2025)
(SH- C/O PCC Retaining wall to protection the approach road for existing pump house at stage 1st )
CO Modular steel Water Storage Tank of 30000 ltr Capacity CO Retaining wall of protection of storage tank
Construction of PCC Retaining Wall at Rd.5/380 to 5/395 and 5/760 to 5/780
Construction of PCC Retaining wall at Rd.36/090 to 36/110 and 44/930 to 44/945
Construction of PCC Retaining wall at Rd.7/195 to 7/205 and 7/940 to 7/950
SH C O retaining wall with skin reinforcement along with apron at RD 23400 to 23650 (250 mtrs.)
Construction of wire crate Retaining wall in km 0.138 to 0.160, 1.015 to 1.037 and 6.950 to 6.962.50
Construction of PCC retaining wall at R.D. 6/823 to 6/834 and 6/840 to 6/850
Construction of PCC Retaining wall at Rd.1/980 to 1/995 and 1/972 to 1/980
Construction of PCC Retaining wall at Rd.10/270 to 10/315 and 10/690 to 10/705
SH Providing and laying GSB WMM BC Retaining wall and drains at RD 0/0 to 0/750
SH Removal of formation deficiencies by construcrting of PCC retaining wall at RD0/200 r to 2/220
SH C/O Retaining wall at RD 0/120 to 0/132 and 0/135 to 0/147
Formation cutting, Retaining wall, Brest wall and Wire crate in dumping site Km. 0/0 to 6/300
Construction of PCC Retaining Wall at RD. 4/450 to 4/490 and 7/190 to 7/235
Construction Of PCC Retaining Wall at RD. 8.660 to 8.684 LHS and 9.700 to 9.740 LHS under PDNA.
Construction of Embankment and construction wire crated retaining wall at RD -13/710 to 13/760 under PDNA
Improvement of curve, const. of Retaining wall, CD works and soling at RD 1/110 to 1/360
C/o retaining wall at Devgauri khad front side of LIS Sandhoot kakret pumphouse to protect villagers field