Loading…
Loading…
5,629 results • Best match
SH Construction of 5/7 metre wide road Formation Cutting Retaining wall Providing and laying 900mm dia Hume Pipe Culvert at various RDs
Construction of PCC Retaining wall at Rd.0/100 to 0/105, 0/390 to 0/405 and 0/445 to 0/452
Construction of PCC Retaining wall at RD-3/115 to 3/127 and Improvement of damaged road portion at various reaches).(Under PDNA)
Construction of PCC Retaining wall at RD-7/735 to 7/750 and Improvement of damaged road portion at various reaches).(Under PDNA)
Construction of retaining wall between Km 153/725 to 153/785 and Km 154/310 to Kms 154/361) against Smart City Project
C/o retaining wall at RD 0/890 to 0/898,0/910 to 0/920 and 1/100 to 1/110) Under PDNA
C/O PCC Retaining wall at RD-3/810 to 3/825 and Improvement of damaged road portion at various reaches). (Under PDNA)
Construction of PCC Retaining wall at RD-0/510 to 0/524 and Improvement of damaged road portion at various reaches). (Under PDNA).
Construction of PCC Retaining wall at RD-6/840 to 6/855 and Improvement of damaged road portion at various reaches).(Under PDNA)
PROVN OF 04 JCOs LIVING ACCN ALONGWITH RETAINING WALL FOR 136 I INF BDE GP AT POOH MIL STATION OF GE 863 EWS
Tender for providing Retaining Wall (Protection Work) to 33 KV Gaj-Kalapul Line at Sudher under Electrical Sub-Division No-II, HPSEBL, Dharamshala.
Construction of drain and hume pipe culvert at Km. 2/710 and Retaining wall at Km 2/860 to 2/869) under PDNA
Construction of retaining wall in wire create at km. 0/405 to 0/430 under Head repair and maintenance of road under SCSP).
Sub Head- C/O Sitting shed, wood store, Shamshanghat, Gate and retaining wall, boundary wall and laying of Interlocked pavers in court yard
Construction of Retaining wall at various Rds, HPC 900 mm dia at various Rds and embankment from Rd.0/340 to 0/385
Protection work by providing Retaining Wall in Wire Crate work at RD 2/825 to 2/872 and 3/220 to 3/230)
PROVN OF RETAINING WALL BEHIND BLDG NO P 10 AT JHAKRI IN THE AREA OF AGE BR II PMS UNDER GE 863 EWS
Prov. Estimate for Retaining wall in Back Side of Divisional Store Rajgarh damage due to Heavy Rain on July 2023 under ESD Rajgarh
Construction of PCC Retaining wall at R.D. 0/205 to 0/212, 0/212 to 0/220 and 0/220 to 0/226
C/O Retaining wall at RD 0/362 to 0/370 and U-shape drain at RD 0/645 to 1/0 LHS
( SH- C/O Retaining wall Plum Concrete 1 5 10 to protection for Existing Structure WTP Bedu farm at RD 7.50 to 15 )
SH Construction of Retaining wall RHS at R.D. 0.221 to 0.227 and providing and laying cement concrete pavement at R.D. 0.300 to 0.630
C/O PCC Retaining Wall at Rd 1/200 to 1/220 1/700 to 1/720 and 3/740 to 3/755
Construction of PCC Retaining wall at Rd.0/040 to 0/070 and PCC V- Shape drain Km.0/00 to 1/00
SH Wooden work, repair of plaste steel work P/L PCC Retaining wall, CC pavement in courtyard GI fitting other minor work etc
SH Widening of curves at RD 2/920 to 2/975 and construction of retaining wall at RD 2/935 to 2/960
R/O Rain damages on Parwanoo Gadyar road Km. 0/00 to 13/795 (SH CO Retaining Wall at Km. 10450 to 10485)
Providing and Laying G-I,G-II, Hume pipe culvert alongwith Retaining wall at Various rDs between Rd. 0/00 to 2/00
SH Construction of Retaining wall at RD. 2/205 to 2/265, 2/700 to 2/760 and 2/930 to 2/970
Repair and C/o Johad, Johad with spillway, Kuhal, Bouri, retaining wall, check Dam, wire crate check dam, RCC Check Dam, Tank, Disilting
SH Construction of PCC retaining wall at RD33/820 to 33/830 35/465 to 35/475 and 37/375 to 37/385
SH Construction of Retaining wall from RD 7/0 to 7/010 1/850 to 1/870 and 7/540 to 7/552
Construction of Retaining wall at Rd. 0/00 to 0/007 and 0/235 to 0/241 under BSP deposit SID.BSP/2024/799).
Construction of PCC Retaining wall at RD-0/470 to 0/755 and Improvement of damaged road portion at various reaches) (Under PDNA)
Construction of PCC Retaining wall at RD-0/345 to 0/360 and Improvement of damaged road portion at various reaches).(Under PDNA)
Repair Providing of damaged G.I wire crates Retaining wall near foot bridge including repairing of colony path at Intake of Andhra Power House.
C/o retaining wall at RD0/750 to 0/765 and P/l interlocking paver block 2/060 to 2/140) Under PDNA
Construction of PCC Retaining wall at Rd.7/220 to 7/235, 12/235 to 12/250 and 14/735 to 14/750
SH Formation Cutting from RD 0/00 to 0/825 and wire Crate for Retaining wall at RD 0/480 to 0/495
Construction of PCC Retaining wall at RD-1/915 to 1/930 and Improvement of damaged road portion at various reaches). (Under PDNA)
Construction of PCC Retaining wall at RD-2/515 to 2/529 and Improvement of damaged road portion at various reaches). (Under PDNA).
Construction of PCC Retaining wall at RD-3/610 to 3/623 and Improvement of damaged road portion at various reaches). (Under PDNA)
Construction of PCC Retaining wall at RD-1/435 to 1/449 and Improvement of damaged road portion at various reaches) (Under PDNA)
Construction of PCC Retaining wall at RD-2/710 to 2/723 and Improvement of damaged road portion at various reaches) (Under PDNA)
Construction of PCC Retaining wall at RD-1/130 to 1/144 and Improvement of damaged road portion at various reaches) (Under PDNA)
C/O path from H/o Sh. Chand Tailor to H/o Satish. (SH C/o retaining wall, paver block, and edge wall.)
Construction PCC R.wall)
Construction of protection wall using wire crate at head of the spring source 15 Rmt NDF/2023/249.
C-O Protection wall, P-F barbed wire fencing around storage tank and pump house tank Under SCSP
Construction of Protection wall for protection of Smt. Uma Sharma house in km. 1/975 to 1/989.