Loading…
Loading…
7,530 results • Best match
Refer BOQ
Side Protection
Civil work
side wall
Estimate includes construction of protection wall DR masonry providing crash barrier in dangerous area in link road construction of damaged parappet etc
Constructing a protection wall near Visitors Shelter for tourists Kudukkathupara Eco-tourism in Ezhamkulam Forest Station of Anchal Range during 2022-23.
MLA-SDF 2025-26 Smt.C.K.Asha, MLA- Construction of side protection wall for PK Kumaran Road (Thodu Side) in Vechoor GP, Ward 6
MLA-SDF-MLA-SDF 2019-20 Construction of protection wall for excise complex building in mananthavady LAC-Work-General Civil Work-1
Annual Plan-Pulikeezhu BP-2022-23- Construction of protection wall to Podiyady thodu in Nedumbram GP (2022-23)-Project. No.08/2022
PR No. 169/24-Construction of Side Protection Wall and Paving Interlock Cement Concrete Block of Nasrath Road in Ward No. 11
Malayalapuzha GP. Pro.76/2021-2022. Construction of side protection wall and Laying interlock at Adimuri -Valethu padi road in ward -8
The work consists of Scarification of existing bituminous road Dismantling existing damaged CC drain Quarry waste, GSB and WMM filling Construction of Bituminous road Construction of Retaining wall
Construction of compound wall for 220kV GIS Substation at Irinjalakuda - retaining wall with RCC, compound wall using solid block bricks, fencing with GI barbed wire, plastering, painting etc
NIP- protection works at the top of existing cut and cover and construction of retaining wall D/S left side at chainage 9300m of Vellayani west branch channel
In this estimate includes improving road surface with BM and BC the extension and rectification culverts and damaged retaining wall damaged CC Drain and traffic safety works etc
Ground Development work -Removing existing interlock and relaying the Interlock, Fencing and Compound wall Renovation work, Earth filling, Ground Protection work - DR Retaining wall, Drain and Inauguration stone
GENERAL-SR work 2021-22-Urgent Reconstruction of Damaged retaining wall and culvert extension in Kumaramangalam Kalloorkad road at ch 4/900 near koochan valavu-General Civil Work
widening works with GSB and WMM, BM, BC, Berm filling , drain with PCC M10 ,Sidewall m15 and wearing coat, Irish work culvert, DR retaining wall, traffic safety works
Construction of Cultural centre and Self employed Entrepreneurs hall( Demolishing existing old building, Civil works, Plumbing works and Electrical works), Construction of Culvert, Retaining wall of stream, etc.
DRM retaining wall of lengths of 8.5m and 26m with heights of 2.80m and 2.00 is near Triveni Bridge Ezhakunnel bhagom in ward no.4 of Parathodu panchayath
Construction of Retaining Wall Thalavoorkonam Pattupurakkal Ela Construction of Concrete Drain Thalavoorkonam Pattupurakkal Ela Construction of Tractor Bridge 4 Nos Thalavoorkonam Pattupurakkal Ela Construction of Ramp 2 Thalavoorkonam
This estimate includes provision for Potholes filling GSB WMM Leveling course opengraded 20mm premix Chipping carpet and providing provisions for the construction of retaining wall , concrete works etc.
RIDF XXV Infrastructure development works at padasekharams of Malampuzha Assembly constituency- construction of retaining wall for canal at Kannimarmuttu left-Chembana Palam thodu under Malampuzha krishi bhavan, Palakkad
repair of side retaining wall is considered in this estimate Ring bund bailing out water side wall lining with CC 1 2 4 are included in this estimate
Side Protection.
retarring retaing wall irish drain
Earthwork excavation Dry Rubble without concrete providing weep holes Centering and shuttering PCC RCC Dry stone pitching
SLAB AND RETAING WALL
ROAD
PLEASE REFER TENDER DOCUMENTS
ROAD MAINTANANCE
refer tender documents
RETENDER
The provisions included in the estimate are earth work excavation for foundation, DR masonry for rataining wall, M20 for intermediate and top belt, Back filling behind abutment, wing wall and return wall, M15 for cut parapet
FDR-2023-24-Urgent Construction of Side protection wall at Ch. 1.300 in Panamanglore Pathur Road Phase 2-2023-24-General Civil Work
Annual Plan-( Mallappally BP 2022-23 ) 71/23 Construction of Thoombunkal Laksham veedu Colony protection Wall in Kaviyoor Grama Panchayath--General Civil Work
Ground development works, Construction of Mud Multi court, Toilet Block, Drainage, Fencing, RR side protection wall, Inauguration stone, Name board and Electrification works
The side protection of the thodu D.R. protection wall is for lengths of 25m and 49m with heights of 3.5m and 2m respectively.
Annual Plan Karassery G.P 2022-23 Kolorakunnu Kandamkulam Moyillathu Road in Ward No 17 Project No 231-Side Protection Wall amp Road Concrete
Civil works
VANDANMEDU GP-MARATTILPADY ROAD CONCRETING IN WARD NO.7
SIDE PROTECTION
Road work
public/road work
protection work
road maintanance
Earthwork DR Packing DR Centering and shuttering CC etc