Loading…
Loading…
7,530 results • Best match
this estimate ioncludesc(1)GSB layer of 10cm thick,(2)RCC M20 for raod pavemnt and side protection belt (4) DR side protection wall
1. RETAINING WALL 2. DRINKING WATER FACILITY 3. INTERNAL ROAD / FOOTPATH 4. SANITATION (CONSTRUCTION OF DRAINAGE PIT) 5. RENOVATION OF HOUSES (28 Nos) 6. RENOVATION/CONSTRUCTION OF TOILETS (3 Nos)
Retaining wall , Renovation of Public Well ,Widening of Colony road , Construction of Concrete road , Construction of Foot path ,Protection of wall of house ,House maintenance , Solar Light , Readymade Septic tank
compound wall, Pavement with retaining wall, Pavilion, Restaurant, Boat Jetty, Children play Area, Chess Court, Snakes and ladders, Maze Garden, Path way with Planter Box, Path way with RR Wall.
Ground Development Works, Mud Football court, Retaining wall, Drain, Fencing, Flood light Foundation, Gallery, Compound Wall, Gate, Utility Building, Utility Building Plumbing, Sanitary Fittings, Borewell, Supply of Sports Equipment, Electrification
GSB and WMM , prime coat and tack coat, BM and BC,Drain works , irish drain , Retaining wall works,culvert reconstruction work , Interlocking Paver block rectification work and traffic safety items
Land Development - Earth Filling, Drain, Retaining wall, Fencing and Gate, Mud Court, Interlock Pavement, Synthetic Football Turf , Kerb, Fencing, Cricket Pitches, Security Cabin, Electrification works - Flood lighting, Street lighting, Security
dismantling existing window and providing and fixing door,inter lock and concrete work in yard,providing matresses,dinner set,supplying and fixing air hole cover and constructing Retaining wall etc
Provisions are given for earth work for foundation drain and retaining wall PCC 1 3 6 for foundation bed drain bed and vent way bed PCC M 15 for abutment
Earth work blasting the hard rock construction of DR retaining wall culverts with concrete drainage system Profile correction using granular filling GSB WMM BM and BC Road markings and signboards
Ground Development works - Earth Filling and Drainage works, Demolition of existing toilet, Construction of Fencing, DR retaining wall works, Office Room cum Toilet Facilities, Inauguration stone and Toilet Block electrification
Ground Development work-Construction of Multi purpose Mud Court,Toilet cum Change Room, Fencing, DR Retaining wall, Electric Pole Foundation, Borewell, Inauguration stone, Name Board, Floodlighting works, Toilet Block Electrification
Earth work in excavation Supllying and spreading special granular materials PCC Plain RCC m15 Supply fitting ang placing bar Plain RCC M20 clearing and grubbing road Back filling
Side wall
Road Irish Drain
Refer tender document
As per BOQ
Please refer tender documents
As per BOQ
ROAD WORK
Protection work
Road Side wall
Side protection
Protection work
construction of side wall, slab
Road Concrete
road tarring protection work
DR RCC CC HAND RAIL
Road side protection
PLEASE REFER TENDER DOCUMENTS
Building
PWD WORK
Providing retaning wall drainage and concrete flooring work
Maintenance work
Re construction of compound wall
Ring bund , Const of Apron , Abutment , Pier foundation , Loose Apron , Lining of Pier , FRP shutters , D/R protection wall 2 x 19 m - 2m ht
The proposed estimate is protect the sides of thodu for a total length of 77 m. D R protection wall 2.80m and 2.00 m height
maintenance of 11 no of houses, construction of protection wall using RR Masonry, maintenance of 4 no of toilets, construction of a cattle farm etc
Deepening from Ch 0 to Ch 1825 m for an average depth of 60cm , DR protection wall for a length of 10m with height 2.50m
Proposed work is to protect the left side of DR protection wall for a total length of 67m length 2.5m and 15m length 1.50m height
Ground Development - Construction of Mud Football Court, Toilet cum Changing room, Fencing, Retaining Wall and Electric pole foundation, Step Gallery, Borewell, Long Jump Pit, Inauguration stone, Name board and Electrification works
Earth work in surface excavation, Soiling, VDF RCC road with RMC.Expansion joint with blow bitumen and cement mortar, providing GSB at sides of road. PCC , RCC retaining wall, Steel reinforcement works.
Ground Development work, Con. of Mud Multipurpose Court, Renovation of existing structures, DR Retaining wall, RR Step Gallery, Electric Pole Foundation, Nylon Net Fencing, Interlock, Entrance Gate, Collection Pit, Inau.stone, Electrification
Estimate proposes for the reconstruction of Two cuverts situated in the ch.17/000,17/400 and one culvert extension along with construction of damaged retaining wall at ch.18/040 RHS
Finishing and Sanitary works of Generator cum OH Tank Building and Construction of compound wall work includes roofing, finishing and sanitary works retaining wall compound wall around building Paving interlock tiles