Loading…
Loading…
7,522 results • Best match
(RE-TENDER 1)Annual Plan-2023-24 Kattappana B P Cement Paalam Thodu Protection Wall-in Ayyappancoil GP Pro 53/24
GENERALNIP Flood DamagesConstruction of side protection wall at the left bund of Chenkal Major branch canal near Ch165m General Civil Work
Reconstruction of Damaged Protection Wall and Toilet Block at Aralam Wildlife Sanctuary in Aralam Wildlife Division during the year 2025-26
Madavoor GP (Pro.No. 104) 2020-2021 Changayilkonam Chira Manaluvattom SC Colony Panthalathuvathukkal Road Side Protection wall Construction in Ward No -5
PROJ NO 164/2026-27 WARD 20-22 THRIKKAKARA MUNICIPALITY -CONSTRUCTION OF SIDE PROTECTION WALL IN KALACHAL THODU WARD 20-22
Annual Plan-2025-2026 / Project - 215 / Construction of Protection wall to Deepening the Pulickalthodu Ward-2 ( Rs. 9,00,000/-) -General Civil Work
Annual Plan-KVPDY BLOCK 19/2025-2026-Construction of Side protection Wall of Karumali cheekappilli thodu in Rayamangalam GP ward 17
Elampalloor Grama Panchayath 2024-25 Revathy Bhavanam To Achu Bhavanam Road Concreting and Construction Of Side Protection Wall in Ward-6
Annual Plan-Project no 554/25-26,TB circular 12 Acre road protection wall maintenance ward 2-MGP-General Civil Work
Annual Plan IDP 2025 26 BYSONVALLY G P GHSS BYSONVALLY TILE PROTECTION WALL COMPLETION 1083 26 General Civil Work RE TENDER
Annual Plan-BELLUR GP PROJ NO 90/26 Construction of Side wall protection wall at Nakoor Nidiadka Thod-General Civil Work
Annual plan 2022-23 - District Panchayath Idukki - Concreting of Leading channel and construction of protection wall to the drainage chal at block 2 and 3 in SSF Karimannoor
In this estimate, construction of a protection wall in DR masonry with provided RCC M20 for belt and shoulder strengthening
Retaining Wall 1.10 m height, Retaining Wall 1.30 m height, Retaining Wall 1.60 m height, Retaining Wall above bed rock 1.30 m height, Retaining Wall above bed rock 1.60 m height
Back Filling of Side Protection wall at upstream left bank (Balance Reach) of RCB at Chamravattom across Bharathapuzha
Construction of Protection wall and Vehicle shed for the Ladies Staff Quarters Building at Athirappilly Station Compound in Athirappilly Range During 2022-23
Annual Plan-PR.NO.605/25-26-Construction of protection wall and culvert at valiyavarambu road ( vyssery union shed vazhy) in ward 5
GENERAL-SH Munnar-Kumly R/W 75/050- Urgent construction of Protection wall Culvert extension in Munnar kumily ch. 75/050-
IMPROVEMENT OF VILAYILMOOLA JCB ROAD,CHERUVALLIMUKKU-KALYANIKKAVILA ROAD,PANKULAM ROAD AND SIDE PROTECTION WALL OF KALLUPALM-KEEZHEKUNNIL ROAD IN WARD-21
SP-Rain damages-Reformation and Construction of roads including side protection works forming drains retaining walls etc and resurfacing from ch0/000 km to 20/200 km retaining wall at breached portion at ch 3/400 R/S
The estimate includes construction of retaining wall, platform for rain water collection and storage tank, installing already procured PVC pipes andwater tanks of 10,000 L capacity and allied works
The proposed project involves the reconstruction of a small stretch of the retaining wall, painting of building, interlocking tile paving, and other repair works for the staff quarters building at the Thommankuthu Eco Tourism Centre.
Flood damage 2019-20 special repair works -construction of retaining wall, culvert and drain between km 3/900-4/100 of Sultan Bathery- Malavayal- Ambukuthy- Ambalavayal road
Various Civil Works such as Parking Sheds, Toilet Block, Retaining Wall, Road Work, Painting etc and Allied works at Milma Malappuram Dairy Project site under MRCMPU Ltd.
NABARD RIDF Infrastructural development works in various padasekharams under different krishibhavans of Malampuzha Legislative Assembly Constituency, Palakkad District Construction of retaining wall and canal under Akathethara Krishibhavan
DEPOSIT NIP Kulathoor GP Construction of Retaining wall near ch 21565m on the right side of Kollamcode branch canal at Muzhanguvila in Uchakada ward General Civil Work
Annual Plan-Veliyanad G P 2023-24, Maintenance of road from Kalarithara to Puthenparampu by constructing Retaining wall in ward No. 6-(Project No. 71)-General Civil
SR 2018-19 (Court issue) Construction of retaining wall to avoid threat to house between km 6/050 and 6/200 of Kattikkulam Panavalli Sarvany Thirunelly road
Annual Plan-2024-25. Poruvazhy GP Proj No.241/24-25- extension of culvert and retaining wall construction at Paruthivila Thenguvila canal road ward7-General Civil Work
Annual Plan-Vattavada GP 2023-24 Kottakkamboor - Thattaampaara road maintenance and retaining wall at Kuruppuswaamy Kovil portion in ward 4(152/24)-Road Work-General Civil Work
GENERAL-RETAINING WALL AT KM 3/500, CULVERT AND STRENGTHENING SHOULDERS AT KM 2/500 TO 4/000 OF PANNIMATTOM POOMALA METHOTTY ROAD-RESTORATION OF BREACHED PORTION
Pr155 22 Construction of retaining wall from Jilla panchayath bridge towards east toprotect Kandukrishi thodu in ward 9 of kainakary G P under anual plan 2021 22
FDR 2025 26 URGENT CONSTRUCTION OF RETAINING WALL IN KANDAMKARY NEDUMUDY UMBUKKATTUVARAMBINAKAM VELLAMATHRA KAYALPURAM KANNAI ROAD IN BETWEEN CH 2 850 TO 3 150 General Civil Work
REPAIR MAINTENANCE OF RETAINING WALL HARD STANDING BRICKWORK PLASTER GRILL GRATING DRAINS CULVERTS AND CERTAIN BR MISC WORKS FOR RESIDENTIAL AREA AND TECHNICAL AREA AT NPOL KOCHI
VBP- 2022-23-Protecting the outer bund of Kunnathumparambu padasekharam 60um padam by constructing retaining wall from Chathanadupadi to Kochupurackalpadi in ward No3 of Muttar Grama Panchayath
Formation of yard and Construction of Retaining Wall and Cable trenches in connection with First phase of KunnamkulamTransgrid Down stream works at 110KV Sub Station Compound, Kunnamkulam
Upgradation of 66kV Substation Adoor to 110kV Site levelling and Construction of retaining wall for 2 nos of 110 kV feeder bays for Adoor Enathu DC feeders
Providing BM BC to Kutty Sahib road in Kadamakudy Panchayath ch 2/600 to 3/200 and providing retaining wall at ch 1/300 to 2/300
Jal Jeevan Mission (JJM) WSS to Arakkulam and Velliyamattom (part) panchayath Part II Package VI- Construction of retaining wall in Intake Well site and Various tank sites
Sub Flood Damage Works - Providing Side Protection works and River training works to Nellikkuth Bridge in Manjeri LAC in Malappuram Dt - Investigaton works to Retaining wall - reg
GENERAL-FDR (SR)- Construction of Retaining wall at Panayur in Vaniamakulam Vallapuzha Road Between km 02/800 to 02/900 LHS-In Shornur LAC-General Civil Work
AMRUT Design construction and commissioning of 3 MLD WTP and 10LL OHSR at Mulayam Construction of retaining wall at Mulayam Pump House Package 4 General Civil Work
SLTF 2019-20 Reconstruction of collapsed retaining wall on Kavannur -Vadakkumala-Karaparamba Road in between km 5/300 and 5/400 in Ernad LAC in Malappuram District.
Adyanpara SHEP Construction of RCC Retaining wall along the river to Protect the road to weir near Power House eroded in the flood occurred in August 2019
Minor Capital works at FSD Angadipuram for the year 2022-23 SH Construction of retaining wall on the east and north side of the MG-3 godown
Chengannur block Panchayath 2018-19 MPLADS Construction of side protection wall culvert and concreting puvanneth colony kariyilithara Road in Venmony Grama Panchayat
Proj.no 83/2025-26 Ward 2 Thrikkakara municipality -Construction of side protection wall and tile in Shanthi nagar thodu at ward 02
Sasthamcotta Block Panchayat .Pro No S0177/24 Construction of Protection wall and Drain at Panampuram Road - in Ward 16 Kunnathur Grama Panchayat
Annual Plan-ADOOR MUNICIPALITY 2023-24 PROJ No.166/24 CONSTRUCTION OF SIDE PROTECTION WALL AT VARIYATH ELA ROAD IN WARD 11
Annual Plan-Vattavada GP 2024-2025 Construction Road Protection Wall From Ammankovil to Periyavayal Portion-Project No- 132/25-General Civil Work