Loading…
Loading…
7,522 results • Best match
GENERAL-FD-Construction of side Protection wall in Anakkatty Sholayur road km 6/700 (LHS) and 8/300 (RHS)-General Civil Work
Annual Plan-IDP/2023-24 CONSTRUCTION OF PROTECTION WALL TO KULATHINKAL KULAM IN KODIKULAM GP (267/24) General Civil Work E Quotation
Work Name Pro No 91 19 20 Mattakkadu salafi quarters byelane road tile work and Protection wall for thodu in ward 12
419/2017-2018 CONSTRUCTION OF PROTECTION WALL AND CONCRETING WORKS AT PARAYAN KULAM LITTLE ANGLE ROAD IN WARD-23 OF THRIKKAKARA MUNICIPALITY
KRP Flood Damage 2019 Construction of Protection wall and Re-construction of Canal formation near chainage at 380m of Padinjareveedu branch canal
GENERAL FDR Flood damage and Land Slide Urgent construction of side protection wall at CH 1/300 of Akkode Valiyattuthazham Mundakasseri road
Annual Plan-Project NO-244-23-24- FORMATION AND SIDE PROTECTION WALL FOR VELIYAKATH THEERADESHA ROAD IN WARD 16 OF THURAVUR GP
GURUVAYUR MUNCIPALITY 2020-21 Pro No SO151/21 FORMATION TARING RAISING AND SIDE PROTECTION WALL AT REJIWOOD WORK ROAD IN WARD- 33
SLTF 2019-20. Urgent repairs to road and protection wall on MankavuKanniparambu road between Ch. 14/500 and 14/600 (SLTF 5)
Proj.no-50/2025-26 ward 10 Thrikkakara municipality -Tile paving and side protection wall in Vayanashala EMS bye road at ward 10
Annual Plan-2023-24 MANGALAM GP WARD 7, 13, 14- PRO. NO. 137/23-24,CONSTRUCTION OF VALIYATHODU PROTECTION WALL FIRST REACH
Annual Plan DP 2023 24 CONSCTRUCTION OF SIDE PROTECTION WALL FOR K K PURAM PADINHAR SC COLONY ROAD IN CHENGALA G P
Cheerakuzhy scheme-SDRF-Rectification works to LBMC including breached side protection wall and road between ch.17/300 km 17/450 km
Annual Plan-Erattupetta Municipality Project No 382/23-24-Eelakkayam -Pump house Road Maintanance Protection Wall Ward 8 (10L) General Civil Work
GENERAL-2025-26 Malappuram municipality Panakkad anganvadi side protection wall in ward 36 Project No. 783 -Centre No 146- General Civil Work
Annual Plan KVPDY BLOCK 225/ 2024 25 Maintenance of Checkdam and construction of side Protection wall in Mekkappala Thodu in Vengoor GP
Annual plan -2023-24 - Construction of Side Protection Wall To Thirumalakkeri Kannimelpadi Road Ward-18 in Chennithala Thripperumthura GP - Proj-71-TENDER
Annual Plan-Manjeri Municipality 2024-25 , Project No- 398-construction of protection wall in kezhiyad colony in ward 27-General Civil Work
Retender-Payyavoor Grama Panchayat Annual Plan 2024-25 Project No - 117/25 Repairs to the side protection wall of chamakkal elikkulam Road
Annual Plan-Project No-247-23-24-SIDE PROTECTION WALL FOR MILMA PANAYATH ROAD IN WARD 13 OF THURAVUR GP Re tender
Annual Plan-Karoor GP 2022-23(251/23)-Construction of Protection Wall to Konnackal Illathunkal Road in Ward 9-General Civil Work
AMRUT-GURUVAYUR MUNICIPALITY CONSTRUCTION OF DRAIN SIDE PROTECTION WALL AND ROAD LEVELLING AT INDUSTIAL ESTATE ROAD W 38 41 General Civil Work
Construction of protection wall for Kolanji chullithai road in ward 14 of Mararikkulam North Gramapanchayath-2025-26/Annual plan-General Civil Work
Annual Plan-MLPTM Project 181/2025-26- PALANGATT KARIYIL ROAD SIDE PROTECTION WALL CONSTRUCTION Ch 0/094-0/127 IN MALAPPATTAM GP
Annual Plan-Construction of Culvert and Side Protection wall in Aniyilappu - Aramathupattanam Roadin ward 13 of Teekoy G.P-TKY/50/2023-2024
GENERAL-CSM 2024-25-Construction of bund protection wall on the right side of LBMC near ch.10/500km - General Civil Work
Annual Plan-Erattupetta Municipality Project No132/23-24-Koormulamtadam Road Protection Wall and Concreting Ward 12 (2L )- General Civil Work-RE TENDER
School of Gandhi an Thought and development Studies - Providing truss work on the top of building and protection wall using solid block
Construction of Side Protection wall and Shutter arrangements in Malamelkunnil and Shutter arrangements in Mangulam Vairamangalam at Estate Ward of Thiruvananthapuram Corporation-
AMRUT-Kottayam Muncipality (Kumaranalloor zonal)2023-2024-Construction of side protection wall for Karyambadam pond in ward no 51-General Civil Work
Construction of protection wall and flume in Mekkulam channel near the house of Sri. V.K.Mathew(Exe service) at Kaippattoor in Vallicodu Panchayath
Thannithodu GP Pro No 194/22-23 Construction of Side protection wall and road maintanance Meemutty Edakkannam Subhalayam padi Road ward-13
GENERAL Providing Drainage facilities at Ch 2/100 Providing protection wall ch 6/70 of Ambalappuzha Thiruvalla Road General Civil Work 1
GENERAL H FWD Annual plan 2023 24 Minor works Side Protection wall at IMCH Govt Medical College Kozhikode Work General Civil Work
Annual Plan-Erumeli GP 2025-26 Improvements to Protection Wall Cheenimaram Edakadathy Sub Centre Road Ward 15-PR 219-General Civil Work
Protection wall for Location No. 35 of 110 kV tower in Madakkathara-Kunnamkulam (1MDKN) and Madakkathara-Athani(1MDAT) line under LMS Viyyur
Annual Plan-2025-26, Construction of Kalakkal RRF protection wall - second stage-Pro. No. 307/26, ward No. 21 of Nedumpana GP
Annual Plan-Manjeri Municipality 2024-25 , Project No- 397-construction of protection wall in pananilath colony in ward 26-General Civil Work
GENERAL-Budget 2025-26 (Substitution Work) Improvements to Panayil - Kalappila Road- By providing Side Protection Wall and Road concrete-General Civil Work
MLA-SDF-Malampuzha LAC-2025-26-Construction of Shutter and Protection Wall in Suryachira Thodu in Puthussery GP ,Palakkad-General Civil Work
Annual Plan-.-IDP/2022-23 Kadukacity SC colony side Protection wall in Vellathooval G P (615/23 )-General Civil Work Re-Tender
DEPOSIT SP Rain damages Reformation and Construction of roads including side protection Works forming drains retaining walls etc and resurfacing from ch 0 000 km to 20 200 km TS road between Ch 12 350 km to 12 500 km General Civil Work
constructing retaining wall with DR masonry for 7.30 m length and 4.10 m height with an intermediate belt, road concreting using PCC 136 and M20 concrete formation of road using GSB and WMM, then providing graded M20 PCC for base coarse
The estimate includes dismantling of existing Irish drain 3nos at 6.50 m length each, and construction of new Retaining wall new culverts 3 nos wing walls and Irish cross drain etc Existing 12 m X 3.30m bituminous surface is scarified a
PRO NO 348/24-25 SIDE PROTECTION WALL AT CHENNILAM ROAD WARD NO 6 IN KADAKKAL GRAMA PANCHAYATH
GENERAL-AE/MIK/EST-Construction of side protection wall of Thettiyaar thodu at upstream of Mudimoola bridge in Andoorkonam ward of Andoorkonam Panchayath-General Civil Work
DR Retaining wall - 1.00m ht. DR Retaining wall - 1.50m ht.
Retaining wall - 1.25Ht, 20 Rm Retaining wall - 1.5Ht, 155 RmHt
On the left side of the thodu, an old concrete protection wall, one meter high, half a meter wide, and 25 meters long, built by the Irrigation Department fell into the thodu due to the rain and flood last monsoon and is blocking the flow.
Annual Plan-PR NO 101/25 Ikarathodu Vettimattom Road Side Concreating Hand Rail Protection wall Ward 7 in poonjar GP(300000/-)-PNJR/AE/101/25-General Civil Work