Loading…
Loading…
1,136 results • Best match
Construction of 05 Nos. retaining wall, laying tiles on floor and side for storage of cleaned water in UG Sump for coal production by LHCM at Bartarai UG mine of Amadand UG Sub Area, Jamuna Kotma Area.
De-silting of area between retaining wall and OB dump, near wharf wall, culverts, mobile crusher near wharf wall area and cleaning of overflown silt at various places of mines as and when required at Amlohri Project
Requirement of monsoon of related surface work like drain cutting, cleaning, making etc and subsidence crack filing and allied item retaining wall, hume pipe culvert etc. For Vindhya UG Mine under Pinoura Sub Area of Johilla Area
NIT SCHEDULE FOR CONSTRUCTION OF SLAB CULVERT AT GRAM PANCHAYAT PACHAUR GOVAR KUNDI MAHALLA ON KUDIYA NALLAH SUB DN DEOSAR DISTT SINGRAULI 1NO SINGLE SPAN 3M 01 NO DUBLE SPAN 8M PCC APPROACH ROAD AND RETAINING WALL
Road Repair Related Work (WBM, BT Patch, Retaining Wall, Guard Wall, Shoulder And CD Repairing On Risk And Cost And Other Work) All Repairing And Other Necessary Work (Barricading, Helipad) For VVIP Tours Under P.W.D. Division Morena
Road Repair Related Work (WBM, BT Patch, Retaining Wall, Guard Wall, Shoulder And CD Repairing On Risk And Cost And Other Work) All Repairing And Other Necessary Work (Barricading, Helipad) For VVIP Tours Under P.W.D. Sub.Division Morena
Construction of A type school building 09 staff Quarters Boundary wall Retaining wall Ramp for handicapped upto 1st floor and other facilities as per KVC norms for Kendriya Vidhalaya at GC CPRF Nayagoan Distt Gwalior M P
Construction work of approach C.C. Road and Toe Wall at Takipur, Distt. Sehore.
Construction of 3 nos siphon,12 nos. V.R.B., protection wall of aquaduct, Pitching work and balance work of riprape of escape Channel of Main Canal to Tehriya Nala under Semri Tank
Heightening of existing face wall and providing protection wall of existing 02 nos Hume pipe culvert near boom barrier and Lanhgi nallah at KOCP of Nowrozabad sub area of Johilla Area
Construction of (01 No) Fire Protection Wall at Nepanagar 220 KV S/S, (01 No.) at Chhegaon Makhan 132 KV S/S and (01 No.) at Bahadarpur 132 KV S/S .
CONSTRUCTION OF APPROACH ROAD OF VILLAGE - PANYA, NALWAY and RASWA, WITH HP CULVERTS THREE ROW AND SINGLE ROW 1000 mm Dia, PROTECTION WALL FOR AGRICULTURE LAND, TEHSIL ANJAD / THIKRI, DISTRICT - BARWANI.
Construction of 07 (Seven) Nos. Brick work retaining wall, Cleaning of galleries, Construction of 01 Nos. Pump foundation and cutting of 02 Nos. drain in L.K.II seam of Jamuna 9/10 Mine, Bhadra Sub Area, Jamuna Kotma Area.
Construction C.C. Road at Ward No. 03, 13, 02, R.C.C. Drain At Ward No. 12, 08 and 15, Paver Block Ward No. 05 and R.C. Retaining Wall At Ward No. 02 (Total 8 Work), Bichhua Under MMAS - IV
Detailed Estimate For Balance Work Of CC Road, Footpath, Storm Water Line, Central Median, Retaining Wall, Existing Electric Line Shifting Work From Sarvate Bus Stand Juni Indore Bridge To Macchi Bazar Square Via Chandrabhaga under Kayakalp scheme (F
CHIEF MINISTRY URBAN INFRA DEV SCHEME CMUIDS CONSTRUCTION OF CC ROAD AT WARD NO 1 FROM BRISINGPUR ROAD TO SARASWATI SCHOOL CONSTRUCTON AND FOOT AND WEST BOUND OF SHANKAR JI TALAB AND RETAINING WALL CONSTRUCTION OF CC ROA
Road Repair Related Work (WBM, BT Patch, Retaining Wall, Guard Wall, Shoulder And CD Repairing On Risk And Cost And Other Work) All Repairing And Other Necessary Work (Barricading, Helipad) For VVIP Tours Under P.W.D. Sub. Division Ambah
Filling and leveling fencing, retaining wall, drain and approach road works at various water logged at 33/11 kv s/s (Gatajhalkoi, Bamorekalan, Rahichouraha, and Garetha) at O and M Division Pichhore under O and M Circle Shivpuri
Road Repair Related Work (WBM, BT Patch, Retaining Wall, Guard Wall, Shoulder And CD Repairing On Risk And Cost And Other Work) All Repairing And Other Necessary Work (Barricading, Helipad) For VVIP Tours Under P.W.D. Sub. Division Sabalgarh
Work of Sluice Well Repair and Jacketing, Waste weir Protection wall work, Earthwork in Main Dam, Main and minor Canal Lining, Construction of VRB repairing of existing structures of Indla Tank Project.
Construction of (02 Nos.) Fire Protection Wall at Chhatarpur 220 KV S/S, (01 No.) at Nowgaon 132 KV S/S and (01 No.) at Lav Kush Nagar 132 KV S/S .
Construction of ROH Scrap yard in lieu of existing scrap yard in NKJ, construction of approach retaining wall for diversion of existing road near DLS_NKJ and other miscellaneous civil works in connection with Katni UP Grade separator project of WCR
Convert 2 Nos. Open Platform to Covered shed at Mandi yard Bedia, Leveling with road, Internal Road, Drainage, Retaining wall at New Chilly Mandi and Drain or CC work at Old Chilly yard of Mandi Samiti Bedia Distt. Khargone
Filling and leveling fencing, retaining wall, drain and approach road works at various water logged at 33/11 kv s/s (Sunhari, Karai, Bijroni, Khatora, and Indar) at O and M Division second under O and M Circle Shivpuri
Construction of Retaining Wall , Repair CD Approaches , WBM Patch Repair and Shoulder Cutting and Filling To Proper Slope at Kshipra Budi Barlai Solsinda Khandakhedi Jamodi Maharajganj Biloda Nayta Panod Sanwer Road ( MDR-45-03O) Road Ch 11000 to 215
CONSTRUCTION OF CC ROAD AT WARD NO 06, CONSTRUCTION OF RETAINING WALL AT WARD NO 06, BAVER BLOCKS WORKS AT WARD NO 09 KABRISTAN LAST GATE, DRAIN AND PAVER BLOCKS WORKS AT WARD NO 05 UNDER VISHESH NIDHI FUNDS
Filling and leveling fencing, retaining wall, drain and approach road works at various water logged at 33/11 kv s/s (Fatehpur, Ratore, Lalgarh, Rajoua, sirsod pohri) at O and M Division First under O and M Circle Shivpuri
Repairs of Bridges, Culverts, Protection Wall and Shoulders work and different roads in Sub Dn. Pachmarhi. 1st Call, PAC Rs. 9.62 Lacs on Road SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.
Special repair of construction of protection wall on Budhwada to Bamhangaon road under Hoshangabad Sub Dn. 1st Call, PAC Rs. 8.65 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 60 days.
CONST. OF C.C. ROAD AT DEHRI VILLAGE, SEMRI VILLAGE, 40 JHUGGI APROACH, PIPALIYA KESHU NEAR TEMPLE AND RETAINING WALL AT DEHRI KALAN VILLAGE, PAVER BLOCK AT SHUBHALAYA PARISAR AND FENCING WORK AT PARK NEAR GANESH MANDIR PRIYANKA NAGAR WARD 84, ZONE
Repair and renovation of drain cum retaining wall (1000 Mtr) from pole no 4/29 to 4/13 and 3/15 to 4/5 against the colony side of railway track at Nowrozabad siding under Nowrozabad sub area of Johilla Area.
CONSTRUCTION OF CEMENT CONCRETE ROAD RETAINING WALL 2 NOS SINGLE ROW HP CULVERT 1 NO DOUBLE ROW HP CULVERT, RCC DRAIN COIL FENCING ON EXISTING BOUNDARY WALL AND 4 NOSM OF GUARD ROOM AT SHRAMODAYA VIDHYALAY AT BETMA KHURD INDORE MP
Special repairs of Guard wall, Retaining wall, Drains of damage portion by heavy rain at Mahadev road, Pachmarhi. 1st Call, PAC Rs. 19.47 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 90 days i/c rainy season.
Construction of CC Road From Mr. Idu Hanvat House to Mr. RameshPatle House, From Mr. RameshPatle House to Mr. Kukase House and From Mr.Kukases House to Bandar Jhiriya Kosmi along with Cross Drainage and Retaining Wall in Ward No. 32 Balaghat
Cons.of cc road,drain,retaining wall and pipe culvert in wd.08 and 11 Under MSAVY Phase-4 and renewal and construction of cc road in wd.01,02,03,04 and 05 under rajya shasan ghoshna AT CSA NAGAR (BHABRA) DISTT ALIRAJPUR
Cleaning of 2RE Sump of Burhar VI Bottom seam for increase the capacity of Sump and Construction of 10 Nos. Retaining wall to around 2RE Sump adjacent to 6m. down through Fault of Burhar VI Bottom seam at Damni UG mine
Repairing of Bridges, Culverts, Protection wall different roads, Sub Division Seoni Malwa. 1st Call, PAC Rs. 19.39 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection Wall and Shoulders work and different roads of Sub Division Seoni Malwa. 1st Call, PAC. Rs. 19.46 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 90 days.
Work for Filling of deep trench formed near electric yard of old intake well (slope protection work) of Indore water supply project.
De-silting of area between retaining wall and OB dump, near wharf wall, culverts, mobile crusher near wharf wall area and cutting of kacha drain and cleaning of overflown silt at various places of mines as and when required at Amlohri Project.
De-silting of area between retaining wall and OB dump, near wharf wall, culverts, mobile crusher near wharf wall area and cutting of kacha drain and cleaning of overflown silt at various places of mines as and when required at Amlohri Project.
CONSTRUCTION OF RETAINING WALL AT LOWER LAKE NCC TRAINING CENTER
Repairing of Bridge, Culverts, Protection Wall of different roads of Sub Dn. Pipariya. 1st Call, PAC Rs. 10.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection Wall of different roads of Sub Dn. Narmadapuram. 1st Call, PAC Rs. 15.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection Wall of different roads of Sub Dn. Pachmarhi. 1st Call, PAC Rs. 10.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Design and Construction of 03 VUP at Billowa Tiraha 1197.280 Kalyani Chauraha 1200.250 and Arru Tiraha 1216.000 for permanent rectification of MoRTH identified Blackspot locations along with Gabion wall in Jaurashi Ghati 1192.000 to 1192.700 LHS and
PROVN OF ONE ROOM AT BLDG NO. P-189 AT JAK RRC, SPL REPAIR TO EXISTING TOE WALL AT BLDG NO. P-22 AT GRC, SPL REPAIR TO P-39/1 AT EGYPT ENCLAVE AND SPL REPAIR TO BOUNDARY WALL AT BLDG NO. P-205 OF AGE B/R-II UNDER GE (W) JABALPUR
Construction of Retaining Wall near Modern Dairy at BMF, Bhadabhada, Bhopal
Repairing of Bridge, Culverts, Protection Wall of different roads of Sub Dn. Seoni Malwa. 1st Call, PAC Rs. 10.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing work of Protection wall, approach roads and pipe laying and wearing coat at Seoni Malwa Sub Division. 1st Call, PAC Rs. 19.55 Lacs on Road and Bridges SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.