Loading…
Loading…
1,136 results • Best match
Special Repair Work On Cds (1) WKKP Road Km 10/4, (2) ACS Road Km 7/8, 8/4, And (3) Inder Singh Ki Chouki App Road Km 3/4 Total Cds 4 Nos Slab Culvert Pipe Culvert Retaining Wall Under Pwd Sub Div Alirajpur.
Construction of 03 Nos. Retaining wall, 05 Nos. PCC foundation for pump in 9D sump and MD Sump and 04 Nos. platform for UG electrical sub station in Johilla Top Seam and Johilla Bottom Seam at Pali UG Mine, Pali Sub Area of Johilla Area
CONSTRUCTION OF 01 ACTIVITY ROOM, 01 STORE ROOM, 02 PRACTICAL LAB, 02 READING/COMMON ROOM IN BOYS HOSTEL, 01 READING/COMMON ROOM IN GIRLS HOSTEL, 04 TYPE-2 QUARTER, RETAINING WALL FOR PLAY GROUND AND OTHER WORK AS PER RFP AT EMRS UKWA BALAGHAT
Construction of 03 nos. retaining wall, 02 Nos pump foundation, Sump cleaning, creation of new Sump and laying and Jointing of 6 inch pipe line to expedite the preparatory work for systematic withdrawal of 03 Nos. HT Pump in Jamuna 1/2 to surface.
Construction of A type School Building 09 staff Quarters Boundary wall Retaining wall Ramp for handicapped upto 1st floor and other facilities as per KVC norms for Kendriya Vidhalaya at GC CRPF Nayagoan Distt Gwalior MP SH providing and supplying of structural design and drawing.
Repairs of Bridges, Culverts, Protection wall and Shoulder works of different roads at Makhan Nagar under Sub Dn. Narmadapuram. 1st Call, PAC Rs. 19.62 Lacs on Road and Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.
Repairing of Bridge, Culverts, Protection wall of different roads Seoni Malwa, Sub Division, Seoni Malwa. 1st Call, PAC Rs. 18.73 Lacs on Road and Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 60 days i/c rainy season.
Construction of (01 No.) Fire Protection Wall at Gourjhamar 132 KV S/S, (01 No.) at Garhakota 132 KV S/S, (01 No.) at Banda 132 KV S/S and (01 No.) at Hatta 132 KV S/S .
Repairing of Bridge, Culverts, Protection Wall of different road of Sub Division, Seoni Malwa (Section Dolariya). 1st Call, PAC Rs. 19.56 Lacs on Road Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection Wall of different road of Sub Division, Seoni Malwa (Section Dhekna). 1st Call, PAC Rs. 19.37 Lacs on Road Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection wall different road of Sub Dn. Seoni Malwa (Section Dolariya). 1st Call, PAC Rs. 19.99 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection wall different road of Sub Dn. Seoni Malwa (Section Dhekna). 1st Call, PAC Rs. 19.95 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
CONSTRUCTION OF EMBANKMENT IN KM 56/8, 61/2, 65/10, 40/4-6 CONCRETE WORK IN SHOULDER IN KM 56/8 TO 10 SURFACE DRAIN BETWEEN KM 4 TO 70, CONSTRUCTION OF RETAINING WALL IN KM 114/10 ON NH 347 B BETUL ASHAPUR ROAD
Repairing of Bridge, Culverts, Protection wall of different roads at Dolariya Section, Sub Division, Seoni Malwa. 1st Call, PAC Rs. 19.15 Lacs on Road and Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 60 days i/c rainy season.
Construction of Protection Wall, RCC Drain, CC Road, MP, MLA, Janbhagidari fund in Sub Dn. Seoni Malwa. 1st Call, PAC Rs. 14.96 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection Wall of different road of Sub Division, Seoni Malwa (Section Seoni Malwa). 1st Call, PAC Rs. 19.94 Lacs on Road Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Special repairing of Protection wall of division office technical section and water proofing work of slab of division office, Q.C. office, F Type Bunglow, E Type Bunglow, Rest House attendent quarters and pump house at R.A.B.L.S. bargi colony Narsin
Repairing of Bridge, Culverts, Protection wall different road of Sub Dn. Seoni Malwa (Section Seoni Malwa). 1st Call, PAC Rs. 19.90 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of pot hole of dumper parking and toe wall of diesel filling point at site workshop at Jhingurda
Construction of Escape channel at R.D. 14 Km of L.B.C. from existing channel at R.D. 398 M to 510 M (approximate) , Construction of chute fall approximate 06 M and join the nala to revinse Sindh river including Construction of protection wall
CONSTRUCTION OF JALI OF RETAINING WALL AT WARD 22 GAD KAILASH MANDIR RATLAM
Construction of Retaining Wall at Baag Munshi Husain Lake under Lake Conservation Cell.
CONSTRUCTION OF RCC COVERED DRAIN IN LIEU OF BRICK DRAIN NEAR SPORTS COMPLEX OF HQ MB AREA AND PROVN OF RCC RETAINING WALL AND BOX TYPE CULVERT AT APPROACH ROAD OF CHILDREN SCHOOL AT MANEKSHAW ENCLAVE IN THE AREA OF AGE B/R-I UNDER GE (WEST) JABALPUR
Construction of retaining wall at RD 9012m of LBC construction of 16 No. of lining pannels in LBC and 18 No. of lining pannels in RBC of Bijna Medium Tank. Construction of 2 No. VRB in escape channel concreting of Pipe in VRB at RD 2130m in Tolapi
Re-tender for Construction of Retaining Wall near Modern Dairy at BMF, Bhadbhada, Bhopal
Construction of RCC Retaining Wall and other Work ward No 026 under NP Guna
CONSTRUCTION OF RETAINING WALL IN (1)WARD NO. 1 NEAR MASTAN AMAA DARGAH ON KHARLA NALA (2) IN WARD NO. 1 NEAR GANDHI SCHOOL ON KHARLA NALA (3) IN WARD NO. 15 NEAR NH 52 UDBHAV NAGAR KHARLA NALA AND (4) CONSTRUCTION OF OPEN DRAIN IN WARD NO. 1 NEAR CO
CONSTRUCTION OF RETAINING WALL AND BOUNDRY WALL OF MODEL COLLEGE RAMPA IN DISTT- SINGRAULI (M.P.)
Construction of Single Span Slab Culvert, Approach road and Retaining wall on Chitora Approach road
RETAINING WALL NIRMAAN NAYI PULIYA KE PAAS GANDHARV NADI BLOCK GANDHWANI DIVISION MANAWAR DISTRICT DHAR
Construction of A type school building 09 staff Quarter Boundary wall retaining wall ramps for handicapped upto 1st floor and other facilities as per KVC Norms for Kendriya Vidhalaya at GC CRPF Nayagaon Distt. Gwalior MP SH Hiring of Inspection Vehicle for Assistant Engineer Gwalior Project Sub Division No 1 CPWD Gwalior MP
Repairing of RCC wall and Toe wall at Intake well Hirani Under Narmada Water supply project Estimate based on MPUADD Building Works, 2012
CONSTRUCTION OF CC ROAD AND RETAINING WALL UNDER CM INFRA PHASE 4 AT NAGAR PARISHAD OBEDULLAGANJ
Colouring, Repair and Retaining Wall Work at Kamla Park to Boat Club under Lake Conservation Cell.
ward 09 me jauri talab khurd me rcc protection wall nirman work
Protection wall around OHT Located at Basant Kunj Ward 50 Under Zone 09
REJUVENATION AND STRENGTHENING WORKS OF GODHULIYA TALLAB, NEAR KHARMOUR WILDLIFE SANCTUARY, SAILANA UNDER AMRUT 2.0 SCHEME PLANTATION, DE SILTING, TOE WALL, STONE PITCHING, STEPS PATHWAY.
Class-E, Category a (i) and as per NIT documents
Construction of Retaining Wall and Fencing at Bagh Munshi Husain pond in ward No. 09 Zone No. 05
Construction of RCC retaining wall at 33 11 KV Sub Station Karanpur under O and M Division Sohagpur
Construction of Staff Quarters at (Silpara, Govindgarh, Baghwar, Rampur Naikin, Churhat and Sidhi station along with balance work of under construction quarters at Silpara and Govindgarh Station, OHE Depot and Tower wagon shed at Rampur Naikin & ... work, Retaining wall , ... wall, Toe wall , ...
CONSTRUCTION OF FLOOD PROTECTION WALL D/S OF L/S ABUTMENT OF SIPAWARA BARRAGE
Construction of RCC retaining wall 50 meter at 33 11 kv Substation Khapadiya under O and M Division Bareli
FOR CONSTRUCTION OF FLOOD PROTECTION WALL D/S OF R/S ABUTMENT OF BORKHEDI BARRAGE
AS PER NIT
Special repairs of outer damaged plaster texture painting and interior painting of National Power Training Institute Shivpuri. (MP) SH:-Painting of 4 nos. type-4 qtrs. replacement of 13 nos. mummty door, providing wiremesh at boys hostel windows and ... cover, retaining wall and ...
Rejuvenation and strenghthening works of talai near sheetla mata mandir palduna road namli under amrut 2 scheme plantation,de-silting,toe wall, stone pitching,steps,pathway,fencing work
REJUVENATION AND STRENGTHENING WORKS OF FOOL TALAI, NEAR MUKTI DHAM, DHAROLA, RATLAM UNDER AMRUT 2.0 SCHEME (PLANTATION,DE-SILTING,TOE WALL,STONE PITCHING,FENCING WORK OUT FALL REPAIR)
NAVEEN ZILA PANCHAYAT BHAWAN KE CAMPUS ME PEVAR BLOCK, PIPE CULVERT EVAM PROTECTION WALL NIRMAN KARYA
C.C. Road construction drain and retaining wall with Dalantola to Dhanaura Ma Shala and Panchayat Bhawan reached 880 meters. Dhanaura, District Shahdol