Loading…
Loading…
1,921 results • Best match
CANAL STRUCTURAL WORK
Renovation of canal works
Earthwork in Formation, Cutting, Construction of Minor Bridges, Building Works, P-Way Works, Approach Road, EIMWB, Retaining Wall, Supply of Cement, Reinforcement Steel, etc. for Construction of Railway Siding for Talcher TPP (2 x 660 MW)
BALANCE WORKS OF EARTHWORK IN FORMATION, CONSTRUCTION OF MAJOR MINOR BRIDGES, RETAINING WALL, DRAINS, SUPPLY OF PSC SLEEPERS, TURNOUTS SLEEPERS, SUPPLY OF BALLAST, P. WAY FITTINGS TRACK LINKING WORKS, CONSTRUCTION OF BUILDING AND ALLIED WORKS FO
Earthwork in formation, Construction of Major and Minor Bridges, Retaining Wall, Drains, Supply of PSC Sleepers, Turnouts Sleepers, Supply of Ballast, P. Way Fittings and Track Linking Works, Construction of Building and allied works for Development
Construction of both side protection wall and bed lining in between RD 00m to 125m off-taking of WCs MDL at RD 2157m of Gunderpur Sub-Minor for 2025-26.
S/R to Mahanga to Sipura Road in the District of Cuttack for the year 2024-25 From RD-2/324 to 2/654 Km and Retaining Wall Ch In Between 2/400 to 2/500 Km
Earthwork in formation,Construction of Major and Minor Bridges,retaining wall, Drains,Supply of ballast, PWay Materials and Track linking works, Construction of building and allied works for Rail Connectivity for proposed Phase II SILO at Lakhanpur
CANAL STRUCTURAL WORK
Canal Structural work
Restoration work
Balance Ph-I work of Earthwork in formation, Construction of Minor Bridge, Retaining Wall, Protection Work, Drains, Supply of PSC Sleepers, Turnouts Sleepers, Supply of Ballast, P. Way Fittings and Track Linking Works, Construction of Building and al
Road work
CANAL STRUCTURAL WORK
Laying of pipeline, Construction of storage reservoirs(100000 ltr. Capacity ESR . Capacity UGR,boundary wall,protection wall, laying of infiltration gallery, pumping arrangement ancillary works including providing FHTC pws to Ramagiri under r.udyagi
Construction of 4.0 ML WTP, Laying of DI Distribution System, Railway, NH Crossing by HDD Method, WTP Site Development, Construction of Recycle Pond, Retaining Wall, Laying of Washout Line, Hume Pipe Drain, Installation of DG Set and OM for 5 Years
CANAL STRUCTURAL WORK
IMPROVEMENT OF DRAINAGE CHANNEL
Earth Work, RCC,PCC, Rigid smooth,Providing weep hole,RCC hume pipe,Rough stone dry packing etc
Improvement of canal
Const. of both side protection wall in between RD 180m to 200m and 930m to 970m of Bansara Minor under Critical Lump 2024-25. (Working RD 180m to 200m and RD 930m to 958m)
Const. Of right side Protection wall from RD 58580.00m to 58650m and both side guard wall and bed lining in between RD 58655m to 58700m of Huma Tail Disty. under Critical lump 2026-27.
Protection Work
Extension Cord, Door Clouser, Garden Buried Pipe, Glass Self, Photo Frame Light, Garden Water Pipe, Painting of garden retaining wall flag post tile and terracitta, Grass Mat, Dustbin, Godrej Almirah, Air Conditioner, Wall Paneling, Wooden Chair, Torch Light BOQ Title BOQ BID
Canal lining and structure works
Road Work
Civil works
Earth work and structure work
Canal work
Providing C.C.lining
Renovation of Canal Works
CANAL WORK