Loading…
Loading…
60,451 results • Best match
Construction of Retaining wall in Main Building for Circuit House Ajmer (Addl. Work)
CO Retaining WALL NHO AB RASHEED ITOO AND OTHERS AT SHALIWUDAR At ZAINAPORA
CO Tile Lane With Retaining Wall Near Ho Mushtaq Gul Dar At Darbagh
CONSTRUCTION OF RETAINING WALL AT MAHESH VERMA GEETA NAGAR WARD 72 ZONE 16
Construction of Retaining wall at CMC colony in Ward No. 60. East zone.
wn 33 const of retaining wall at ramghat RHS connect old piching wall
Construction of Retaining Wall at Aadakara Street Drainage 25m in Ward No 27
CONSTRUCTION OF RETAINING WALL FOR NALLAH AT EKTA SOCIETY IN PRABHAG NO.35
Construction of RCC Retaining wall near Oil shed plateform at Area Store Gwalior
Jaganathpur to Turubudi road Asset Road Retaining wall, , PMC,SC 0.000 to 0.270
IMPROVEMENT OF JINAZGAH B/W/O RETAINING WALL AND GRAVEYARD AT PETH KANIHAMA
Construction of Retaining wall with Footpath at Nehrunagar near Sumathi house
Construction of Retaining Wall at Annanthampi Kurisumala Road in Ward 11
Slope Protection to Left side of River Jonk down stream of RD Bridge from 750m to 1030m near Dharambandha village for the year 2025-26
Improvement and construction of slope protection of Goriguda distributary within RD 1.720km to RD 3.550km of RMC of SIP, Malkangiri for the year 2023-24.
Improvement of canal including slope protection work and renovation of structures of Bagad S-M-II under Non-Plan (Critical) for the year 2020-21
Improvement and construction of slope protection of Nilimari distributary within RD 0.950km to RD 4.020km of RMC of SIP, Malkangiri for the year 2023-24.
Slope protection and river training works at right bank of Kali river downhill of MAT of Power House by restoration of spurs and wire crates
Annual maintenance Contract for Tunnel Works, Station Buildings, Security Barracks, Bridge works, including Slope protection works on Katra - Banihal Section of USBRL Project, J&K
SLOPE PROTECTION AT SUBHAIGADHERA NALLA SITE AT EXISTING CHAINAGE KM 20.05 ON JOSHIMATH MALARI ROAD NH 107B THROUGH EPC MODE IN THE STATE OF UTTARAKHAND
Slope protection scheme from EL 680 M to EL 770 M on the D/S side of recently treated slope of right side of spillway
Providing slope protection with apron wall along the garland drain at embankment near steel dome bridge of Balram OCP under Hingula Area (Monsoon 2021-22).
Improvement and construction of slope protection of Malkangiri distributary within RD 1.850km to RD 3.420km of RMC of SIP, Malkangiri for the year 2023-24.
Package C-2 Restoration of drainage System and Slope Protection works at Bye Pass Tunnel Area and Penstock Area, at Loktak Power Station in Manipur
Slope protection works on approaches of Kalichabad Minor Bridge on existing road portion of NH-56 at Km 220.678 in the State of Uttar Pradesh
Operation and Maintenance Power House/Power Plant - Slope protection work of platform & construction of steel structure stair at Gorbi mines Pit no 03 Gorbi Singrauli
Pavement of IPB street with side drain and toe wall at Village - Dhanana - lst, Block and District - Bhiwani (Scheme - VAGY)
Construction of Retaining wall on Luna left embankment near Jagannathpur village pond
Const of Retaining Wall of Ranisar Pond At Vill Chappar jogiyan ( DMF )
Protection wall
protection wall
protection wall
Construction of security cabin, retaining wall, drains, culverts and allied works at NSSC, Bangalore for Sports Authority of India - Phase-II
Construction of Retaining Wall at Sawki to Mangbari Road Km. 0/00 to 5/00 (VR-67), Tal. Deola, Dist. Nashik
ReTarring ,Retaining wall and Drainage Facilities
Construction of Retaining wall and Drain
Retaining Wall under Boxanagar RD Block
Protection work of embankment, toe wall and other miscellaneous works in connection with Powerkheda - Jhujharpur UP and DN flyover.
ADEN/HQ/II Subdivision - Bank protection work like toe wall, pitching and cess repair works in DO-GGC section.
Const. of 50Futta Road With Both Side Toe Wall at village Fatehpur ( Payment will be made by panchayat samiti)
R/C Estimate for Construction of Toe wall park opp. #289 and BSNL office Ph-3A MC SAS Nagar.
Construction of Toe wall with pitching ,fencing and remaining levelling dressing of ground at 132 KV GSS Sagarpada (DHOLPUR)
Construction of Toe wall and Pucca Khul section at RD 300m and 1250m at main canal of LIS Dadwara.
Renovation of dry stack Toe wall from C.I.S.F Camp to entry point of Gokul Park NTC under Lodna Area
Development of Play field at Zachaldara Handwara, Kupwara by way of earth cutting / filling and construction of Toe Wall.
Const. of toe wall for road in Shiv Nagar Gali No 1 in ward No 12 in MC Dharuhera
HEW 117 Construction of brick toe wall on entry point of dividing road in sector 64 and 65 Faridabad
Repair Renovation of ARCS Office Building at Rangat including chain link fencing and CC toe wall. SW - Providing IEI
Paint work of toe wall M.S.flat Railing ,Gate and Benches in Green Belt Sector 48,Chandigarh under Revenue Head
Construction of Brick on edge Rasta with toe wall in village Bhutana Jafrabad Block Sonipat Distt. Sonipat Cost 10.38