Loading…
Loading…
3,984 results • Best match
Widening from Intermediate Lane to Two Lane and Strengthening at km 33/0 - 34/0 of Tharangambadi - Manganallur - Aduthurai Road including Construction of retaining wall at km 33/4,33/8. TRY-60
Widening from Single Lane to Two Lane and Strengthening at Km 10/6-11/6 of Semmedu - Sellipatti - Arapaleeswarar Kovil Road including Construction of Retaining Wall and Construction of Culverts (SLM-82)
Strengthening of BT Road, Retaining wall and Culvert at Vandal Harijana Street, Vandal Vadakku Street, Vandal South Street, Vandal Nadu Street, Vandal East Street and Vandal Village Road in Thalainayar Town Panchayat
Dismantling of existing damaged RR Masonry wall and Providing RCC retaining wall Chainage from 0.00M to 15.00M at 230KV SS yard (Southern side of SS yard main road) of K.R.Thoppur 400KV SS
KPSHEP - South West Monsoon - 2019 - Flood damage rectification works - Providing PCC retaining wall on the cutting side in between CH-8950m to CH-9450m on the road leads PH-6 from Emerald.
Construction of PCC retaining wall on the earth slipped location along the cutting side at the hair pin bend No 4 18 on the road leading to Porthimund from Power House 6
Widening from Single Lane to Intermediate Lane and Strengthening at Km 3/0 - 6/685 of Kaveripattinam - KRP Dam Road via Kalvehalli including Construction of CD Works and Retaining Wall (SLM-97)
Widening and Improvements, Improvements to Riding Quality including Construction of Culvert, Retaining wall and Drain works in Govt. Road in respect of Thiruvarur and Kodavasal H C AND M Subdivision TRY-84
Providing Cable duct, Culvert, Transformer Structural plinth, RCC retaining wall, Metal spreading and filling the site with gravel and all allied civil works for the proposed New Elur 110/22 KV SS.
Dismantling of existing damaged RR Masonry wall and Providing RCC retaining wall Chainage from 47.00M to 64.00M at 230KV SS yard ( Southern side of SS yard main road) of K.R.Thoppur 400KV SS
Improvement works by providing protection wall to Lawn in front of portico and along the front side of main building at Central office premises, Mannarpuram, Trichy .
Special repairs to damaged protection wall. Pavement and vehicle shed in Assistant Executive Engineer, PWD Buildings (C and M) sub division, Kancheepuram Quarters at Varadharajapannai, Kancheepuram
Rectification work in cumbum canal sluice weir by providing PCC toe wall, filling with gravel, rough stone dry pitching and pointing to the rough stone dry pitching on the u/s of the earthen bund left and right flank in PV-4 SHEP.
Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 5/8 of Kalangani - Thirumalaipatty road including Construction of Well Protective Wall, Retaining Wall and Reconstruction of Culvert (SLM-85)
Widening from Two Lane to Four Lane and Strengthening at Km 0/0 - 4/850 of Hosur Inner Ring Road including Providing Median, Drain, Construction of Retaining Wall and CD Works (SLM-85)
Urban Improvements, Widening and Improvements, including Construction of Retaining Wall, Drain, Reconstruction of Culvert and Providing Paver Block Works in the Government roads of Vathalagundu (Highways) C and M Sub-Division (MDU-030)
Widening from Single Lane to Intermediate Lane and Strengthening Strengthening Improvements to Riding Quality and Construction of Retaining wall on Government roads in Coimbatore South H C and M Sub Division CBE 042
Package No. 65 Widening and Improvement works including upkeeping for a period of 60 months, CC Pavement, Construction of Retaining wall and CD works in Walajah (H) C and M Sub Division Jurisdiction
Improvements at km 1/500 - 4/050 of Cumbum - Cumbummettu Road including Construction of Retaining wall MD 90 works in the Government roads of Uthamapalayam Highways C and M Sub Division MDU 087
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Reconstruction of Box Culvert, Construction of Well Protective Wall and Construction of Retaining Wall in Sankari (H) (CandM) Sub Division (SLM-26)
Widening and Improvements, Widening of curve CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in Thalavady H CM Sub Division Jurisdiction Package No 11
Widening Strengthening including Reconstruction of Box Culvert Culvert Widening of Box Culvert Slab Culvert Construction of Retaining wall and Well Protective wall Works in the Government roads of Athoor Highways CandM SubDivision MDU020
Strengthening at km 39 0 40 8 of Ooty Kotagiri Mettupalayam Sathi Gobi Erode Road including Cement Concrete Drain and Retaining Wall at km 39 4 39 6 and 40 2 CBE 016
PACKAGE-44 widening, Improvements Improvements to Riding Quality, culvert, Retaining wall, work including up keeping for a period of 60 months in Govt. Roads in respect of Aranthangi (H), C and M Subdivision.
Package84 Widening Strengthening and Improvements of Government roads in Thirumangalam and Periayur H C and M SubDivision including construction of Protective works Reconstruction of culvert construction of Retaining wall, and CD works inc
PACKAGE 75 Improvements, Improvements to Riding Quality, Reconstruction of culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Aranthangi H, CandM Subdivision.
Package No. 75 Widening and Improvement works including upkeeping for a period of 60 months, Junction Improvement, Construction of Retaining wall and CD works in Vaniyambadi (H) C and M Sub Division Jurisdiction
Widening from Single Lane to Intermediate Lane and Strengthening at km 1/0 - 2/0 of Vikraman Right Bank Road including Construction of Retaining wall at Km.1/2-1/4 (TRY-49)
Widening with Paved Shoulders, Strengthening, Improvements to Riding Quality, Retaining wall, Protective wall and Drain works to the Government roads in Ariyalur and Sendurai-H- C and M Sub division Jurisdiction VPM-001
Widening and Improvements Improvements to riding quality CD works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in SULUR H CM Sub Division JurisdictionPackage No 65
Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 5/3 of Muthalaipatty pudur - Kalnaickanur road including Construction of Retaining wall at Km 3/8, 4/6 (SLM-6)
Widening from Single Lane to Intermediate Lane and Strengthening at Km 7/8 - 11/220 of Vaikuntham - Kolikkalnatham road including Construction of Well Protective Wall and Retaining Wall, Construction of Culvert (SLM-47)
Widening and Strengthening to Government Roads including Reconstruction and Widening of Culverts, Construction of Protective Wall and Retaining Wall and Construction of CC Surface Drain in Sendamangalam (H) (CandM) Sub Division (SLM-35)
Package-36 Widening Strengthening Improvements of Government roads in Athoor (Highways) C and M Sub-Division including CD work , Protective work, Retaining wall and Drain including Upkeeping for a period of 60 Months
Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culvert, Widening of Culvert, Construction of Retaining Wall and Well Protective Wall in Tiruchengode (H) CandM Sub Division (SLM-73)
PACKAGE 22 Widening, Improvements Improvements to Riding Quality, Culvert, Retaining wall and Protective wall works including upkeeping for a period of 60 months in Govt. Roads in respect of Manapparai H, CandM Subdivision.
Construction of CC Pavement with Retaining Wall in Travellers Bangalow Street at Kurangani Village of Kottakudi Panchayat at Bodinayakkanur Block in Theni District under 6th Central Finance Commission 2024-25 ( OMDGF Hilly Villages)
Widening, Strengthening, Junction Improvements and Improvements to Riding Quality to Government Roads including Widening of Minor Bridge, Construction of Retaining Wall and Reconstruction of Culvert in Salem (H) (CandM) Sub Division (SLM-2)
Widening, Strengthening, Improvements, Improvements to Riding Quality, culverts, Retaining wall, Junction Improvements including up keeping for a period of 60 months in Govt. Roads in respect of Kodavasal H C and M Subdivision
Widening, Improvements, Dip raising, Curve Improvements, Improvements to Riding Quality to Government Roads including Construction and Reconstruction of Culvert, Retaining wall, Box culvert, Drain and up keeping the roads in Dharmapuri Pack 55
Package-40 Widening, Improvements of Government roads in Oddanchathiram (Highways) C and M Sub-Division including CD work Constriction of Retaining wall using plastic waste , including Upkeeping for a period of 60 Months
Widening from Intermediate Lane to Two Lane and Strengthening Improvements to Riding quality Construction of culverts and Retaining wall in the Government roads of Anaimalai H C and M Sub Division CBE 046
Widening and Improvements Improvements to Riding Quality Construction Reconstruction of Cross Drainage Works Construction of Retaining Wall and Protective Wall in Government Roads of Bhavani Highways C and M Sub Division TPR 005
Widening and Improvements Improvements to riding quality CD works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in SULUR H CM Sub Division JurisdictionPackage No 67
Widening and improving the road to multi lane branching from Thindal junction KaniravutharKulam via Villarasampatty km 0-0 - 8-4 Sub Works Constn of Retaining wall at Km.0-6 and 5-2
Widening from Intermediate Lane to Two lane and Strengthening at km 7/0 - 8/0 of Sirkali -Thirumuillaivasal - Koolaiyar Road including Reconstruction of Syphon and Box Culvert, Construction of Retaining wall. (TRY-116)
Strengthening Improvements Retaining wall CD Works CC Drain and Protective works on Government roads in Udhaga mandalam H C and M Sub Division and Kotagiri H C and M Sub Division CBE 094
Widening and Improvements Widening of Culvert Reconstruction of Culvert Construction of Retaining Wall Construction of Well Protective wall Works in Government Roads of Kodumudi Highways C and M Sub Division TPR to 046
Package 86Strengthening and Improvements Govt roads in Madurai west H C and M SubDivision including Reconstruction of culvert construction of Retaining wall , CD works, Drain, junction impts , and inclding Upkeeping for 60 months
Widening and Improvements Improvements to riding quality CD works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in SULUR H CM Sub Division JurisdictionPackage No 66