Loading…
Loading…
3,984 results • Best match
PACKAGE 11 Widening, Strengthening, Improvements, Improvements to Riding Quality, Culvert and Retaining wall works including up keeping for a period of 60 months in Govt. Roads in respect of Thuraiyur H, CandM Subdivision
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Construction of Box Culvert in lieu of existing Bed Level Causeway and Retaining Wall in Attur (H) (CandM) Sub Division (SLM-8)
Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 1/0 of Vikraman Right Bank Road including Construction of Retaining wall at KM.0/6-0/10. TRY-73
Construction of Control room Building with Electrification ,Transformer plinth ,Various structure plinths,Cable duct ,Retaining wall ,RCC Road ,Yard filling,HBG Metal filling ,Borewell ,Septic tank and all allied civil works at UliveeranapalLY
Widening, Improvements and Improvements to Riding Quality to Government Roads including Dip Raising, Construction of Storm Water Drain, Retaining Wall and Reconstruction of Box Culvert in Salem (H) CandM Sub Division (SLM-1)
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Construction, Reconstruction of Box Culvert, Construction of Retaining Wall, Drain and Providing Center Median in Namakkal (H) (CandM) Sub Division (SLM-33)
Widening, Strengthening, Urban Improvements, Paver block, paved shoulder, Construction of Retaining wall , drain , Center median, Protective works , CD works , Reconstruction of Culvert, Junction impts and Bus lay bye works in the Govt MDU069
Package45 Widening and Improvements of Government roads in Sivagangai Highways C and M Sub-Division including Reconstruction of Culvert , construction of Retaining wall ,Reconstruction of narrow and damaged pipe Culvert including Upkeeping for
PACKAGE 36 Widening, Improvements, Improvements to Riding Quality, Curve Improvement, Culvert and Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Sirkali H, CandM Subdivision
Widening from Single Lane to Two Lane, Strengthening, Providing Junction Improvements Reconstruction of box culvert and Construction of Retaining wall in Government Roads of Tenkasi H C and M Sub Division TNV-31
Widening and Strengthening, Improvements to Riding Quality and reconstruction of culverts and Construction of Retaining wall works in Govt roads in respect of Pudukkottai East (H) C and M Sub Division (TRY 92)
Package 27 Widening Improvements of Government roads in Vathalagundu Highways C and M Sub-Division including CD work with approach road Constriction of Retaining wall including Upkeeping for a period of 60 Months
PACKAGE 56 Strengthening, Improvements to Riding Quality Construction of Retaining wall, Reconstruction of culvert, including up keeping for a period of 60 months in Govt. Roads in respect of Kudavasal H, CandM Subdivision
Widening from Two Lane to Four Lane and Improvements at km 11by8 and 16and8 of Palladam to Dharapuram road SH 174A including CD Works, Drain, Construction of Retaining Wall and Providing Center Median
Package 19 Widening Improvements to Riding quality Junction Improvements Reconstruction of Minor Bridge construction of Retaining wall Protective works Provding CC Pavements including side drain and CD Works to Government Roads in Sanka
Widening from Intermediate Lane to Two Lane and Strengthening at Km 4/4 - 7/0 of Pennagaram - Mudugampatti -Malaiyanur road (MD859) including Construction of Box Culvert and Construction of Retaining Wall (SLM-45)
Package 46 Widening and Improvements of Government roads in Sivagangai (Highways) C andM Sub-Division including Reconstruction of Culvert , construction of Retaining wall ,Reconstruction of narrow and damaged pipe Culvert including Upkeeping for
Strengthening and Improvements to Government Roads including providing CC pavements and Construction of Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) C and M Sub Division (Package-40)
Widening and Improvements, Improvements to Riding Quality including Reconstruction of Culvert and Construction of Retaining wall, Junction improvement works in Govt. Roads in respect of Papanasam H, C AND M Subdivision TRY 22
Widening from Intermediate Lane to Two Lane and Strengthening at km 4/6 - 10/0 of Kolathur Guruvareddiyur road including Construction of Retaining Wall at Km 4/8 and 4/10 (SLM-18)
PACKAGE - 48 widening, Strengthening, Improvements, Improvements to Riding Quality, culverts,Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Aranthangi (H), C and M Subdivision
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Construction of Retaining Wall, Construction of Box Culvert in lieu of Damaged Pipe Culvert in Palacode (H) (CandM) Sub Division (SLM-103)
Widening and strengthening Improvements to riding quality CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in ANAIMALAI H CM Sub Division Jurisdiction Package No40
PACKAGE 17 Widening, Improvements, Improvements to Riding Quality, Retaining wall, Drain and CD Works including up keeping for a period of 60 months in Govt. Roads in respect of Trichy H, CandM Subdivision
Widening and Improvements Improvements Construction of Retaining Wall Works and including Up Keeping for a period of 60 months on Government Roads in Udumalpet Highways C and M Sub Division Pkg No 31
PACKAGE 74 Improvements, Improvements to Riding Quality, Reconstruction of culvert, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Aranthangi H, CandM Subdivision.
Widening from Intermediate Lane to Two Lane and Strengthening at km 4/0 - 8/0 of Tharangambadi - Manganallur - Aduthurai Road including construction of retaining wall at km 7/8-8/0 (TRY-40)
Widening from Single Lane to Intermediate Lane and Strengthening Improvements to Riding Quality Construction of Culvert and Retaining wall in the Government roads of Sulur H C and M Sub Division CBE 058
Constrction of Drain at Water Tank Road, Salaiyam Street, Meeranpalayam Street, Bunglow Street, High School Street (R.M.G. Nagar), Muthu Nagar, Kamaraj nagar 2nd Cross street and Constrction of Retaining wall at Meeranpalayam Street.
Widening and Strengthening, Improvements to Riding Quality, Reconstruction of minor bridge, Reconstruction of Culvert, Construction of Drain and Construction of Retaining Wall on Government road in Tiruvannamalai (H), CandM, Sub Division-TVM-33
Widening and Strengthening, Paver work, Improvements including Reconstruction of Culvert, Widening of culvert, and Construction of Retaining wall, Drain, Protective wall, in Govt. Roads in respect of Trichy and Manapparai H CandM Subdivision
Widening and Improvements Improvements to riding quality CD works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in ANUUR H CM Sub Division JurisdictionPackage No 57
Package No. 45 Strengthening, Widening and Improvement works including upkeeping for a period of 60 months and Construction of Retaining wall and CD works in Uthiramerur (H) C and M Sub Division Jurisdiction
Widening from Intermediate Lane to Two lane and Strengthening at Km 19/5-21/6 of Vridhachalam - Palakollai Road Including Construction of Retaining wall at Km.19/8 and 19/10-TVM-68
Improvements of Bathing Ghat, Baby Pond, and Construction of Retaining wall (10m) at Samandipuram Ooruni in AngoorPalayam panchayat under AGAMT II scheme in cumbum block of Theni District for the year 2021-22
Widening from SL to IL and Strengthening Construction of Retaining Wall and including CC Drain CD Works and Protective Works on Government roads in Udhagamandalam H C and M Sub Division CBE 004
Package 38 Widening Improvements to Riding Quality Junction Improvements Construction of Retaining Wall Paver block to Government Roads in Palayamkottai H C andM Sub Division including upkeeping for a period of 60 months
Widening from Intermediate Lane to Two Lane and Improvements Improvements Construction of Box Culvert and Retaining wall Dip Raising Works in Government Roads of Vellakovil Highways C and M Sub Division TPR 055
PACKAGE 94 Widening and improvements, Improvements to Riding Quality, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thiruvaiyaru H, CandM Subdivision
Package 39 Improvements to Riding Quality Junction Improvements Construction of Retaining Wall Reconstruction of Box Culvert CC Pavement including CD works to Government Roads in Palayamkottai H Cand M Sub Division including upkeeping
South West Monsoon 2019 -Flood damage rectification works- Construction of Retaining wall from chainage between Ch.5495m Ch.5655m along the cutting sides of the road leading to Porthimund from Power House 6
Widening from Intermediate Lane to Two Lane and Improvements at Km 2/4-9/4 of Chittalandur - Jedarpalayam Road including Construction of Retaining Wall at Km 2/10 and 7/8 (SLM-69)
Southwest Monsoon-2019 - Providing Gabion wall in between Ch.6330m to Ch.6505m on cutting side of the road leads to PH-6 from Emerald in Nilgiris District.
Southwest Monsoon-2019 - Providing Gabion wall in between Ch.6210m to Ch.6320m on cutting side of the road leads to PH-6 from Emerald in Nilgiris District.
Widening from Single Lane to Intermediate Lane, Strengthening, Improvements to Riding quality, Providing Junction Improvement, Reconstruction of Culvert and Retaining wall in Government Roads in Sivagiri H C and M Sub division TNV-35
Widening from Single Lane to Intermediate Lane and Strengthening Reconstruction of Box Culvert Construction of Retaining wall and Construction of Drains in the Government Roads of Sathyamangalam H C M Sub Division CBE 005
Widening from SL to IL and improvements at Km 5.4to9.8 of Salaigramam Sarugani road including Reconstruction of culverts and construction of Retaining wall works in the Government roads of Sivagangai Highways CandM SubDivision MDU077
Widening and Improvements, Construction of cross drainage, Construction of Retaining wall, Construction of Drain and Improvements to riding quality in the Government Roads of Coimbatore North H, C and M Sub Division - CBE - 049
South West Monsoon 2019 -Flood damage rectification works Construction of Retaining wall along the cutting side nearer to the Hairpin Bend. (No.6/18) on the road leading to Porthimund from Power House 6
Widening, Improvements and Improvements to Riding Quality to Government Roads including Widening of Pipe Culvert, Construction of Retaining Wall, Well Protective Wall, Box Culvert and Drain in Rasipuram (H) CandM Sub Division (SLM-13)