Loading…
Loading…
3,984 results • Best match
Widening from Single Lane to Intermediate Lane and Strengthening at Km 0/0-3/8 of Vaiyappamalai - Ramapuram Road including Construction of Retaining Wall at Km 1/10, 3/2, 3/4 (SLM-39)
PACKAGE 65 Strengthening, Improvements Widening, Improvements to Riding Quality, Retaining wall culverts work including up keeping for a period of 60 months in Govt. Roads in respect of Kodavasal H C and M Subdivision.
Package 43 Widening Improvements to Riding Quality Construction of Retaining Wall Reconstruction of Culvert Paver block including CD works to Government Roads in Ambasamudram H C andM Sub Division including upkeeping for a period
Package 36 Widening Improvements to Riding Quality Junction Improvements Construction of Retaining Wall, Paver block Including CD Works to Government Roads in Palayamkottai H CandM SubDivision including upkeeping for a period of 60 mon
Widening from Two Lane to Four Lane and Strengthening at km 0 by 0 to 6 by 0 of Palladam Dharapuram road including CD Works Drain Construction of Retaining Wall and Providing Center Median
Package-33 Widening, Strengthening , Improvements of Government roads in Natham (Highways) C and M Sub-Division including CD work , Constriction of Retaining wall , using plastic waste ,including Upkeeping for a period of 60 Months
South west monsoon 2019 - Providing Pipe culvert and construction of retaining wall in between CH-5525 to CH-6000m along the cutting side of the road from Emerald to PH-6 in Nilgiris District
Southwest Monsoon 2019 - Flood damage rectification Works - Providing Gabion wall at earth slipped location in between CH-6755 to 6810 on the road leads to PH - 6 from Emerald
KUGC works - Reconstruction of flood damaged protection wall on the downstream right flank of Pegumbahallah dam (Kundah PH- 2) for a length of 24m (CH-5 to 29m)
KPSHEP / Emerald KUGC works - Construction of Concrete protection wall at the damaged location from CH 6650 to 6670 on the right side of the NDS flume at Glenmorgan.
Construction of RCC flood protection wall along the North end boundary from EL 2020.90m to EL 2022.50m of the Proposed 230 KV switchyard at Kattukuppai in Nilgiris District
Widening from IL To DL and Strengthening, Construction Of Box Culvert Construction Of Drain Reconstruction Of Culvert Construction Of Retaining Wall and Providing Speed Breaker Works In Government Roads Dharapuram H CandM Subdivision TPR 054
Package 15 Widening Impronts,Imprements to Riding quality Reconstruction Pipe culverts Construction of Retaining wall Construction of Drain and Providing Paver Block to Government Roads in Sankarankovil H C and M Sub Division including upkee
Widening from Intermediate Lane to Two Lane and Strengthening Widening of Slab Culvert Construction of Box Culvert Construction of Retaining wall Works in Government Roads in Karur H C and M Sub Division TPR 009
PACKAGE 55 Widening Improvements, , Improvements to Riding Quality, culvert, Retaining wall and Drain works including up keeping for a period of 60 months in Govt. Roads in respect of Pudukottai (H), C and M Subdivision.
Widening including Widening of Culvert Reconstruction of Box culvert, Minor Bridge and culvert Construction of widening Box culvert widening of Slab Culvert Retaining wall and Protective wall Works in the Government roads of Athoor MDU019
Widening from Two Lane to Four Lane and Strengthening at km 6 by 0 to 11 by 8 of Palladam to Dharapuram road including CD Works Drain Construction of Retaining Wall and Providing Center Median
Widening from Single Lane to Intermediate Lane and Strengthening, Improvements to Riding Quality , Providing CC Pavement and Retaining wall including CD Works in Government Roads of Palayamkottai (H) C and M Sub-Division (TNV-55)
Widening from Intermediate Lane to Two lane and Strengthening Construction of retaining wall Reconstruction of Box Culvert and Construction of Minor bridge in the Government Roads of Nambiyur H C M Sub Division CBE 004
Widening from Single Lane to Intermediate Lane StrengtheningImprovements to idingQuality,Construction of Retaining wall,Construction of Drain including CD Works in Government road of Thuckalay and Thovalai H C and M Sub Division TNV 74
Widening from Intermediate Lane to Two Lane and Strengthening at Km 0/0 - 5/0, 7/0 - 11/0 Karimangalam - Agaram Road including Reconstruction and Widening of Culverts and Construction of Retaining Wall (SLM-61)
EORR Sub work Construction of Box Culvert RCC Retaining wall and forming approaches to the Free left bridge from Chennimalai road to Erode Outer Ring Road at Km 10 8 of Erode Outer Ring Road
PACKAGE 38 Widening, Improvements, Improvements to Riding Quality, Reconstruction of Slab Culvert, Construction of Retaining wall, up keeping for a period of 60 months in Govt. Roads in respect of Peravurani, Pattukottai H, CandM Subdivision
Widening from Intermediate Lane to Two Lane and Strengthening at km 0-420 - 2-0 of Kinathukadavu - Kattampatti Road including Construction of Retaining wall at km 0-6 and 1-8 M 165 CBE - 043
Widening from Intermediate Lane to Two Lane and Strengthening at km 34/0 - 35/0 of Tharangambadi - Manganallur - Aduthurai Road including Construction of retaining wall at km 34/2, 34/6, 34/10. TRY 57
Widening and Strengthening Improvements to Riding Quality Construction and Reconstruction of culverts and Construction of Retaining wall Construction of storm water drain in Government Roads in Erode H C and M Sub division TPR 002
Widening, Strengthening and Urban Improvements to Government Roads including Construction of Box Culvert, Retaining Wall, Drain, Well Protective Wall, Storm Water Drain and Reconstruction of Box Culvert in Mettur (H) (CandM) Sub Division (SLM-22)
Wdg Constn of CD Works Providing Centre Median Constn of Retaining Wall and Incl Up Keeping for a period of 60 months on Govt Roads in Karur H C M Sub Dn Pkg No 69
Package 73WStrengthening I mprovements Government roads in Usilampatti H C and M Sub Division including Reconstruction of culvert construction of Retaining wall and using plastic waste and including Upkeeping for a period of 60 Months
Improvements to Riding Quality to Government Roads including Construction of CD Works and Retaining Wall and up keeping the roads for a period of 60 months in Attur C and M Sub Division (Package-11)
Supply (supply-I), fabrication and erection of structures and substation auxillaries, earthing system, painting of structures on 110 KV side and providing retaining wall on west side for the proposed Kallapalayam 110 / 11 KV substation
Improvements Rebuilding Construction of CD Works Construction of Retaining Wall works and including Up Keeping for a period of 60 months on Government Roads in Kulithalai Highways C and M Sub Division Package No 81
PACKAGE 24 Widening,Improvements,Improvements to Riding Quality Construction of Box Culvert, Reconstruction of Box Culvert,Construction of Minor Bridge, Construction of Retaining wall up keeping for a period of 60 months in papanasam subdivision
South West Monsoon 2019 -Flood damage rectification works-Construction of Retaining wall along the cutting side from Ch.2427m Ch.2547m nearer to the Hairpin Bend (No.4/4) on the road leading to Porthimund
Widening of Single Lane to Intermediate Lane Strengthening Construction of Minor Bridge Construction of Retaining wall and Construction Reconstruction of Box culvert in Government Roads of Tenkasi H C and M Sub-Division TNV 31
Raising Retaining Wall for Bund side and Road Side , Providing ACP Sheet work for Entrance and Exit Area , SS Gate and Lighting work , Additional Water Arrangements for Food Court, D-3,U-1,Z-1
Strengthening, Improvements to Riding Quality, Reconstruction of Culvert, Bus lay bye and Construction of Minor Bridge, Pipe Culvert, Culvert, Box Culvert, Retaining wall and Providing Road Safety works in the Government roads of Peraiyur Highways
PACKAGE 83 Widening Improvements, Strengthning, Improvements to Riding Quality, Reconstruction of culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Keeranur H, CandM Subdivision
PACKAGE 25 Widening, Strengthening, Improvements, Improvements to Riding Quality, Reconstruction of Culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Kumbakonam H, CandM Subdivision
Widening and Improvements Improvements to riding quality Retaining wall CD works Junction Improvements and Up Keeping for a period of 60 months to Government Highways roads in SULUR H CM Sub Division JurisdictionPackage No 64
PACKAGE 85 Widening, Improvements and Improvements to Riding Quality, Reconstruction of culverts, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Pudukkottai H, CandM Subdivision.
Widening from Intermediate Lane to Two Lane and Strengthening at km 0by2 3by0 of Arasu colony Panjamadevi Nerur Road including construction of RCC Retaining wall at km 0by6 RHS km0by10 RHS and km 2by6 RHS
PACKAGE 78 Widening and improvements, Junction Improvements, Drain, Bus Lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur H, CandM Subdivision
Widening from Single Lane to Two Lane and Strengthening at km 8/0 - 10/0 of Gandhipuram - Karavalli (via) Ramanathapurampudur road including Reconstruction of culvert, Widening of culvert and Construction of retaining wall (SLM-12)
Widening from SL to IL Strengthening and mprovements mprovements to Riding Quality including reconstruction of Minor Bridge and construction of retaining wall in Government Roads of Rajapalayam H C and M Sub Division TNV 02
Package 16 Widening Improents Imprments to Riding quality Construction of Retaining wall and Protective Works Providing Paver Block including CD Works to Government Roads in Sankarankovil H CandM Sub Division including upkeeping for a peri
Widening, Strengthening, Improvements and Improvements to Riding Quality to Government Roads including CC Pavements, Reconstruction of Box culvert and Construction of Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) Pack43
PACKAGE 88 Widening and improvements, Improvements to Riding Quality, Minor Bridge, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Orathanadu H, CandM Subdivision
Widening, Improvements, Improvements to Riding Quality to Government Roads including Curve Widening, Construction of Retaining Wall, Box Culvert, CD Works and Protective Works and Widening of Culvert in Denkanikottai (H) CandM Sub Division (SLM-27)