Loading…
Loading…
3,984 results • Best match
Widening from Two Lane to Four Lane and Strengthening at km 34/0- 37/6 of Dharmapuri - Arur (Via) Morappur road including Reconstruction of Culvert, Reconstruction of Minor Bridge, construction of Retaining Wall (SLM-100)
Widening from Intermediate Lane to Two lane and Strengthening at km 4/0 - 5/4 of Kuthalam - Komal Road including Construction of retaining wall at km 4/0 -4/6 providing soil stabilizations (TRY-114)
Package-47 Widening and Improvements of Govt roads in Sivagangai H C and M Sub-Division inclg Reconst of Culvert , construction of Retaining wall and protective wall including Upkeeping for a period of 60 Months
Widening from Single lane to Intermediate lane and Improvements Reconstruction of minor Bridge Reconstruction of box Culvert Construction of Retaining wall works in Government Roads in Kulithalai H C and M Sub Division TPR 015
PACKAGE 70 Widening, Strengthening, Improvements to Riding Quality, including Construction of Drain Reconstruction of Box culvert, Construction of Retaining wall, upkeeping for a period of 60 months in Govt. Roads in Tiruvarur h CandM subdivion
Widening from Single Lane to Intermediate Lane and Strengthening at Km 0/0-3/6 of Kangeyampalayam Road Including Construction of Culvert, Reconstruction of Culverts, Widening of Culvert and Construction of Retaining Wall (SLM-55)
Widening from Intermediate Lane to Two Lane and Strengthening at km 8/8 - 9/6 of Kodavasal - Valangaiman - Papanasam road including Reconstruction of Culvert at Km.9/2 and Construction of Retaining wall. TRY-122
Strengthening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain and Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) C and M Sub Division (Package-42)
PACKAGE 59 Strengthening, Improvements, Improvements to Riding Quality, Reconstruction of Box culvert, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Mannargudi H, CandM Subdivision.
PACKAGE 79 Widening and improvements, Junction Improvements, Drain, Bus Lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur H, CandM Subdivision
Improvements to Riding Quality Reconstruction of Box culvert Construction of culvert Retaining wall Drain and Protective works with approach road works in the Government roads of Vathalagundu Highways C and M Sub Division MDU 005
Ariyalur-H-C and M Sub Division Strengthening at km 0.0-2.2 of Rayampuram -Pottaveli road including Reconstruction of Box culvert at km 0.4 and Construction of Retaining wall at km 0.6, 0.10 VPM-025
Widening from Intermediate Lane to Two Lane and Strengthening at km 35/0 - 36/0 of Tharangambadi - Manganallur - Aduthurai Road including construction of retaining wall at Km.35/2, 35/4, 35/10. TRY 66
Widening with Paved Shoulders and Strengthening,Widening and Strengthening, Reconstruction of culverts, construction of Drain, Providing Bus lay bye and construction of retaining wall on Government roads in Vellore (H), CandM, Sub Division - TVM-2
Widening, Improvements to Government Roads including Junction Improvements, Construction of CD works, Drain and Retaining wall and Up keeping for a period of 60 months in Edappady (H) C and M Sub Division (Package-22)
Package No. 99 Widening, Strengthening and Improvement works including upkeeping for a period of 60 months, Construction of RCC Centre Median, Retaining wall and CD works in Chengam (H) C and M Sub Division Jurisdiction
Improvements to Government Roads Including Construction of Retaining Wall, Reconstruction of RCC slab Culvert and up keeping the roads for a period of 60 months in Pennagaram (H) C and M Sub Division (Package 65)
Wdg Constn of CD Works Providing Centre Median Constn of Retaining Wall and Incl Up Keeping for a period of 60 months on Govt Roads in Karur H C M Sub Dn Pkg No 68
Maintanance and Improvements for Road Side Retaining wall and Levelling with well gravel at Ward No 11 Naidu south cross street 6,18,19 and Ward No 12 Naidu south cross street 12 in Chettiyarpatti Town panchayat.
PACKAGE 81 Widening and improvements, Improvements to Riding Quality, Junction Improvements, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thiruvaiyaru H, CandM Subdivision
Widening from SL to IL StrengtheningImprovements to Riding Quality, Including reconstruction and Construction of culverts and construction of retaining wall and Protective works in Government Roads of Aruppukottai H C and M Sub Division TNV05
Widening from Single lane to Intermediate lane and strengthening at km 0/0-2/0 of Bhudavarayanpettai - Krishnapuram Road including reconstruction of culverts at km 0/4,0/10 and construction of retaining wall VPM-124
Package 41 Widening Improvements to Riding Quality Junction Improvements Widening Curves Construction of Retaining Wall Paver block, Bus lay bay including CD works to Government Roads in Ambasamudram H C and M Sub Division including
Construction of Drain at km 12/8, 12/10, 13/2 of Sholinghur - Kaveripakkam Road including Reconstruction of Culvert at Km 13/2 and Re-Construction of Retaining Wall at Km 7/2 - TVM-84
Improvements to riding quality, Retaining wall CC Drain CD works and Up Keeping for a period of 60 months to Government Highways roads in Kotagiri H, C and M Sub Division Jurisdiction Package No. 24
KPSHEP - South West Monsoon - 2019 - Flood damage rectification works-Construction of RCC Retaining wall on the downstream of the existing bridge from 27m to 75m to protect the approach road to switch yard near Kattukuppai.
South West Monsoon - 2019 - Flood damage rectification works - Construction of Retaining wall along the cutting side in between Hairpin bend 5/18 and 6/18 on the road leading to Porthimund from Power House-6
Southwest Monsoon-2019 - Providing Gabion wall in between Ch.5360m to Ch.5430m on Valley side of the existing road leading from Emerald to PH-6 camp in Nilgiris District
South west Monsoon 2019 Providing Gabion wall in between CH-4265 to CH-4400 on the cutting side of the road leading from Emerald to PH-6 in Nilgiris District
Widening with paved shoulders and Strengthening including Reconstruction of Culverts Construction of Drain Widening of culvert Construction of Retaining Wall and Reconstruction of Minor Bridge on Government roads in Katpadi H CM Sub Division - TVM-9
Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Box Culverts, Retaining Wall, and Providing Revetment, Well Protective Wall, Drain and Up keeping for a period of 60 months in Edappady
PACKAGE 22 Widening, Imprts, Improvements to Riding Quality, Junction Improvements, Reconstruction of culvert, Construction of Retaining wall,up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur and Thiruvaiyaru sub division.
Package 23 Improvements and Strengthening of Government roads in Vadipatti H C and M Sub Division including Construction of Retaining Wall, Reconstruction of Culvert, Construction of Paver Block Construction of Drain, including Using Plastic Waste fo
Improvements Improvements to riding Quality including Raising the concrete shoulder, Re construction of Box Culvert Construction of Retaining wall Drain and Providing Paver Block Bus lay bye works in the Government roads of Uthamapalayam Highways C
Package13 Strengthening Improvements to Riding quality Reconstruction of Box Culvert Construction of Retaining wall Reconstruction of Slab Culvert and Reconstruction of CD Works to State Highways and Other District Roads in Ottapidaram h C M Sub
Widening Improvements and Improvements to Riding Quality Reconstruction of Culvert Box Culvert Construction of Retaining wall Drainage and Storm water drain works in the Government roads of Bodinaickanur Highways C and M Sub Division MDU 002
Package No. 107 Widening and Improvement works including upkeeping for a period of 60 months, Widening of Curve, Construction of Retaining wall, Centre Median and CD works in Arni (H) C and M Sub Division Jurisdiction
Widening from Intermediate Lane to Two Lane, Strengthening , Improvements to Riding quality , Widening of Pipe Culvert and RCC Minor Bridge Reconstruction of Box Culvert Construction of Retaining wall in Government Roads of Tenkasi and Shencottai H
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Construction of Retaining Wall, Box Culvert and Drain, Widening of Slab Culvert and Reconstruction of Box Culvert in Dharmapuri (H) (CandM) Sub Division (SLM-88)
South West Monsoon 2019 - Flood damage rectification works- Construction of PCC retaining wall on the valley side in between CH 8985 to CH 9085 on the road leads to PH-6 from emerald in Nilgiris Dt
Widening from IL to TL and Streing, Strengthening Impts to Riding Quality Constn of Retaining wall Widening of Culvert and Drain works in the Government roads of Annur H C and M Sub Division CBE 052
Widening and Improvements to Government Roads including Reconstruction of Box Culvert in lieu of Existing Pipe Culvert, Widening of Pipe Culvert, Providing Well Protective Wall and Retaining Wall, in Namakkal (H) CandM Sub Division (SLM-85)
Widening from IL to DL Strengthening Construction of Minor Bridge Widening of Pipe culvert Reconstruction of Box Culvert and Construction of Retaining Wall in Govt Roads of Tenkasi H C and M Sub Division TNV 24
PACKAGE 52 Widening and Strengthening, Improvements to Riding Quality, Reconstruction of Box culvert Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Mayiladuthurai H CandM Subdivision.
Widening and Improvements Improvements to riding quality Junction Improvements Drain Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in COIMBATORE H NORTH CM Sub Division Jurisdiction Package No 48
Widening and Improvements Improvements to riding quality, Junction Improvement CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in Thalavady H CM Sub Division Jurisdiction Package No 10
Urban Improvements - Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening, and Improvements to Riding Quality and Construction Retaining wall including CD Works of Ambasamudram (H) C and M Sub-Division TNV-54
PACKAGE 4 Widening, Improvements, Improvements to Riding Quality, Curve and Junction improvements, Retaining wall and CD works including up keeping for a period of 60 months in Govt. Roads in respect of Lalgudy H CandM Subdivision
Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0 - 3/0 of Sowripalayam - Vembaneri - Pudupalayaam road including Reconstruction of culvert, Construction of Retaining wall and Construction of Well Protective Wall (SLM-5)
Widening from Intermediate Lane to Two Lane and Strengthening at km 14/0-15/4 of Puthur road including construction of Retaining wall at Km 14/6,14/8,14/10 and 15/4 MD-383 -VPM-035