Loading…
Loading…
3,985 results • Best match
Widening from Two lane to Four lane and Strengthening at Km 2/2-3/6 of Ranipet - Sholinghur Road including Construction of Centre median and Construction of Retaining Wall at Km 3/2-3/4 TVM-9
Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Construction of Retaining wall and Up keeping for a period of 60 months in Edappady (H) C and M Sub Division (Package-25)
PACKAGE 3 Improvements, Curve improvements, and, widening of box culvert, Reconstruction of box culvert, culvert Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Trichy sub division
Widening from 2L to 4L and Stren. at km 15/6 - 21/6 of Aruppukottai - Perunali - Sayalkudi - Kadugusandai - Mariyur - Valinokkam Road including Reconst.of CD works, Const. of Retaining wall, Centre Median, Buslaybay and Junction Improvements TNV 85
Package 3 Improvements Improvements to Riding quality Reconstruction of Pipe Culvert Recon of Box culvert Construction of Retaining Wall and Prong Paver Block to Other Dist Road in Virudhunagar H C and M Sub Division including up
Package65 Impts of Government roads in Ramanatha H C and M Sub-Division including widening of Pipe culvert Work, Reconstruction of Culvert, Construction of Retaining wall work and junction Impts including Upkeeping for a period of 60
Construction of RCC retaining wall in the earth slipped portion (rear to the DG set room) of the Periyar forebay dam left flank road (Chainage 596 to 610meter) leading from Kumily main road at Periyar Upper Camp.
KUGC Works PH-6 Penstock area from Anchor No.2 to 3 Repairing the damaged side drain, providing concrete protection wall along the cutting side including finishing work underneath the penstock
Southwest Monsoon 2019 - Flood damage rectification Works - Construction of Earth Protection wall along the road in between CH 1000m - CH3770m wherever necessary on the road leads to PH-6 from Emerald
construction of a brick masonry protection wall on northern side to eastern side from chainage 76 to 112 m of SE/PEDC/ Perambalur office and 230 KV Auto SS at Perambalur
construction of a brick masonry protection wall on northern side to eastern side from chainage 61 to 76 m of SE/PEDC/ Perambalur office and 230 KV Auto SS at Perambalur
Widening from Two Lane to two lane with paved shoulders and strengthening at km 38/0-47/8 of Kumbakonam - Mannargudi -Adhirampattinam road including Reconstruction of Box Culvert and Widening of Culvert and Construction of Retaining Wall. TRY122
Widening of SL to IL Widening from IL to DL Strengthening Improvements to Riding Quality Construction of Drain and Retaining wall Reconstruction of Box culvert and Providing Paverblock in Govt Roads of Sankarankovil H Sub Division TNV 29
Strengthening of BT Road at Ward No.3 JJ Nagar Kalakadu Road, Kullandikadu Road and Strengthening of BT Road with construction of storm water drain and retaining wall at Ward No.07, Bollkadu Road in Nallampatti Town Panchayat.
Widening from end to end and Improvements at Km 1/8 4/5 of Medavakkam Sholinganallur Kudimiyandithoppu Road including construction of Culverts, drain Cum footpath and retaining wall including Land Acquisition at Sholinganallur Junction Km 4/5 SH49B
Improvements CD Works Interlocking paver block pavment for watter logging area CC Drain Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in Udhagai H CM Sub Division Jurisdiction Package No 16
Widening with paved shoulders, Strengthening, impts, urban impts, constructions of drain, retaining wall providing paver block and center median and reconstruction of widening of culvert works in the Govt roads of Madurai H C and M SubDivision MDU086
Widening from TL with Paved Shoulders to FL and Strengthening at Km 49/6-51/8 of Athur - Perambalur Road including Reconstruction of Box culverts, Construction of Drain, Retaining wall,Junction Improvementsand Construction of Centre memedian (SH-157)
PACKAGE 93 Widening and improvements, Improvements to Riding Quality, Junction Improvements, Bus lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur H, CandM Subdivisio
Widening from Two Lane to Two lane with Paved Shoulders and Strengthening Curve widening Construction of Retaining wall and Reconstruction of Box Culvert in the Government roads of Coimbatore North H C and M Sub Division CBE 029
Impts Impts to Riding Quality Rebuilding Constn of CD Works Constn of Retaining Wall works and Incl Up Keeping for a period of 60 months on Govt Roads in Kulithalai H C M Sub Dn Pkg No 78
PACKAGE 89 Widening and improvements, Improvements to Riding Quality, Junction Improvements, Bus lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Orathanadu H, CandM Subdivisi
Improvements CC Drain Interlocking paver block pavment for watter logging area Retaining wall CD works and Up Keeping for a period of 60 months to Government Highways roads in Udhagai H CM Sub Division Jurisdiction Package No 15
Widening from Two Lane to Four Lane and Strengthening at km 30/0 - 33/0 of Ariyalur - Jayankondam road (via) Sendurai including Reconstruction of Box Culvert, Construction of Retaining wall, Centre Median and Providing Buslay Bye-VPM-095
Widening from Two Lane to Four Lane and Strengthening at km 13/0 - 15/0 of Vellemedupettai - Pondy road-via- Mailam including Widening and Reconstruction of CD works, RCC Drain, Retaining Wall and Providing Paver Block-VPM-107
Widening From Single Lane to Intermediate Lane and Strengthening at Km 0/0-1/2 of vadivelkarai Road including construction of Pipe Culvert at km 0/6 and construction of Retaining wall at km 0/2-0/6
Widening from Two lane to Four lane and Strengthening at Km.21 6 24 2 of Aruppukottai Perunali Sayalkudi Kadugusandai Mariyur Valinokkam road including Reconstruction of CD works Construction of Retaining wall, Centre Median, Bus lay bay Junc
Widening, Improvements, Improvements to Riding Quality to Government Roads including construction of Retaining Wall , Widening of Culvert and up keeping the roads for a period of 60 months in Palacode (H) C and M Sub Division (Package 56)
PACKAGE 90 Widening and improvements, Improvements to Riding Quality, Bus lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Pattukottai and Peravurani H, CandM Subdivision
Package66 Impts of Government roads in Kamuthi H C and M Sub-Division including widening of Pipe culvert Work Reconstruction of Culvert, Construction of Retaining wall work and junction Impts including Upkeeping for a period of 60 M
Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining Wall and Protective Walls and up keeping the roads for a period of 60 months in Yercaud C and M Sub Division (Package-19)
Widening from Two Lane with Paved Shoulder to Four Lane and Strengthening at Km 60/8-66/0 of Omalur - Sankari - Thiruchengode - Paramathy Road including CD Works, Construction of Retaining Wall, Construction of Drain and Providing Centre Median
Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at Km 23/0 - 24/8 of Mohanur - Namakkal - Sendamangalam - Rasipuram road including Construction of Retaining Wall, Construction of Drain and Reconstruction of Culvert (SLM-29)
Widening from Two Lane to Four Lane and Strengthening at Km 22/4-29/8 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur Road (SH-60) including Reconstruction of Box Culverts, Construction of Box Culvert, Retaining Wall, Drain, Bus Lay Bye
Kurinjipady-H- C and M Subdivision - Widening from Intermediate lane to Two lane and strengthening at Km 11/0 - 12/0 of Bhuvanagiri - Kurinjipady Road including construction of retaining wall at km 11/0-11/8 VPM-031
PACKAGE-57, Widening and Strengthening, Improvements to Riding Quality, Reconstruction of Box culvert Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Kudavasal H, C and M Subdivision
Widening from Two Lane to Four Lane and Strengthening at Km 6/4-12/4 of Ariyalur-Muthuvanchery-Sirupuranthan-Karaikurichi Road including reconstruction of culverts, construction of drain, retaining wall, centre median and bus lay-bye-VPM-127
Widening and Improvements Improvements to riding quality construction of minor bridge CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in Nambiyur H CM Sub Division Jurisdiction Package No 6
Widening from Two lane with Paved Shoulders to Four Lane at Km 0/8 2/5 of Madurai Palamedu road including Construction of CD Works, Drain, Retaining wall Centre median, Bus lay bye, Junction Improvements and Paver Blocks.
Improvements and Improvements to Riding Quality to Government Roads including Construction of Box Culvert, Retaining wall, Drain and Providing Centere Medain and Upkeeping for a period of 60 months in Tiruchengodu (H) C and M Sub Division Package52
Widening and Improvements to Government Roads including Construction of CD Works, Drain, Retaining Wall, Reconstruction of Pipe Culvert and up keeping the roads for a period of 60 months in Attur C and M Sub Division (Package-8)
Package 40 Improvements to Riding Quality Widening the Curves Construction of Retaining Wall Paver block Bus lay bay including CD works to Government Roads in Ambasamudram H C and M Sub Division including upkeeping for a period of
Ariyalur-H-C and M Sub Division Strengthening at km 0.0-3.2 of Elanthaikudam - Thangasalai including Construction of Retaining wall at km 0.4, 0.8, 1.2, 2.6 and Repairs to culvert body wall at km 0.8 ,2.10 VPM-021
Temporary restoration to flood damages at Km 4/6-4/8 and 6/0- 6/5 including Repairs to damaged retaining wall at km 1/2 and Eroded causeway at Km 0/2 of Korattur - Thinnanur - Periyapalayam road
Widening from intermediate Lane to Two lane and Strengthening at Km 6/0-10/280 of Uthiragosamangai Thiruppullani road including CD works Retaining wall and Junction impt works in the Govt roads of Ramanathapuram H CandM SubDivision MDU098
Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening ,Improvements to Riding Quality, including Retaining wall,Drain Reconstruction of culvert and providing paver block in Government Roads of Ambasamudram H C and M Sub Div
Dharmapuri (H) (CandM) Sub Division - Construction of Retaining Wall at Km 16/2, 16/4, 16/6 of Bommidi RS to Thoppaiyar Road (M-860) including Widening of Culvert at Km 16/2 and 16/4 (SLM-138)
Introducing 1No LS Tower, providing plinths, structures, and RCC Retaining wall around the structures for Cable termination arrangements by making LILO of the existing 230KV Korattur Kilpauk water works feeder-I Near Canal Bank road for ganesh nagar
Widening from Two Lane to Four Lane and Strengthening at km 33/0 - 37/0 of Ariyalur - Jayankondam road (via) Sendurai including Reconstruction of Box Culvert, Construction of Retaining wall, Centre Median and Providing Buslay Bye-VPM-096
Construction of control room building with electrification, Digging of bore well and septic tank, cable duct, culvert, plinth for Transformer Retaining wall with fencing, RCC road, filling gravel metal spreading for establishment of 110/22 KV SS w