Widening from Intermediate Lane to Two Lane and Strengthening at km 18/0- 26/0, 27/4-33/0 and 36/0-36/6 of Tharangambadi Manganallur-Aduthurai Road including Reconstruction of Culverts and Construction of Retaining wall TNJ-104
Establishment of 400 230 KV SS at Parali Forming Concrete approach road and construction of retaining wall on both sides from the existing culvert nearby Penstock crossing bridge and upto the proposed location of main gate for the newly constructed
Widening from IL to DL with Paved Shoulders and Impts at Km 12/0-24/330 of Vairamadai Thoppampatty Kuppam Road including widening of Slab Culvert Reconstruction of slab and Box culvert Construction of Retaining Wall Well Protective wall and Drain
Widening and Improvements Improvements to riding quality Reconstruction of minor bridge CD Works Drain Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in Gobi H C and M Sub Division Jurisdiction Package No 2
Widening, Improvements, Improvements to Riding Quality to Government Roads Widening of Pipe Culvert and Slab Culvert, Construction of Retaining Wall and up keeping the roads for a period of 60 months in Harur (H) C and M Sub Division (Package 63)
Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening at km 4/8 - 6/0, 7/0 - 15/0 of Namakkal - Kananur road including junction improvements, Construction of Retaining wall, Well protective wall, Drain and CD Works
Providing steel staircase arrangements at east side of ESP MCC building, Removing the stains on the sanitary wares and tiles in the toilets at Service building and providing hand rails over the existing retaining wall in front of service building
Supply (supply-III), fab , ere of structures and SS aux, of battery set, panels, laying and termination of control cable and Construc of retaining wall on south side and providing fencing around the yard for the proposed Kallapalayam 110/11KV SS
Widening from IL to 2L and Strengthening at km 7/2 - 12/0 of Chunamedu - Perumbair Road including Reconstruction of Box culvert at km 7/4, 8/2, 9/8, 10/4 and Construction of Retaining wall at km 11/10
Widening from SL to IL and Streng, Impts to Riding Quality, Streng, Constn of Retaining wall, Reconstn of Culverts Constn of Box Culvert and Constn of Drain in the Government Roads of Nambiyur H C and M Sub Division CBE 004
Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Retaining Wall, Center Median, Widening of Culvert and up keeping the roads for a period of 60 months in Salem C and M Sub Division (Package-2)
Widening from Two Lane to Four Lane and Strengthening at km 22/0 - 24/0 of Ariyalur- Jayankondam road-via- Sendurai SH-217 including Reconstruction of Box Culvert, Construction of Retaining Wall, Centre Median and providing Buslay bye-VPM-051
Widening from Single lane to Intermediate and Strengthening at km 2/2 - 5/4, 5/6 - 6/6 of Kambainallur - Irumathur road including reconstruction of culvert at km 4/6 and Construction of Retaining Wall at Km 5/6 (SLM-56)
Sub work for Road Furniture works under the Main work of Widening from Two Lane to Four Lane and Strengthening at Km 6 8 9 4 of Madurai Alagarkoil Melur road including CD works and Construction of Retaining wall MDU155
Widening from SL to IL and Streng, Impts to Riding Quality, Reconstruction of Culverts, Constn of Retaining wall, Construction of Culvert, Drain and Reconstn of Box Culvert in the Government Roads of Gobichettipalayam H C and M Sub Division CBE 003
Southwest Monsoon 2019 Flood damage rectification works Construction of RCC Retaining wall from CH5152m to CH5167m on the valley side of the existing BT road on the road leads to Lakkadi branching from the Emerald Avalanche Road Nearer to Power House
Widening and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining Wall, Widening of Slab Culvert and up keeping the roads for a period of 60 months in Yercaud and Valapady C and M Sub Division (Package-20)
Widening and Improvements to Government Roads including Reconstruction of Box culvert, Construction of Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C and M Sub Division (Package-30
Widening from Single Lane to Intermediate Lane and Strengthening at km 1/0 - 3/6 of Km 233/6 of VCC road to Elur Gurusamipalayam road (via) S.Natamangalam, Kalyani including Reconstruction of Culverts and Construction of Retaining Wall (SLM-88)
Widening from Two lane to Four lane and Strengthening at km 24/0 -30/0 Ariyalur - Jayankondam Road (Via) Sendurai (SH-217) incl Widening and Reconstruction of Culverts, Construction of Drain, Retaining wall, Centre Median and Buslay bye-VPM-121
Widening from Single lane to Intermediate lane and Strengthening at km 3/0- 5/4 of Vikkiramangalam - Kadambur road including Reconstruction of box culvert at km 4/10 and Construction of Retaining wall at km 3/6,5/4-VPM-007
Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining wall and widening of Pipe Culverts and Up keeping for a period of 60 months in Sankari (H) C and M Sub Division (Package-27)
Widening from Single Lane to Intermediate Lane and Strengthening at Km 0/0 - 4/040, 4/290 - 4/8, 5/0 - 7/0 of Solakadu - Kulivalavu road including Construction of CC Drain, Retaining Wall and Reconstruction of Culverts (SLM-37)
Providing paver Block road, construction of drain and culvert at ward no.13 Mathipalayam 1st street-10th cross street and providing paver Block road construction retaining wall at ward no.13 Mathipalayam 1st street 11th cross street in Thenkarai TP
PACKAGE 61 Stg Impts to Riding Quality Reconstruction of Box culvert Reconstruction of Pipe culvert Construction of Retaining wall including up keeping for a period of 60 months in Govt Roads in respect of Mannargudi H C and M Subdivision
Widening from 2L to 4L and Strengthening at km 0by0 to 0by5 Widening from 2L to 2LPV and Strengthening at km 0by5 to2by8 of Natham Pillaiyarnatham road including Construction of Retaining wall at km 2by4 and Reconstruction of Culverts MDU015
Widening from Two Lane to Four Lane and Strengthening at km 45/2-48/8 of Omalur- Sankari-Tiruchengode-Paramathi Road including Construction of Drain, Retaining wall, well protective wall, CD Works, Providing Center median and Paver block (SLM-108)
Widening and Improvements Improvements to Riding Quality Construction of CD Works Providing Well Protective Walls, Constn of Retaining Wall works and including Up Keeping for a period of 60 months on Govt Roads in Bhavani H C and M Sub Division
Providing Junction Improvements and Approaches including Construction of RCC Retaining Wall at Km 2/4 of Vaigai River North Bank road from Anna nagar Viraganoor Ring Road including Land Acquisition in the Governments roads of Madurai West H C and M
Widening the existing 2 lane carriageway to 2 lane with paved shoulders from Km 33/9 - 34/2, 37/6 -37/9, 40/4 - 49/8 of NH 544H, Strengthening from Km 33/0-49/8 (Eligible stretches) including Construction of V shape drain andBreast Wall in Ghat sect
Dismantling the existing damaged RR Masonry Protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV /110KV SS yard of K.R.Thoppur 400 KV SS. (Chainage 215.00m to 250.00m)
Dismantling the existing damaged RR Masonry protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV / 110KV SS yard of K.R.Thoppur 400 KV SS. (Chainage 285.00m to 320.00m)
Dismantling the existing damaged RR Masonry Protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV /110KV SS yard of K.R.Thoppur 400 KV SS. (Chainage 180.00m to 215.00m)
Southwest Monsoon 2019 Kundah Generation work Construction of protection wall on the breached portion on the left side of PH 5 Tail race tunnel including repairing the side walls whenever necessary by providing concrete
construction of a brick masonry protection wall on northern side to eastern side from chainage 36 to 61 m and jungle clearance of SE/PEDC/ Perambalur office and 230 KV Auto SS at Perambalur
Standard dimensions of the court, Base preparation and laying of Asphalt Base, Asphalting, retaining wall, drainage system, Synthetic surface, Hockey goal post made of iron one pair with net, C digital score board electronic wired score board size 3 and 4 ft
Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at km 0/0 - 8/1 of Kanchipuram Byepass (west) including Widening of Slab Culverts, construction of Box culverts, Retaining wall, Centre Median and including LA at km 8/450
Wdng From IL to DL and Strngthng Const of Retaining wall Reconst of Box Culvert Widening of Pipe Culvert and Construction of Minor bridge in lieu of Existing Causeway in the Government Roads of Nambiyur H C M Sub Division CBE 015
Wdg and Impts Impts Impts to Riding Quality Constn of CD Works Constn of Retaining Wall and Incl Up Keeping for a period for a period of 60 months on Govt Roads in Aravakurichi H C M Sub Dn Pkg No 79
Package No 2 Impts of Govt Roads THENI and Andipatti H C and M Sub division including widing the exisng RCC culvert Reconstruction of RCC slab culvert Construction of Retaining wall Drain and Paver Block inclng upkeep for a perid of 60 months
Providing CC road at ward No 1 Ayyampathy tribal village area Ayyampathy cross road 2 Construction of drain and culvert at ward no 1 Ayyampathy cross road 1 and 2 and construction of retaining wall at ayyampathy main road 2 checkdam road
Widening from Single Lane to Intermediate Lane and Strengthening at Km 0 0 2 0 of Sholavandan Karuppatti road including Reconstruction of Culvert at Km 0 4 0 6 1 6 and construction of Retaining wall at Km 1 250 1 600
Widening from Intermediate Lane to Two Lane and Strengthening at km 9/0 - 12/6 of Kodavasal - Koradachery - Lakshmangudi - Mavoor road including Reconstruction of Culvert at Km.10/4, Construction of Culvert Body wall at Km.11/6 and Retaining wall at
Widening from Single Lane to Intermediate Lane and Strengthening at km 11/0 - 12/0 of Ramanathapuram - Kasipalayam Road including Construction of Minor Bridge at Km 11/4 and Reconstruction of Box culvert at Km 11/6 and Construction of Retaining wall
Widening from Intermediate Lane to Two Lane and Strengthening at km 10/6 - 11/4, 12/2 - 16/2 of Moolapathai Chinnappampatti road (via) Panikkanur including Construction of culvert at km 14/2 and 16/2 and Construction of Retaining wall (SLM-11)
Widening from Single lane to Intermediate lane and Strengthening at km 62-7 4 and Strengthening at km 4 0 6 2 of Pavoorchatram Sundarapandiapuram road including construction of Retaining wall at km 6 4 6 6 6 8, 6 10 TNV 09
Widening from Intermediate Lane to Two Lane and Improvements at Km 4/350-6/4 of Malayalapatty - Thammampatty Road (via) Ulipuram including Construction of Retaining Wall at Km 4/4, 4/10, 5/2, 5/4, 5/6 and 5/8 (SLM-89)
Widening from Single lane to Intermediate lane and Strengthening in Km.3 200 4 920 of Varalotti Palavanatham road including Reconstruction of Box culverts at Km.3 8 and 4 2 and Construction of Retaining wall at Km 3 4 TNV-17
Widening and Improvements to Riding Quality to Government Roads including Construction of CD works, Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C and M Sub Division (Package-29)