Loading…
Loading…
3,985 results • Best match
Construction of Retaining wall to the public toilet at ward no 10 K K Chavadi area and Construction of septic tank to the public toilet at ward no 6 ayyasamy kovil street and ward no 10 thatco colony in Ettimadai Town panchayat.
Wdg from 2 Lane to 4 Lane and Sth at km 2/0 - 19/2 of Ariyalur - Jayankondam road (via) Sendurai including Construction of Retaining wall, Drain, center median, Reconstruction of Minor bridge, Wdg slab culverts and Reconst of culverts -VPM-057
Widening from Intermediate lane to Two lane and Strengthening at Km 0/0-0/6 of K.Sathanur - Manalmelpatty road (Via) Vadugapatty including Reconstruction of Box culverts at Km 0/2, 0/6 and Construction of Retaining wall at Km 0/6. (TRY-07)
Painting the Retaining wall Intermedian garden kerb wall Speed breakers in Dairys main entrance 1st gate to 2nd gate to JMDs office roundana Security room 1 2 OCB VCB room Amenity block and DGM P office to South dock building premises at AD
Can be seen in the tender documents
Providing transformer plinth, structural plinth, providing RCC road,Metal spreading ,Cable duct ,culvert and Fire protection wall for Enhancement of existing Auto Transformer Capacity from 2x100 MVA to 3x100 MVA at Deviakurichy 230/110kV SS
South west Monsoon 2019 Providing Gabion wall on the earth slipped location in between CH-5000 to CH-5070 on the cutting and filling side of the road leading to PH-6 from Emerald in Nilgiris District
Providing transformer plinth, structure plinth, Metal and stone dust spreading ,Cable duct ,culvert and Fire protection wall and allied civil works for Erection of 3rd 100 MVA Auto Transformer at existing Vinnamangalam 230/110 kV SS
KPSHEP / Emerald South West Monsoon 2019 Flood Damaged rectification works Repair and Renovation of S type Quarters (Block No.2) and construction of protection wall on rear side in the PH 6 camp in Nilgiris District.
Providing 110 kV equipment plinths, filling with HBG metal construction of cable duct, fire protection wall, and allied civil works for establishment of of Puruvankara 110 KV Indoor substation at Pallikaranai Village in Chennai Operation Circle
Can be seen in the tender documents
Widening from Two lane to Four Lane and Strengthening at km 6/8,9/4 of Madurai Alagar koil Melur Road including CD works and Construction of Retaining wall works in the Government road of Madurai West H C and M Sub Division MDU 127
Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0-1/0 of Allithurai - Athavathur Road including Construction of Box Culvert at Km 0/2,Reconstruction of Box Culverts at Km 0/4,6,10 and Construction of Retaining Wall at km 0/6
Widening from Two lane with Paved shoulder to Four Lane and Strengthening at km 29/0 30/0 of Palayam Bodi Road including Construction of culvert at km 29/4, Reconstruction of Culvert at Km 29/6, Construction of Retaining wall Drain and providing Ce
Widening from Single Lane to Intermediate Lane and Strengthening at Km 15/8 - 16/8 of Denkanikottai - Jawalagiri - Karnataka State Limit Road including CD Works at Km 15/10, 16/6, 16/8 and Retaining Wall at Km 16/6 and 16/8 (SLM-105)
Widening from 2 Lane to 4 Lane and Strengthening at km 6.5 to 7.0 of Korattur Thinanur Periyapalayam Road Including Construction of Strom Water Drain at km 6.5 to 7.0 B_S Retaining Wall at km 6.10 Centre Median and Widening of Culvert at km 6.10
Widening from Two Lane to Four Lane and Strengthening at Km 18/6-22/6 of Hosur - Denkanikottai (via) Thalli Road including CD Works 19/4, 19/8, 20/2, 21/8 (i), 21/8 (ii), 21/10 and Construction of Retaining Wall (SH 17B)
Wdg from 2L to 4L and Stg at Km 0by0 to 6by0 of Palladam Dharapuram Road Including CD Works, Drain, Constn of Retaining Wall and Providing Centre Median Sub Work Providing Road Furniture at Km 0by0 to 6by0 of Palladam to Dharapuram Road SH 174A
Wdg from Two Lane to Four Lane and Stg at km 30/2-35/2 of Vellimedupettai-Pondy Road-via-Mailam incl Reconst of RCC Box Culverts Construction of Kerb type Center Median, Junction Improvement, RCC Retaining wall and Storm water drain-VPM-094
Widening from Two lane to Four lane with paved shoulders and Impts at Km 23/230 - 24/165,WideningfromFourlane of the ROB Service road in Palani side in Km 24/403 - 24/880, Reconstruction and Widening of CD Works Drain and Retaining wall MDU-056
Wdg from 2L to 2L with Paved Shoulders and Strengthening Works Geometric Impts to curve Constn of Retaining Wall Reconstn of Box Culvert Widening of Slab Culvert and Constn of Culvert Work in Govt Roads in Tirupur North H CandM Sub Division TPR 62
Providing structure plinth breaker plinth extension of cable duct construction of retaining wall for yard filling of yard water supply arrangements for 11 kV bay extension works to provide the puliyur 11 kV feeder for CWSS at T Nallur 110 33 11 kV SS
South west monsoon 2019 -Flood damage rectification works-Construction of RCC toe protection wall at CH-10080m on the earth slip location on the road leads to approach near KPSHEP work site and PH 6 from Emerald
South west monsoon 2019 -Flood damage rectification works-Construction of RCC toe protection wall at CH-10130m on the earth slip location on the road leads to approach near KPSHEP work site and PH 6 from Emerald
MTPS-II - Civil Circle - Dismantling the existing damaged RR Masonry Protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV /110KV SS yard of K.R.Thoppur 400KV SS. (Chainage 75.00m to 110.00m)
MTPS-II - Civil Circle - Dismantling the existing damaged RR Masonry protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV / 110KV SS yard of K.R.Thoppur 400 KV SS. (Chainage 250.00m to 285.00m)
Providing Various Structural Plinths Fire Protection Wall Releasing Lowering restringing and rearranging of 110 33 KV System with 2 Nos of 33 KV Feeder at existing Irugur 110 11 KV SS for extension to M s Bharath petroleum
Widening of Curve at Km 11/2, 4, 11/8, 10, Construction of Drain at Km 11/2, 11/4, 11/8, Construction of Retaining Wall at Km 11/2, 4 and Improvements at Km 11/0-12/0 of Gajalnaickenpatty - Panamarathupatty - Seshanchavadi Road (MD594) (SLM-101)
Widening from Single Lane to Intermediate Lane and Strengthening at Km 9/0-12/6 of Unjini - Variyankaval road including Reconstruction of Box culvert at Km 11/6, 12/6 and Construction of Retaining wall at Km 11/4,6, 10, 12/2 and 12/6-VPM-007
Providing RCC Retaining wall at Km 0/8 of Ramanathapuram Keelakarai road in the Main work of Construction of Road Over Bridge at Km 0/2 of Ramanathapuram Keelakarai road in lieu of existing LC NO 501 at Railway km 615/200-300 in between Ramanath
Wdg from TL to TL with Paved Shoulders and Stg at km 13/030-13/8 of Mundiyampakkam- Pondicherry road including providing Paver blocks and Const of Drain,Wdg of pipe culvert at km 13/8and Const of Retaining wall at km 13/8-VPM-085
Widening from Single Lane to Two Lane and Strengthening at Km 4/4 - 6/0 of Denkanikottai - Panchapalli Road including CD Works at Km 4/8, 4/10, 5/2 (i), (ii), 5/4, 5/6 (i), (ii) and Retaining Wall at Km 4/10 (SLM-97)
Strengthening at Km.3/5-4/5,6/0-10/0 and 19/6 - 20/0 of Eraiyur-Kandappankuritchi-Nallur road including Reconstruction of Box Culvert at Km 4/4, 7/2, 9/2 and 9/6 and construction of retaining wall at Km 19/10-VPM-048
Widening from Two Lane to Four Lane and Strengthening at km 5/0 - 10/6 of Kavarapettai - Sathyavedu Road including Reconstruction of RCC Box Culvert at Km 5/2, 5/8, 5/10, 8/2 Widening RCC Box Culvert at Km 7/2 and Retaining Wall
Widening from Intermediate Lane to Two Lane and Strengthening at km 0/150-0/8, 2/0-6/0 of Tirukoilur Manalurpet road including Reconstruction of Culvert at km. 4/2, 4/4, 4/8 and Construction of Retaining wall at km 4/6,4/8-TVM-85
Widng from SL to IL and Strengthening Widng from IL to TL and Streging Widng from Two lane to Two lane paved shoulder and Strengthening Constn of culverts Constn of Retaining wall in the Government roads of Anaimalai H C and M Sub Division CBE 055
Widening from Two Lane to Four Lane and Strengthening at km 37/0 - 41/0 of Chittoor-Thiruthani Road including Construction of Drain, Center median, Retaining wall, Widening of Box culverts at Km 37/10, 38/6, 39/8, 40/2, 40/4, 40/8, 40/10
Providing R.C.C retaining wall , cable duct and HBG metal spreading for 110 KV feeder bay Area and providing AC arrangements for P AC room and allied civil works for enhancement of 4X16 MVA to 6X 16 MVA and 4 Nos 110 KV feeders at Zuzuvadi 110
Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0-4/0 of Kallathur- Pappakudi- Melanikuzhi road including Construction of Retaining wall at km 2/2,2/4,2/6, 2/8,2/10,3/4,3/8 and Reconstruction of culvert at km 3/8 (VPM-060)
New Formation of BT Road and Retaining Wall at Salt Road East Extension, Sannathi St 1st Cross St, 2nd Cross St, Theradi St 1st Cross St, Sambuvelli 7th Cross St, Matha Kovil Street 4th Cross St, Muthu Nagar, AMR Nagar Main Road, AMR Nagar 1st Cross
Widening from Intermediate Lane to Two Lane and Improvements at Km 0/0-2/7 of Road Branching from Km 19/6 of Suramangalam - Tharamangalam Road to Siddhar Koil Road including Const of Retaining Wall at Km 0/2,6,8, 1/2,4,6,8,10 and 2/2,4,6,8 (SLM-65)
Strengthening at Km 2/100-3/200 of Madurai - Thondi road (SH 33) including Widening of Minor bridge at Km 2/10, Widening of approach road, Widening of culvert at km 2/10 (i), (ii), Construction of retaining wall,load bearing drain at km 3/2
Widening from Intermediate Lane to Two Lane and Strengthening at km 0/6-2/6, 7/6-8/0, 8/2-9/0 of Kodavasal -Koradachery-Lakhsmangudi-Mavoor road including Construction of Retaining wall at km 8/6, 8/8 i, 8/8 ii, 8/10
Supply, Fabrication, Erection and earthing system of substation auxiliaries of 110 KV 33 KV Side and Providing various types of plinthss, cable duct, fire protection wall for enhancement of the existing 110/33 Kv transformer capacity from 1x16 MVA
Construction of toilet and allied civil works Alu partition and vitrified tiles Protection wall and entrance gate for accommodation of the AE Town Somanur and AE Rural Somanur Section Office in the existing old control room at Somanur SS
KPSHEP - Emerald- South west monsoon 2019 -Flood damage rectification works -Construction of RCC toe protection wall from CH-9890 to CH-9940m on the valley side of the road leads from Emerald to KPSHEP work site and PH 6
KPSHEP - Emerald - South west monsoon 2019 - Flood damage rectification works-Construction of RCC toe protection wall from CH-9840 to CH-9890m on the valley side of the road leads from Emerald to KPSHEP work site and PH 6
07/2020-21 of SE GCC CBE
Providing HDPE Tank , Desilting, Dewatering and construction of protection wall to existing open well and Extension of pipeline at Ward No.4, Amman Nagar , Ward No.5, Bhagavathy Nagar ,Ward No.6, Madheshwaran Nagar , Ward No.10, Near Union Office An
Providing Cement Concrete Pavement to Ward No.3 Ceylone Colony, Ward No.3 Thalaiyanallur Colony 1 to 9 Cross Streets, Ward No.5 LBS 1 to 6 Cross Streets, Ward No.8 Anna Theru and Culvert at Ward No.3 Ceylone Colony, Retaining Wall at Ward No.3 Ceylon