Loading…
Loading…
3,985 results • Best match
Widening from Two Lane to Four Lane and Strengthening at Km 0/7-1/4, 2/4-3/8, 5/6-6/4, 7/2-10/0, 12/0-14/4 of Hosur - Denkanikottai (via) Thalli Road including Providing Median, Drain, Construction of Retaining Wall and CD Works (SLM86)
Widening from Two Lane to Four Lane and Strengthening at km 16/0 - 22/0 of Chittoor-Thiruthani Road including Construction of Center median, Retaining wall, Widening of Box Culverts at Km 16/8, 17/2, 17/10, 18/2, 19/4, 20/6, 21/6, Reconstruction of
Wdg from Two Lane with Paved Shoulders to Four Lane and Stg at km 32/0-42/0 of Vridhachalam-Tholudur road incl Reconst of culverts,Wdg of Culvert,Const of Retaining Wall, Const of Centre Median,Urban Development in Town limit and bus lay bay VPM-052
Wdg from Two Lane to Four Lane and Stg at km 0/0 - 10/2, 25/0 - 30/2 of Vellemedupettai - Pondy road (via) Mailam incl Wdg and Reconstruction of CD works, Const of RCC Drain, Center Median, Bus lay bye, PaverBlock and Const of Retaining wall-VPM-096
Widening from Intermediate Lane to Two Lane and Strengthening at Km 0/0 - 6/0 of Mallapuram - Gopi nathampatti Road (MD1241) including Construction of Retaining Wall at Km 3/4, 4/2, 5/2 and 5/8 and Widening of Culvert at Km 3/4, 4/2 (SLM-47)
Widening from IL to TL and Strengthening at km 2/8 - 4/6 of Vadugapatty - Alanganatham road including Reconst of Pipe Culvert into Box culvert at Km 3/10 and Const of Retaining Wall at Km 2/8-4/6 (Tank Bund) (CRIDP-21-22-M-0788) (SLM-41)
Widng from SL IL and Impts at Km 4.0 to 6.0 and 14.0 to 16.0 of Thalavadi Konghalli Road inclding Widng of slab culvert at Km 4.6 5.2 14.10 and Constn of Retaining wall at Km 4.6 5.2 5.6 14.10 15.4 15.6 Pipe culvert Km 14.4 15.6 CBE 083
Providing 1 No. of 400 / 230 KV ICT Plinth along with Fire protection wall and oil sump for a capacity of 500 MVA towards enhancement at existing 400 / 230 KV Tiruvalam SS and providing 3 Nos. of feeder bay to accommodate Kanchipuram feeder
Widening from SL to IL at km 0/0-1/6 of Keeladi to Parani Chamber road including Reconstruction of Culverts,km 0/2, Cost of Retaining wall km 0/8,10 and Const of Drainage at km 0/4 works in the Govt roads of Manamadurai (H) CandM Sub-DivisionMDU 094
Formation of Outer ring road for Erode Town (Phase III) Km 7/6 14/8 including Construction of ROB at Km 11/2 11/6 in Jeeva Nagar Sub work Construction of Retaining wall on Left Side of Erode Outer Ring Road at Km 8/0 9/0 with height 3.60m
Formation of Outer ring road for Erode Town (Phase III) km.7/6-14/8 including Construction of ROB at Km.11/2-11/6 in Jeeva Nagar Sub Work Construction of Retaining wall on Left Side of Erode Outer Ring Road at Km.8/0-9/0 with height 3.10m
Widening from Single Lane to Intermediate Lane and Strengthening at Km 2/6-5/8 of Madhiyanur road including Reconstruction of culverts at Km 2/8, 2/10, 3/2, 4/6, 4/10 and 5/6 and Construction of Retaining wall at Km 5/6 and 5/4 -TVM-48
Widening from Intermediate Lane to Two lane and strengthening from Km 2/5-4/0 and 5/0 -12/0 of Kurinjipadi - Palur road SH-252 including Re-construction of culvert at km 5/8, km 8/10, km 9/8 and construction of Retaining wall at km 7/6
Widening from Two Lane to Four Lane and Strengthening at Km 15 0 18 4 of Madurai Alagarkoil Melur Road including Widening of Minor Bridge at Km 15 2 Reconstruction of Culverts at Km 15 4 16 10 Construction of Retaining Wall at Km 16 525 16 750 16 1
Wdg from SL to IL and Stg at km 0/0-2/0,5/0- 6/0, 7/0-8/0 of Kallathur-Pappakudi- Melanikuzhi road including Reconst of Box culvert at km1/4, 5/6,7/6 and Const of Retaining wall at km 0/2,4,6,8,10,1/2,8, 5/2,4-VPM-6
Strengthening at km 0 by 0 to 6 by 8 of Sivagiri to Vadapalani road including Construction of Retaining wall at Km 0 by 4 3 by 4 6 by 6 6 by 8 and Construction of Well Protective wall at Km 5 by 4 5 by 6 MD 1138
Widening from Intermediate Lane to Two Lane and Strengthening at km 4/0 - 7/0, 10/0 - 11/4, 16/2 - 17/6 of Perumanadu - Konnaiyur road including Reconstruction of Box culvert at Km 4/2,6, 6/6, 10/4,8, 11/2 and 17/4 and Construction of Retaining Wall
Wdg from Single Lane to Two Lane and Stg at km 0/0 - 1/0 and 4/0 - 6/0 of Anaikudam - Cholamadevi - Kodalikaruppur road including Reconstruction of Box culvert at km 0/2, 0/10, 5/10 and construction of retaining wall at Km 0/8, 0/10-VPM-011
Widening from Two Lane to Four Lane and Strengthening at Km 7 6 8 0 11 0 12 0 13 8 15 0 of Dindigul Gujiliamparai Karur Road including construction of Culvert at Km 11 8 14 2 14 6 14 8 14 10 Paver Block Retaining wall and Extra Widening for Curve
Widng from 2 lane to 4 lane and Strng at km 0 0 to 11 0 of Sathy Athani - Bhavani road SH 82 including Wideng of Minor Bridges at Km 5 8 5/10 7/6 Reconstrn of Box culvert and Wideng Slab culvert and Construn of Drain and Retaining wall CBE 096
Widening From Single lane to Intermediate lane and Strengthening at Km 0 0 2 0 of Thadicombu Poothampatti Road including Culvert at Km 0 2 6 8 1 2 4 Protective wall at Km 0 2 6 and Retaining wall at Km 0 2 6 10 1 2 4 6 8 MDU038
Widening from Two Lane to Four Lane and Strengthening at Km 10/0-12/0 and 14/4-18/6 of Hosur -Denkanikottai (via) Thalli Road including CD Works at Km 11/4, 14/10, 15/6, 15/8, 16/6, 16/10 and Construction of Drain, Retaining Wall and Paver Block
Arresting fly ash leakage from the damaged portions of concrete in between RCC shell top and roof deck sheet an around supporting angles of fly ash silo 1 and 2 and Bottom Ash Silo 1 and 2 and construction of Protection wall after dismantling the
Providing 230kV Tr Plinth equipment plinth fire protection wall cable duct and allied civil works for Enhancement of existing 230 110 KV Auto transformer capacity for 2 100MVA in to 3 100 MVA at Ambattur 3rd main road 230 110 KV SS Civil works
Wdg from T.L to F.L and Impts at km 0/0-4/0 and Wdg from T.L. to F.L. and Stg at km 4/0-16/0 of Tindivanam - Marakkanam road (SH 134) incl Wdg /Recosnt of CD works, const of RCC drain, Center Median, Bus Lay bye, paver block Retaining wall-VPM-056
Wdg from IL to TL and Stg at km 0/0 - 4/0 of Alankuppam-Konerikuppam -via- Avanipur road including reconstruction of Box culvert at km 0/2,6, 10 i,ii, 1/2, 6,10,2/8,3/6 and 3/10 and construction retaining wall at km 0/4 and 1/4.MDR-748 - VPM-39
15/2019-20 of SE GCC CBE
Erode outer ring road Km.7/6-14/8 of Impts to Ch 7/5-7/8, 10/4-10/6 and 14/1-14/7 (Left out portion due to court case) sub work of Construction of retaining wall on Right side Erode outer ring road at Km.10/0-10/8 with height 3.10m
Erode outer ring road Km.7/6-14/8 Jn Impts to Ch 7/5-7/8, 10/4-10/6 and 14/1-14/7 (Left out portion due to court case) sub work of Construction of retaining wall on Right Side of Erode Outer Ring road at Km.8/0-9/0 with height 3.60m
Erode outer ring road Km.7/6-14/8 of Impts to Ch.7/5-7/8, 10/4-10/6 and 14/1-14/7 (Left out portion due to court case) sub work Construction of retaining wall on Right Side of Erode Outer Ring road at Km.7/6-8/0 with height 3.10m
Erode outer ring road Km.7/6-14/8 of Impts to Ch 7/5-7/8, 10/4-10/6 and 14/1-14/7 (Left out portion due to court case) sub work of Construction of retaining wall on Right side of Erode outer ring road at Km.8/0-9/0 with height 3.10m
Erode outer ring road Km.7/6-14/8 of Impts to Ch 7/5-7/8, 10/4-10/6 and 14/1-14/7 (Left out portion due to court case) sub work of Construction of retaining wall on Left side of Erode outer ring road at Km.7/6-8/0 with height 3.10m
Construction of retaining wall at Km 6 by 2 6 by 6 6 by 10 7 by 6 8 by 6 9 by 2 9 by 6 10 by 6 10 by 10 11 by 0 12 by 0 12 by 4 of Sothuparai Agamalai road including construction of Drain at Km 0 by 2 0 by 4 0 by 6 of Ethakovil Road MDU 027
Wdg from SL to IL and Stg to Km 0/0-4/0 and 6/0-6/5 of Esanai-Annukur road including Reconst of Culvert at Km 0/2 (i) (ii), 0/8, 0/10, 1/2, 1/8, 2/6(i),(ii), 3/2, 3/10 and 6/2 and Const of Retaining wall at Km 0/10, 2/6, 2/8, 2/10 and 3/8 VPM-9
CC PRIMEDTEX 12000 8, 61 DENSITY 8820 PILE HEIGHT 50MM GAUGE 5by8, WHITE GRASS FOR LINE MARKING DTEX 12000 DENSITY 8820 PILE HEIGHT 50MM, MATERIAL SUPPLY AND INSTALLATION, SIDE NET 2.5MM AND THICKNESS 50 MASS TOP NET B1.5MM ANDTHICKNESS 50 MASS, ... AND RETAINING WALL , ...