Loading…
Loading…
1,275 results • Best match
Civil Work for Construction of Boundary wall including Retaining wall after Dismantling of old boundary wall and Earth filling of 01 Nos. 132 KV TSS Bay at 220/132 KV S/s Chandpur Distt. Bijnor
Under the Utility Water Management initiative, the construction of a retaining wall along the pond extending from the western side of the Municipalitys Community Center to the northern side of Kashiram Colony is being undertaken.
Construction work of 217.00 meter CC road and retaining wall (part-03) from Saurabh Rathi Chak to Meher Jahan Chak in Village-Akka Pandey Bhojpur Urf Akka Fattu, Tehsil-Sadar, District- Moradabad (MP-NIDHI WORK)
Under District Lucknow, Construction of CC road and drain and retaining wall from Asphalt Road near Junior High School in Sarsanda under development block Kakori to the house of late Comrade Lekhram., Lot No 1
Construction of a 50-meter retaining wall from Km 3 of the Dara link road to Km 1 of the Chautaraghat link road and a wing wall on the minor bridge located at Km 2.
Civil Work for Construction of Boundary wall including Retaining wall after dismantling of old boundary wall and Earth Filling for 01 Nos. 132 KV TSS Bay at 220/132 KV S/s Chandpur Distt. Bijnor.
Construction of a retaining wall by the RMC in the damaged dot nala located in front of House No. 111/1, Harsh Nagar of Ashok Nagar and Ward 05 Jawahar Nagar Ward-37 Zone 04.
Construction of V.R.B., Protection wall, Canal Lining, Restoration of outlets and Stregthning of Banks of Zamania pump canal system under jurisdiction of Irrigation Construction Division Varanasi, in District Ghazipur.
WARD NO 10 TARNA ANTARGAT PRIMARY PATHSHALA SE POKHRI HOTE HUEE BHAGATPUR GAON TAK JODNE VALE MARG PAR TALAB KE KINARE PROTECTION WALL AVAM MARG PAR INTERLOCKING KA KARYA
Laying of Brick Kharanja from km. 23.900 to km. 28.000 and construction of protection wall and re-construction of kulaba between km. 23.900 and km. 28.000 of dy. Pilkhatra.
Supplying and laying of Hume-pipes, stone aggregates, Gabion boxes at different places in mine on as, when and wherever required basis in Industrial and Mine areas at Dudhichua Project.
Providing protection work with gabion boxes and PVC OB filled bags on both sides of haul road, for intermediate sump and for main sump at central entry of Dudhichua Project
Supplying and laying of Hume pipes, stone aggregates, Gabion boxes at different places in mine on as, when and wherever required basis in Industrial and Mine areas at Dudhichua Project
Supplying and laying of Hume pipes, stone aggregates, Gabion boxes at different places in mine on as when and wherever required basis in Industrial and Mine areas at Dudhichua Project.
Providing protection work with gabion boxes and PVC OB filled bags on both sides of haul road, for intermediate sump and for main sump at central entry of Dudhichua Project
Cleaning and desilting of sumps, drains, culverts along with gabion walls at various places in East Sec-tion, West Section, Central Entry in-cluding CHP Prem-ises at Dudhichua Project
Tub bail No 03 Laying Work of CCC Floor and toe wall.
Construction of retaining wall to protect the damaged portion of the road on the banks of Jamdhara pond at Km-5 (150) of Madhani to Dhekhari-Sansari-Dhebarua road on Farenda Naugarh Barhni Shravasti (N.M.-1A).
Construction of retaining wall for safety of existing road near Lala Manmohan Das School and protection of nearby under-construction drains under road widening work by the Authority from Jhunsi Bus Stand to river Ganga bank.
Widening of Culvert no. 33/5 in km 33.00, Construction of KC drain on both side of the Culvert and Construction of Retaining wall between culvert no. 33/4 and 33/5 on NH-72A (307).
Earth filling, retaining wall, drain and interlocking work from Tejpal house to Maa Bhagwati Bal Vidyalaya, from Man Singh house to Mahesh house, from Vijender house to Radheshyam house in Ward No. 28 Mohalla Sarai Harnarayan.
Construction work of 250.00 m CC road and retaining wall on both sides from Sardar Sukhdev Singh ji Dera to Mundhapande Sanda PWD road main road in village- Jagarampura, Block-Mudapandey, District- Moradabad (MP-Nidhi Work)
Earth filling, retaining wall, drain and interlocking Work in the streets from Munesh house to Brajesh house, Raghuveer house to Ramjilal house, Triloki house, Bobby house and Bhagwandas house in Ward No. 28 Mohalla Sarai Harnarayan
Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH 24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode
Work of retaining wall, boundary wall, pathway, facing, rain water harvesting etc. for the development of Shakti Van in Akbarnagar on the banks of Kukrail river located on Lucknow-Ayodhya road under Lucknow Municipal Corporation area.
Work of approach road for underpass culverts, retaining wall on the route from Chand Samand Chauraha to Radhna bridge ODR via Pirpur, Dadri, Salawa, Alamgirpur Faridpur for Major Dhyan Chand Sports University campus in Meerut district.
Cleaning and desilting of sumps, drains, culverts along with gabion walls at various places in East Section, West Section, Central Entry including CHP Premises and Khadia side dump at Dudhichua Project.
Earth filling, retaining wall, drain and interlocking construction work from Sanjay house to Rajkumar house, Ramveer house to Govardhan house, Somveer house, Rahul house, Mahesh house in the link streets in Ward No. 28 Mohalla Sarai Harnarayan
Construction of retaining wall to protect the damaged portion of the road on the bank of the pond located at Km-1(100) and CC and 1(70) of Shahpur Dhobha to Rajpur Junebi road link road.
CONSTRUCTION WORK OF 72.00 M INTERLOCKING ROAD AND 144.00 M DRAIN AND 125.55 M RETAINING WALL FROM MAIN ROAD TO ABRAR HOUSE IN FRONT OF BHARAT HOTEL IN VILLAGE-SIHALI JAGIR , BLOCK- GAJRAULA, DISTT.-AMROHA. (NIDHI WORK)
Supplying of mechanically woven double twisted Hexagonal shaped wire mesh gabion box Crate of size (1.0x1.0x1.0)M, Mesh size (10x12)cm of 10 SWG G.I. wire in District Kushinagar. Lot No. 03
Manvar nadi ke tat par isthit gram sabha kakra khurd and nyori anteyesthi sthal se manwar nadi par foot over bridge tak jane ke liye 1x4 meter ki 02 nos RCC puliya and retaining wall ka nirman karya
Making retaining wall of River bank and pitching slope at Bhusi North Pump Canal including all cost of material (excluding Cement and Bricks,), labour, T AND P used complete in all respects as per drawing provided by department.
Construction of retaining wall in 100 m length from Chainage 3.300 to 3.350 and chainage 3.450 to 3.500 of Jamua Sampark Marg via Byonja Baghela Singhpur from km 3 of Baberu Tindwari Marg (Including maintenance for five years)
LABOUR CHARGES FOR CONSTRUCTION OF RETAINING WALL FROM KM. 4.70 TO KM. 4.85 AND FROM KM. 5.95 KM TO KM. 6.23 AT WIDENING AND STRENTHENING OF SERVICE ROAD MAKING PUCCA METALED ROAD JANLA DY. BELAN CANAL DIVISION ALLAHABAD
Construction work of Earth filling, retaining wall, drain and interlocking work from Mahashay Pradhan house to Mahesh Chandra house, from Inderpal Singh house to Suresh house, from Satyapal house to Jagdish house in Ward No. 03 Mohalla Jalalpur
Making retaining wall of River bank and pitching brick of slope at Koniya Pump Canal including all cost of material (excluding Cement and Bricks,), labour, TAND P used complete in all respects as per drawing provided by department.
RETAINING WAALL NIRMAN KARYA
construction of fire protection wall at 33/11 K.V Sub Station Udhyogpuram, Gagol 1 shatabdinagar sector 2 3 ,4 kazipur Lohiyanagar pocket c baghpat road panchli under electricity distribution division 1 meerut
jaitipur gram khamariya me retaining wall evam nala
Constructing Retaining wall at km. 2.176 Ganaura Mr.
GVMSOLAN Class 1(Mild steel wire coated with Zinc or Zinc alloy),, GVMSOLAN Class 1(Mild steel wire coated with Zinc or Zinc alloy), 3mx1mx1m (2 Nos.) Gabion- 8x10 ('D' Nominal Size=80mm)
Supply of HDPE/PP Bags (New E.C Bags), Geo Bag, PP Gabion rope at Store Near at Km 4.400 of Katriya- chandpur Bund on left bank of River Ghaghara in Distt- Basti. Lot_09
Unbranded Class 1(Mild steel wire coated with Zinc or Zinc alloy),, Unbranded Class 1(Mild steel wire coated with Zinc or Zinc alloy), 3mx1mx1m (2 Nos.) Gabion- 10x12 ('D' Nominal Size=100mm)
Unbranded Class 1(Mild steel wire coated with Zinc or Zinc alloy),, Unbranded Class 1(Mild steel wire coated with Zinc or Zinc alloy), 2mx1mx1m (1 Nos.) Gabion- 10x12 ('D' Nominal Size=100mm)
Provision of RCC toe wall between Bridge 33A 1 and Br. 33, Boundary wall at RHS from KM 1.200 to 1.450 and KM 1.500 to 2.450, Pucca drain from KM 1.650 to 2.450, Central drain between Br. 197 to Br. 198, RCC toe wall between KM 5.750 to KM 5.950 both side, drain between tracks and Drain on slope yard at back side of Platform wall in JHABRERA and BANHERA KHAS yard, Drain at Br. 72 & Br. 58 (LHS along to chak road U-Wall) and Rectification of deficiencies in station building and straff quarters in RK-DBD Line In the section of SSE/W/RK under ADEN/RK.
Nagar Palika Parishad Ujhani m Ward No 11 m Rajesh Verma ke Makan se MunnaLal ke Makan tak Interlocking Sadak aur Nali Nirman aur Tinku sharma ke Makan se Pass Sadak Aur Retaining Wall ke Diwar Marammat Ka kary
Construction of 4 lane Elevated viaduct at Km 7 030 to 8 890 including construction of 4 Lane flyover from Km 7 080 to 8 890 (Munshipulia Chouraha) including RE Wall, Retaining wall and approaches on NH-24 A
Construction of fire protection wall for safety of Transformer at 33/11 K.V S/s Meerut Road Mawana, Dhikoli Road Mawana, Bana, Tofapur and Phalwada under Electricity Distribution Division-I Mawana, Pvvnl Meerut.
Construction of fire protection wall for safety of Transformer at 33/11 K.V S/s Kila Parikshit Garh, Narangpur, Khaujari, Hastinapur, Behsuma, Seena and Modkhurd under Electricity Distribution Division-II Mawana, Pvvnl Meerut.