Loading…
Loading…
4,121 live2,806 closing this weekmost from Madhya Pradesh Rural Road Development Authority and PWD
4,121 results • Best match
CONSTRUCTION WORK OF APPROACH ROAD AND MINOR BRIDGE OF 9X4X4.00 M AND 7X3X3.00M SPAN AT LOCAL NALA BETWEEN KM-1 RAIGANJ LINK ROAD AND KM-2 GARHIGHAT LINK ROAD IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27 VIDHANSABHA-NANPARA
Construction of Minor bridge of 3x5x5 m span, approach road and protective work on Chafi Tola link road under Belwa Kaji Lot No 4 of 5
Construction of a new RCC minor protective structure (3x5x3 span) over the drain and a new approach road on the Narayanchak Link road in Amethi district
Repair of Road,Drain and Cover Slab from Electric Sahi link Road in Ward No.9 of NAC Balliguda
Construction work of Khukhundu PMGSY road to Bhathat link Road Under CMGSY Scheme In district Deoria in FY 2026-27
Laying of CC road (Internal roads) at Dayakar reddy colony, Hanuman nagar,Chakarivagu approach road, old sc colony Pedda Amberpet, RK Puram,Laxmareddy Palem Rd no1, Pragathi Nagar (internal), GSY, Lumbini Enclave, Padmavathi Colony, Shilpi Enclave ... ( internal roads ), ...
Repairs to damaged BT road strengthening and Recarpating at tirumala bakery, approach road near vasudha hospital in ward-294 and 295 Bowrampet in Dundigal Circle-59,Quthubullapur Zone,CMC (6th call)
Improvement approach road work to Jakkanahalli village on the KengalAlur Road, from chainage 160.02 km to 198.54 km.In Arsikere Taluk,
Upgradation of rural road from Forest Check Post to Govt. Primary School, Sabari Old at Rangat, North and Middle Andaman under PMGSY-III - Recall.
Construction of a 4x5x5 meter RCC box culvert and additional approach road on the drain located midway along the Hirapur Ghat Murkatia link road, in District Jaunpur.
Construction of road approach road and retaining wall at Rongmonjir village under Special Grant to KAAC for the year 2026-27.
Construction of road from Peer Kanju to Thandi Kassi including link road to Chawa. ( Balance work)
Concreting of internal roads in Nalbag, Sangli Ward No. 16.
New construction work of various internal roads of Rahul Nagar
Approach Road to NTPHC D.K.Marg
Construction of road by interlocking tiles at Village Dhanauri-Dhanaura main road and internal roads in Piran Kaliyar constituency of district Haridwar Under State Sector (Job 2).
Upgradation of rural road from NH-04 to Nimbutala Ward No. 3 at Rangat, North and Middle Andaman under PMGSY-III, Batch-I, 2024-25
Construction of box culvert, approach road, and additional approach road at Hadahi drain in District Jaunpur.
construction of the Parhua Chhapar link road from the Bhokariya PMGSY road in Dist Kushinagar under CMGSY Scheme in FY 2026-27
Widening of road from plot no. 405-A to 405-H in Phase-III(EPIP)
Construction of a 2 x 3 x 3 meter RCC box culvert and approach road on the Seeniya drain along the bhusehara Chauhan Basti link road, in District Jaunpur.
Upgradation of rural road from NH-84 to 193 Rangat to Dhalikheti NH-04 to Rasadpur Anganwadi at Rangat North and Middle Andaman under PMGSY-III.
15. Remaining internal roads in Ward 3 at Waghalwadi Tal Baramati
CONSTRUCTION OF ROAD BY PCC FROM PMGSY ROAD TOWARDS THE HOUSE OF HEMANTA GHOSH AT BHOLADANGA
Construction of box culvert, approach road, and additional approach road at Besav river in Bhdauti, District Jaunpur.
Repair and resurfacing of road near Solar pond area to Lean RECL Processing Plant
43 Smart Board, furniture and link road construction work at Composite School, Bilhaini, Barauli Ahir
C O PMGSY MARG IN VILLAGE JADERUA TO RAMSAGARS HOUSE LINK ROAD INCLUDING MAINTENANCE UP TO 7 POINT 5 PERCENT OF CONTRUCTION COST
Construction work of 5x3x3 meter box culvert approach road and additional approach road on Suvao Nala in Vishrarampur
SPECIAL REPAIRS TO INTERNAL ROADS IN TECHNICAL AREA OF ARDE PASHAN, PUNE
11. Construction of the main and internal roads in Medad . Tal. Baramati
REPAIR / RESURFACING OF ROAD AT ICGS JAKHAU AND CGRA NALIYA UNDER GE (I) (CG) GANDHINAGAR
Composite work for development of Circulating area including paved approach road, Construction of Admin building and other buildings near Ratnagiri Railway Station.
Improvement work approach road construction work from Purulehalli to Shuntikatte on the road connecting Arsikere to Bendekere Garudanagiri Road in Arsikere Taluk,
Construction of 5x 5 Mtr. RCC Box Culvert at Chatiya Bhaisaha Panagahali Nala, approach road and additional approach road.
Construction of Dhokalpurwa Mansakpurwa Road to Bohiya Nala pr 5x6 Mtr Minor Bridge, Approach Road and Add Approach Road
STRENGTHENING WORK OF SEGWAL APPROACH ROAD LENGTH 1.50 KM., WASVI APPROACH ROAD LENGTH 1.60 KM. TOTAL LENGTH 3.10 KM.
Strengthening of Charkhari Approach Road Length 2.10 k.m. and Devgaon Approach Road Length 1.40 km Total Length 3.50 km.
Construction of minor bridge, approach road, and additional approach road at the drain in Gram Sabha Songar, District Jaunpur.
Construction of road from Nihanglangso to Rongsamphri link road under Special Grant to KAAC for the year 2026-27.
Reconstruction work of the Dungar approach road.
Road Resurfacing Of Bitumenous Road at Kartakvilla in Gandevi Municipality, Gandevi. Dist.:- Navsari.
REPAIR AND RESTORATION OF RURAL ROADS FOR COMMUNITY AT ALL SANSAD UNDER ORPHULI G.P AREA.
CONSTRUCTION OF ROADS FROM T07-FROM NH-31C AT CHAKCHAKA BUS STOP TO PMGSY ROAD NEAR KANCHI BAZAR VIA CHOTO DALDALI AND MARAKHATA HATKHOLA BAZAR UNDER KUMARGRAM BLOCK
Re-carpeting of Internal Roads and Associated Civil Works at NRPL Rewari Station
Strengthening work of internal roads of Block C of Anand Vihar Housing Scheme
Improvements to internal roads of Mathakovil Street in Thiruvettakudy village in Kottucherry Commune.
Construction of roads at different places in Haroa and Hingalganj Block b) Construction of road from Boalghata Bridge to Kolipukur under Haroa Block
Construction of road from Jhum Control to Rongjinong link road under Special Grant to KAAC for the year 2026-27.