Loading…
Loading…
3,826 live2,793 closing this weekmost from Madhya Pradesh Rural Road Development Authority and PWD
3,826 results • Best match
Construction and maintenance work of gram abbopur me purab ka pura link road (including 05 years maintenance)
Construction of a minor bridge at the Km 3 of Kharka link road (VR) in Jhansi district.
New Construction work of Aligarh-Ramghat Road km 36 to Dharmpur Rajwaha Patri Nauari-Bhojpur Link Road
Road improvement work from 08/10 to R-06/151 via Central Park in Ward-84 Rajnagar.
Road improvement and drain construction work by Dans in Ward-30 Swarnjayantipuram E-Block and SD-Block.
Annual Plan-83/2026-27--Idapparuthy thandakkudy road improvement ward 1, Varkala Municipality,400000/--General Civil Work
Tajganj Zone, Ward No. 14 Road improvement work using hot-mix from Tagore Public School to Bhimvatika.
L021-PMGSY ROAD NEAR NATHUAHAT BAPTIST CHURCH TO FATAKTARI MORE under Banarhat Block, PKG WB 10 231A
CONSTRUCTION OF LINK ROAD FROM BHOLENATH INTER COLLEGE IN GARGPUR TO MADWARA VIA SITARAM KUSHWAHA PURVA -INCLUDING 5 YEARS OF MAINTENANCE-
Construction of CC road from PMGSY road to H/O Vim Ghosh at Gopipur Village
Construction of Cement Concrete road from PMGSY road to Ashok Das house at Simulia (130128087)
Construction of Cement Concrete road from PMGSY road to Satrughna Bhunia house at Mirupur (130128750)
Construction of Cement Concrete road from PMGSY road to Bholanath Aditya house at Pratapchak (131456789)
CONSTRUCTION OF REPAIRING ROAD FROM KADIPUR PRY SCHOOL TO BHUERAH PMGSY ROAD UNDER SRIMPUR G.P
Construction of cement concrete road for community from Nahala rail gate towards Nahala PMGSY road
Construction of Lane with protecton bund from PMGSY road to latief Dar onwards at Jadden
CONSTRUCTION OF PRIMARY HEALTH CENTER INCLUDING 1 G AND 1 H TYPE QUARTER BOUNDARY WALLTUBE WELL AND APPROACH ROAD AT VILLAGE MUSHRAN PIPARIYA BLOCK GOTEGAON DIST NARSINGHPUR
Resurfacing of Various Roads under OWR / MMGSY / BK / 2026-27 / Package No. 25, Ta. Dhanera, (1) Charda to Goliya Approach Road, Km. 0/0 to 1/350
Resurfacing of Bhimrana Approach Road To Join SH Road (ODR) Km.0/000 to 1/150 Ta.Dwarka , Dist.: DevbhumiDwarka.(Under MMGSY-Khas Angbhut-2025-26) (Eighth Attempt)
Resurfacing and Strengthening of Dokva Talav to Navagam Joining Approach Road (VRNP) Km. 0/000 to 4/200 Ta.:- Shahera Dist.:- Panchmahal under MMGSY (NORMAL-2026-27)
CONSTRUCTION OF APPROACH ROAD, RCC DRAIN, LANDSCAPE DEVELOPMENT WORKS, VEHICULAR PARKING AND STREET LIGHT WORKS FOR VVIP GUEST HOUSE AT KAILASA, MUNIRABAD IN KOPPAL TALUK & KOPPAL DISTRICT.
Restoration of catch pit for existing Hume pipe culvert and check dams at Saledha Khadd across the approach road to Surge Shaft of NJHPS, Distt Shimla HP
Construction of Security wall Security Gate Security Hut and Approach Road and other Civil works at 220/33 KV 2x60 MVA GIS S/S UPSIDA Etmadpur, Agra.
Strengthening of approach road by CC road and providing 01 Nos Iron gate at 33/11 Kv S/s Purena premises Under city Division South CSPDCL Raipur.
Macadamization of Link Road from Foreshore Road up to Gh. Mohd. Dar Doodh Mohalla Shalimar and Link Road from Land of Haji Gh. Mohd. Dar up to L/O Irfan Ahmed Dar along with links at Doodh Mohalla Shalimar 1.50 kms.
ERATTAYAR GP 2026-27 ASHARIKKAVALA -PALLIKKAVALA -NORTH CHILAMBAN KUNNELPADY-KOODATHINKALPADY ROAD IMPROVEMENT -WARD 5 PROJECT NO 41/27
Patch repair of road by cold bitumen at different locations Industrial Area VKIA Jaipur
Repair of road between Km. 28.200 to 31.500 at left bank of Shergarh Dy.
IMPROVEMENT OF ROAD FROM HO DILIP PAUL TO HO BAKI DAS AT KHARPARA, URC MATH IN WARD NO 14 UNDER BAIDAYABATI MUNICIPALITY
IMPROVEMENT OF ROAD FROM HO PINTU SAHA TO HO BINOY GHOSH AT BORO FOOT ROAD IN WARD NO 20 UNDER BAIDAYABATI MUNICIPALITY
Improvement such as widening and strengthening of road from Sikarapai to Sirigumma from 0/000km to 12/311km in the District of Rayagada for the year 2026-27
Constr of post office building Sports Ground Buried Ground Internal roads with Drains and addl no of Anganwadi Community Building and Temple for displaced people at Rehabilitation Resettlement Colony Vill-Chhatarpura GP Dadha Teh- Atru, Distt-Baran
Construction of roads fromMrl14-Andheria Beurgram To Via -Nichna under Chandrakona I Block in the District of Paschim Medinipur (Road Length 10.990 km)
Construction of roads fromMrl03-Moyrakati To Chakparbati Via Lakhatapal under Garbeta I Block in the District of Paschim Medinipur (Road Length - 17.720 km)
Construction of roads fromT02-Birsinghpur To Beilaiboni Via Guaiadaha under Garbeta III Block in the District of Paschim Medinipur (Road Length - 19.540 km)
Construction of road from PMGSY road to Bissian Kanyan Dhub Lammipati Mandhar Haveli Poonch in Km 1st RD 0 to Km 3rd RD 500 by way of Earth Work in Cutting,Cross Drainage,Walling, Providing and Laying of 75mm thick WBM Grade-II,75mm thick WBM Grad
Construction of Internal Road Connectivity from NPAR Roundabout to Existing Internal Concrete Road at Kamarjar Port Limited, Ennore (T.N) (Package-I)
Construction of Internal Road Connectivity from NPAR Roundabout to Existing Internal Concrete Road at Kamarjar Port Limited, Ennore (T.N) (Package-I)
SPECIAL REPAIRS TO INTERNAL ROAD ME LINE OF OD TALEGAON TO JCOs/OR ACCN AT SHIVAJI ENCLAVE UNDER GE DEHU ROAD
LAYING OF 110mmHDPE PIPE LINE FROM SHRI DILSHAD HOUSE TO SHAMIM HOUSE AND LINK ROAD IN WARD 06
Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 6 of 20
Construction work of 2x(3.00x3.00) RCC box culvert in Km-4 of Chandrawari Danda to Bilgaon Link Road.
Construction of new Link road to the Gadroli Adiwasi Basavat From Lahrathkarpura Gram Panchayat, Babina Block, Jhansi district.
C/O LINK ROAD FROM MAIN ROAD TO HO AB RAZAQ GANIE AND OTHERS AT FURRAH BLOCK VESSU
Re-construction of 1 x 6.00 Mtr. Span Damaged Culvert on Chaubeypur Bela Road to Ojhan Link Road.
Construction work of Toll plaza to Bachchulal House to Shadipur Brahman basti Link Road (including 5-year maintenance)
Const. of Bisdhan Road to Village Batparu Link Road in Block Rasulabad. (C.C. Work Including 05 Years Maintenance)
New Construction of Badalpur tiraha to Bharasawa Link road (With Five year Maintenance as per attached SOP) (3)
New Construction of of Gopalpur Majare Ghanghhaul Link Road (With Five year Maintenance as per attached SOP) (7)
To run Pay and Park at GhatkoparMankhurd Link Road from Dumping Ground Signal to Baiganwadi Signal South side