Loading…
Loading…
3,811 live2,371 closing this weekmost from Madhya Pradesh Rural Road Development Authority and PWD
3,811 results • Best match
Development of brick soled road to CC Road from Mrinal Bhowmik house to NH-08 (Ghuramara bridge) - Kalinagar PMGSY road under Durganagar GP of Jirania Sub-Division,PWD(R and B) during the year 2026-27 SH Earthwork, sand filling, Protection work..
In Ward 02 Siddharth Bihar, street no. 04 Singh Saheb Wali Gali, from Joginder house to street no. 01 B Block, street no. 07 A/B Block Dr. Kamal Wali Gali, from Sanjay Pudiir house to Ankit house, road improvement work by interlocking tiles and drain
In Ward-39, Rakesh Marg Gali No. 03, construction of interlocking tiles and drain in Vishal Chowmein Wali Gali and Vishok Ji Wali Gali and road improvement work by Dans from house no. K/213 to Vishal Kirana Store (street in front of Baleshwar Nagar h
Construction of C.C. Road Work at Ranipura in Faruk Khan Shop to Vijay House. Zone No.13 Ward No.57. File No.459/26X3/6.
CONSTRUCTION OF C.C ROAD WORK NEAR ANGANBADI , ARUN TO NITYA GOUR , KUSHWAHA JI WALI GALI HANUMAN MANDIR AT PIPLIYA PENDE KHA WARD 57 ZONE 14
Renovation of U/G drain and P.C.C. Road work from Suresh kumar ji house to Jalal Miya ji house at Sabajpura in ward no-03.
Renovation of U/G drain and P.C.C. Road work from Raja Bazar Shambhu Updhaya ji house to Raj kumar ji house in ward no-04.
Annual Rate for Road Touching, Road Dressing and Construction Cement concrete road work Work in Dhrol Nagarpalika Various Area (Annual Rate : 2026-2027)(Second Call)
Special Repair of Road from Agroha Jandli road by providing BC in km 0.00 to 4.00 and DBM plus BC in km 4.00 to 10.70 in Hisar District. (Road ID 5150) (Work Programme 2026-27) (Uklana Constituency) (Without GST) (G-I)
Handling, Transport and Other Mining Services - Percentage quote based - Rate Contract for Ash Transportation to construction site of road projects of NHAI and other Central or State Government Road construction department/Authority/PMGSY Road Projec..
Supply of cold emulsion bitumen premix bag for repair of roads, potholes etc post monsoon at Bhatti Store in Ward No. 158, South Zone.
Supply of cold emulsion bitumen premix bag for repair of roads, potholes post monsoon at Lado Sarai Store in Ward No. 154, South Zone.
Repair of roads Plot no 2G S II GOV SCH to Plot no 80 GSII ward no-18 in Baranagar Municipality under Pathasree Urban
Construction and maintenance of road works
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACH ROAD ACROSS MALGER RIVER IN KM. 26/8 ON NAKULNAR PALNAR SAMELI JAGARGUNDA ROAD.
Emergent Repair and Restoration of Approach road damaged due to landslide connecting Shiv mandir dara to Samir rai house, Jitu Gaon, Mangerjung.
Construction Of High Level Bridge And Approach Road Across Hasdeo River Beside Damaged Gemon Bridge On Old N.H. At Distt. Janjgir-Champa.
Construction of Control room building alongwith boundary wall and approach road at 33/11 KV S/S Bakhusar under Bikaner Circle (JVV2627WSOB00394)
Construction of Control room building alongwith boundary wall and approach road at 33/11 KV S/S Mithriya under Bikaner Circle (JVV2627WSOB00393)
Construction of road from Kasaria more to Bhangabera pucca bridge. ( 0.00 to 6.00 K.M.) under Khejuri-II block in the District of Purba Medinipur (Road Length 5.810 km)
Construction of road from Saharbera to Anara Rail Station via Tara Ranjandih Dam Kashipur Rajbari Kalajor under Kashipur Block in the District of Purulia (Road Length 30.620 km)
CONSTRUCTION OF ROAD FORM SH 12A BHOGDABRI KESHARIBARI SHONI MONDIR TO H/O ASHIM ROY VIA ACHIMUDDIN AHAMMED, ALI HUSSAIN HOUSE AND MAHESHER DOKAN UNDER COOCHBEHAR-I BLOCK
Construction of Road from main Road Praise to Shamshan Ghat Anji Nallah ward no-02 pyt. Harotkote block Bhomag under capex(CDF MLA) for the year 2026-27
Construction of road jagatpuri A Block Gali no 1 From H.no A-22 to A-12 in Anarkali Wad no 208 AC-60 AC-60 Shah South zone
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Lada to Bameng 0.000 to 43.65 43.65 km on EPC mode
Civil Works cum Water Supply System
Repair of Road from Rohini Road to Kothi Dara
Repair of Road from Rangbhang Steel Bridge to Bungkulung
Repair of Road from Badamtam Recreation club to Shivagram
Repair of Road from Singla Road to Lepcha Busty
Repair of Road from Rinchington Hydle Project to Bansghari
Repair of Road from Pubong fatak to rambi khola
Repair of Road from Aasram Busty to Chandu Busty
Repair of Road from 4th Mile to mukti bridge
Repair of Road from Gielle Factory to Khadka Dhura
Repair of Road from Kainjalay Kolbong road to Meghaytar
Emergency Pothole Repair of Road namely Auldanga to Choutia
Construction of Road from Bongaon Village road to Janaligaon PMGSY road under Kachugaon Sub-Division (From Ch.0.00m to Ch.620.00m, Total Length 0.620 KM) by providing SDBC under SOPD in Kokrajhar District under BTC for the year 2026-27.
Parakkodu BP-Annual Plan - 2026-2027-Project no.192/27-Chala Maruthikkodu Road Construction in ward no.12 of Kodumon GP
SEWERAGE LINE AND DAMAR ROAD CONSTRUCTION WORK AT GANPATI NAGAR KHASRA NO. 240/1, NEAR MARUDHAR KESRI NAGAR SHOBHAWATO KI DHANI
Laying of remaining/incomplete sewerage lines and road construction work in various residential schemes of the Jodhpur Development Authority (North-East).
old sewerage line replacing and new sewer line fixing work and road construction work at various places of sardarpura assembly area
Parakkodu BPAnnual Plan-2026-2027-Project no.186/27- Mukalumpurathupadi Aneesh Padi Road Construction in ward no.1 of Pallikkal GP
Annual Plan-2025-26 Edavanna GP, , ReTender Project no-467/26 - Chalakkandi school road construction-in ward 2-General Civil Work
Road construction work through interlocking tiles and drain from Ramesh to Abdul Razzaq house in Ward 35 Akbarpur Bahrampur Buddha Vihar.
Road construction work by RCC drain and CC from Liaqat house to the graveyard in Ward No. 62, Moh. Abbas Nagar.
Road construction work by RCC drain and CC from Aladdin house to Hari Mazar in Ward No. 62, Mohalla Abbas Nagar.