Loading…
Loading…
10,890 results • Best match
Restoration of Rain Damages on Anni Sub-Division SH Removal of Slips and Landslides in Showad to Karana Road Km 0/00 to 15/600 Panei to Jaboo Road km 0/00 to 3/645 and Link road to village Ropa km 0/00 to 0/800 at Various Kms
Job 1 Construction of link road to Mohalla Naina and Rajputtan of Village Baliwal Tehsil Haroli Distt.Una H.P. km.0-0 to 1-465 Sub Head FC, filling, C.O Retaining wall at RD.0-345 to 0-375 and 0-490 to 0-585, 2Nos.2mtr RCC slab culvert at RD
Repair and maintenance of damages road and bridges (C/o link road Khaltu to Saroa to Jankhuni Km. 0/00 to 1/060) (Sub-head F/C work from RD 0/210 to 1/060 and C/o 900mm dia hume pipe culvert at RD 0/180 and 0/600)
Strengthening of link road Haripur Tohana to Rampurghat road 0/0 to 2/210. (SH Providing and Laying G.S.B. wet mix macadam, 50 mm thick B.M. 30 mm thick bitumenious concrete in km 0/0 to 1/510 and interlocking thick paver block in km 1/810 to 2/210
C.O LINK ROAD FROM LER TO THAN KM 0.0TO 1.750 SUB HEAD C.O R.WALL AT RD 1.0 TO 1.045 BOTH SIDE B.WALL AT RD 0.755 TO 0.780 C.O CV SHAE DRAIN AT RD 0.070 TO 0.150 AND P.L G-II GS-II ABD TARING IN KM 1.00 TO 1.300 UNDER OTMNP
Construction of link road from Davkhan Mod to Khwander Bhathan Bhajond km. 0/00 to 6/00 (SH Formation Cutting in km. 1/705 to 2/570 and C/O 900mm dia RCC hume pipe culvert at RD. 0/945 with wing wall in Random Rubble Masonry CM 1 6) Unde
Periodical renewal on link road from Km.8/500 of (T-02) to Phoolpur Shamshergarh road km. 0/0 to 1/435 (SH-P/L wearing G-III for filling pot holes for profile correction and 30mm. thick bituminous concrete in km. 0/0 to 1/435)(Under Special Incentive
CO and MT link road from Bhaderkali Pirthipur road to Harijan Basti Abheypur km 000 to 2000 SH C/O Retaining wall at RD 0495 to 0540 RHS and CO Breast wall at RD 0585 to 0640 and CO 900mm dia RCC Hume pipe culvert NP2 at RD 0490 under SCCP
C/O link road Mambal Ki Johri to katdu Chambe Ki bain G.P Diggal km 0/0 to 0/830 (SH C/O V-shape drain along with edge wall at RD 0/500 to 0/800 and Interlock tile at RD between 0/780 to 0/830) Under MNP
Co Link road village Thana km 000 to 1500 Sh Co Rwall in PCC 0310 to 0345 and Rwall wire crate at RD PL PCC 0320 to 0405 Rwall wire crate at RD 0690 to 07750800 to 0900950 to 100.1200 to 13001315 to 1330 and HPC at RD 1090 1105
C/o link road from Shivpur to Chamda km 0/00 to 3/960 (SH 5/7 mtr. Wide formation cutting in km. 3/405 to 3/960 and C/O 900mm dia RCC hume pipe culvert atRD.3/780 with wing wall in Random Rubble Masonry CM 1.6) Under SCSP
Job 1 Construction of link road Nagnoli to Harizan basti via Mohalla Brahmana, Gujran Chooti khad Tehsil Haroli Distt. Una km..0-0 to 3-345 Sub Head Providing and laying Retaining wall at RD. 2-895 to 3-055 and 3Nos. Hume Pipe Culvert at RD. 2-175, 2
Job 6 Periodical maintenance of Panjawar bathri road to Thakran road km. 1-0 to 3-0 Sub Head Patch work, 30mm thick bituminous concrete,zebra crossing in km. 1-0 to 3-0 VR0078 , Link road Una Jaijon road to Tobba Gulab Ana km.1-0 to 1-700
Annual Maintenance Plan for the year 2024 25 on Link road from Una Dhamandri Road to Vishna Nagar km 0000 to 2000 Mansoh to Kudu km. 0000 to 4000 Ambehra Dheeraj to Harot road km 4000 to 6000 and L R Una to Village Dangoli km 0000 to 1560 SH Provi
C.O LINK ROAD SAMNOLI TO VILLAGE NICHLA SWANA KM 0.0 TO 2.0 SUB EHAD C.O EMBANKMENT IN KM 1.795 TO 1.190 AND 1.265 TO 1.290 C.O R.WALL AT RD 1.210 RO 1.255 P.L 900MM HUME PIPE DIAPIPE CULVERT AT RD NP2 AT RD 0.570- 0.700 AND C.O SOLID CAUSEWAY AT
Job 1 Construction of link road from Shahtoot Bagh Khad Harizan Basti to National Highway Pandoga Tehsil Haroli Distt. Una HP Km. 0-0 to 2/600 Sub Head P.L CC Pavement at RD. 0-200 to 0-370, C.O Edge wall at RD. 0-620 to 0-670 Under OTMNP
Job 1 Balance work for the Construction of link road Old Satsang Ghar Lalehri to Bhai Lal Dass Temple via Master Purb Singh House Butt Khurd, Kamrota km. 0-0 to 6-170 Sub Head Formation and Laying GSB, WMM, BC, Cat eye , Sign Board, KM stone KM 5-55
C/o Link road to village Pahari Chikni G.P. Bowasni 0/0 to 3/500 (SH- F/C Km 0/0 to 1/500 and C/o 900mm dia RCC Hume Pipe Culvert at RD 0/060, 0/260, 0/690, 0/980, 1/160, 1/330 and 1/485).
Periodical maintenance on Chail to Ghayan road km. 0/00 to 1/800 and link road to village Kutechi in km 0/00 to 1/00 (SH Providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 0/500 to 1/800 and link
Job 1 Construction of link road to Bharwalan to Swan Nadi km. 0-0 to 1-500 Sub Head Formation cutting, Embankment, C.O 3mtr. RCC span culvert at RD. 0-030 and GSB, WMM, C.C Pavement in km. 0-0 to 0-085 and 0-490 to 0-550 Under OTMNP
Restoration of rain damages to link road from NH-707 to Chhachhetti Km. 0/0 to 14/250. (SH- Construction of RCC deck slab of existing 6.00 mtrs span RCC slab culvert at RD 3/280 alongwith toe wall and wing wall at RD 3/285 to 3/395) (R.H.S.)
Construction of link road from Gatta Pathar to Jhivar Basti Khera GP Patliyon km 0/0 to 1/765. (SH Construction of 5/7 mtrs wide road, providing and laying sub base, Base and 2 cm thick premix carpet surfacing in km 0/0 to 1/765) under NABARD RIDF
Construction of link road from Dhalwana to Kandi Km 0/0 to 1/225 ( SH- Construction from Jeepable standard 2.40 Mtrs to 5/7 Mtrs wide Km 0/0 to1/225,Construction of 2.0 Span RCC Slab culvert at RDs 0/065, 0/330 and 0/480 ,Construction of R/wal
C/O link road to Harijan Basti Polian Km 0/00 to 1/500 (SH P/L Paver block at RD 0/250 to 0/300, P/L CC pavement in extra width with RD 0/130 to 0/150 LHS, C/o R/wall RD 0/030to 0/040
Upgradation of link road Umrali Dhilwan Heeran Thara Pubowal to Polian via Kuthar Beet from Km 0/00 to 3/400 (SH FC, CD,P/L GSB,WMM,DBM,BC C/o CC pavement, U-shape drain, Parapets Km 0/0 to 3/400 and Road side furniture etc.) under OTMNP
Parking Gawas Temple at village Gawas raod S H C O 5 7 mtr wide formation cutting between km 4 000 to 4 060 and Repair and maintenance of link road from Bus Stand to Gawas Temple at Village Gawas km 0 000 to 0 350 providing and laying kharanja st
C o link road Bhamwari to Kolcha km 0 00 to 4 435SH C o B wall in wire crate at RD 0 720 to 0 760 0 635 to 0 675 0 170 to 0200 and 0240 to 0 260 Kharanja stone soling at RD 0 00 to 0500
C/O link road Diggal to odda km 0/0 to 2/00 (SH ROFD work at RD 0/800 to 1/800, 900mm dia HPC at RD 1/325 and1/610 and R/wall, B/wall at RD between 0/400 to 2/00) Under MNP 2020-307-744)
Job 2 Construction of link road Shiv Mandir to Malahat via Chattara Dhesi Mohalla to Majra Una Aghar road to Ward No. Mohalla Bharamana to Hardan Wala Bag Lower Arniala Una Sub Head C.O Embankment at RD 0-0 to 0-300, Retaining Wall at RD 0-0 to 0-100
Const of link road from Gindpur Maloun to Tappa Sidh road km 000 to 2500 SH Formation cutting including filling between km 0500 to 2000 900mm dia RCC hume pipe culvert at RD 0290 and 0/480 and Const of 3 mtr span RCC slab culvert at RD 0120 under M
Job 9 Construction of Link road Lawana Basti Ispur to Dera Baba Damiyan GP Ispur Tehsil Haroli Distt. Una km. 0-0 to 4-100 Sub Head C.O Hume pipe culvert 900 mm dia NP2 at RD. 1-300 and Retaining wall at RD. 1-315 to 1-335 Under OTMNP
Job 2 Construction of Link road Lawana Basti Ispur to Dera Baba Bharthri Damiyan G.P. Ispur Tehsil Haroli Distt. Una Km. 0-0 to 4-200 Sub Head Formation cutting. Filling, P-L GSB, in RD. 1-800 to 3-015 and 5 Nos. Hume pipe culvert at various RD. Unde
Construction of link road from Laa Devi Temple to Giri Basti Rajban km.0/0 to 1/450 (SH-C/O 5/7 mtrs.wide road,C/O cross drainage works,P/L G-I and C/O V-shape side drain in km.0/795 to 1/450).under MNP
Periodical Renewal for the year 2024-25 on Link road Andora to Mubarikpur, (SH. Providing and laying 25mm thick Bituminous Concrete in Km. 0/0 to 1/0, 1/0 to 2/0, 2/0 to 2/300, 2/370 to 3/0 and 3/0 to 4/0) VR0108
C.O LINK ROAD FROM SEHRI TO JAWAS BEHAR KM 0.0 TO 2.00 SUB HEAD 5.7 METER WIDE FORMATION CUTTING IN 0.0 TO 0.510 C.O R.WALL AT RD 0.265 TO 0.295 0.320 TO 0.355 0.395 TO 0.430 AND 0.435 TO 0.450 AND C.O HUME PIPE CULVERT ATR RD 0.352 DEPOSIT WORK
Const of link road Harijan Basti to Naian from Chowkimaniar Soahri Takoli km 000 to 1000 SH Const of 600mm dia hume pipe culvert at RD 0835 and 0/997 PL paver block between RD 0790 to 0840 and Const of Breast wall at RD 0650 to 0725 ic Ushape drain
Balance work of Landslide mitigation measures for prevehahitiation of land slide disaster on link road from Ghumarwin Seer Khad Bridge to Nalwari Mela Ground Ghumarwin in km 0/00 to 0/400 SH C/o of Retaining wall at RD 0/178 to 0/213,C/o U-shape dr
Annual Maintenance Plan on link road to ward No. 3 Patta road km 0/00 to 0/500 village road AND Sannour to Patta road via Karyalag Nagroun and Harizan Basti Churan Gugga Temple road km 0/00 to 6/00 village road for the year 2026-27 SH Providing an
C/o link road from Baliana Lamber Basti to Suked Km. 0/0 to 2/0 (SH cement concrete pavement in Km. 0/0 to 0/060, retaining wall at RD. 0/005 to 0/060 and providing and laying premix carpet in Km. 0/510 to 0/710) under MMSY.
Job 1 Construction of link road Village Bhadouri to Lower Bhadouri via Harijan basti km. 0-0 to 2-0 Sub Head Construction of 2 mtr. RCC slab culvert at RD. 0-450, Construction of 900mm dia Hume pipe culvert at RD.0-390,0-640 and 0-900 and Retainin
Periodical renewal on link road to village Kanshipur km 0/0 to 0/900 (SH Providing and laying G-III for repair to pot holes, 30 mm thick bituminous concrete,and P/L kilometrage stone in km 0/0 to 0/900 ) under AMP for the year 2020-21 HP1001VR
Co link road from Tegla to Bangsar km 0 00 to 4 700 SH C O R R Stone Masonary km RD 0 1402 to 0 200 HPC 900mm Dia I c winig wall in PCC 1 3 6 Both side at RD 0 00 2 227 0 600 0 850
Balance work Upgradation of link road Umrali Heeran Thara Pubowal to Polian via Kuthar Beet Km 0/0 to 10/300 SH P/L GSB, WMM, DBM and BC, C/o U-shape drain, R/wall, P/F road side furniture, cat eye, delineator and P/L thermoplastic paint, sign board
Improvement and metalling Gharoti Falahi link road to Machyana Bass road in km 0/0 to 1/00 (SH C/O wing wall exesting slab culvert at RD 0/220, P/L GSB Gr-I and 80mm thick Interlocking tile in km 0/220 to 0/330) Under MMGSY.2nd call
Job 1 Construction of Rampur Gas Agency Godown to Una bridge near IPH Rest house via TCP office and Village Kuthar Khurd to Kuthar Kalan road km. 0-0 to 7-215. Sub Head C.O U shape drain on link road to Village Kuthar khurd Kuthar Kalan from Una San
Restoration of damages due to laying of pipeline on link road from Chhughera Sadoon Kandi road in Distt Kangra (HP) (Deposit work) (SH-Construction of retaining wall in Km 6/730 to 6/745, 7/745 to 7/090, 7/790 to 8/000 and 10/150 to 10/160).
R M Link road to Shamshanghat of Beri Brahmna in GP Bhukkar Tehsil Bhoranj Distt Hamirpur HP SH CO CC pavement at RD 0110 to 0215 R/wall at RD 0110 to 0120 and edging at RD 0 020 to 0 110 HPC 450 dia at RD 0/110 Deposit Work
Providing and Laying WBM G-III , Prime Coat ,Tack Coat and Mix Seal surface with waste plastic
Routine maintenance of Timbi Millah road Km 0/0 to 5/0, Shillai Pashmi Bali Koti road Km 4/0 to 6/0, Shillai Naya Kandi Sundrari road Km 0/0 to 7/0 and link road to village Shillai in Km 0/0 to 1/0 under PBMC year 2020-21
road work