Loading…
Loading…
10,901 results • Best match
P/L CEMENT CONCRETE PAVEMENT FROM RD. 0/400 TO 0/860) (DEPOSIT WORK).
C/O R/wall at rd. 3/570 to 3/590, 3/640 to 3/670,7/300 to 7/330 ,6/405 to 6/430 ) (Actual R/wall at Rd 3/700 to 3/730, 6/400 to 6/430,0/600 to 0/610,B/wall at Rd. 3/590 to 3/615, 3/660 to 3/685 and P/L 1ratio 3 ratio6 at various Rds (Under PDNA)
SH Construction of U-Shape Drain in Km. 4/000 to 4/850) (Under RRD Head
C/O Retaining wall.
C/O 3.00 mtr span RCC culvert at Rd 0/180)
SH construction of Road No 7 Near House No 20 to 17
SH construction of road with toe walls and development of plots site
Please Refer Uploaded document
Formation cutting 5 to 7 metr wide in km 0.00 to 1.00
Please Refer Uploaded document
C/O C.C.R/wall in internal Coloney road from RD. 0/540 to 0/600 and 0/618 to 0/673)( under Parimahal section).
Formation cutting and C/O formation cutting and C/O Retaining wall).
C/o 39.50 mtr. Long Span (2 Span of 19.75 mtr. each) RCC Girder Bridge including Both Side Approaches) under PMGSY-III (Batch-1)
Sh- Providing Renewal coat of 30 mm thick bituminious concrete at km 6/00 to 8/00 ) under AMP PMGSY for FY 2022-23
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
Providing and Laying bituminous concrete 25 mm thick in Km 1/00 to 2/00) with paver finisher) DRRP No.HP03-03 VR0010 (under PMGSY)
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
Improvement of road, R/walls, C.D. work, GSB, WBM-II, WBM-III, Tarring work,BM, CC pavement, Side Drain,parapets and road furniture ic five year routine maintenance) (under NABARD RIDF-XXXI)
(Package No.- HP-03-168) (Package No.- HP-03-169) (Package No.- HP-03-170) (Package No.- HP-03-4565)
C/o of link road Khad Samethan Neem Wala Baba Mandir to Harizen Basti Chokta Km 0/0 to 3/0 (SH-C/o F/C in Km 2/0 to 6/0,E/W filling,C/o R/wall at RD 2/130 to 2/145,2/219 to 2/229, 2/290 to 2/305, 2/325 to 2/350,C/o 900mm dia HPC at RD 2/063 to 2/233)
R R damages on link road Bagi to Khabbal road km RD 0 0 to 10 00 SH C O W Wall of CD at RD 6 985 6 992 Catchpit of CD at RD 6 994 B Wall at RD 6 985 8 00 R Wall at RD 6 495 6 510 C O R Wall in R R stone Masonary cm 1 6 at RD 6 510 6 520 9
C/o M/able link road from Mindhal to Kulal road Km 0/0 to 6/500 Sub Head Formation cutting from Km 0/294 to 0/915 1/015 to 1/140 and 1/197 to 1/250 C/o B/Wall at RD 0/915 to 0/940 and C/o R/Wall at RD 1/010 to 0/015 1/054 to 1/087 1/097 to 1/116 and
C/o Link Road Bhalsi km 0/00 to 2/00 (SH C/O NP2 Pipe 600 MM dia HPC at Rd 0/980,V Shape Drain at Rd 1/00 to 1/300 R/Wall Rd 1/410 to 1/420 and G-I,G-II at rd 0/700 to 0/800 and 1/00 to 1/400,interlocking Tile 1/100 to 1/200)(under DMFT/PMKKKY)PMK/20
R R Damages on Link road to village Dhanoti km 0 00 to 3 00SH C O R wall at Rd 2 115 to 2 130 2 195 to 2 210 1 870 to 1 905 B wall at Rd1 830to 1 850 1 940 to 1 970 1 750 to 1 765 R wall in wire crate at Rd2 800 to 2 855 2 280 to 2 300 2 595 to 2 605
R/R damages (PDNA) on link road from NH-22 to Nesang Km. 0/00 to 10/700 (SH- C/O R/wall in PCC at RD. 3/190 to 3/205, 3/220 to 3/235, 3/580 to 3/587, 4/915 to 4/932, 5/165 to 5/180, 5/220 to 5/260, 8/640 to 8/660, 8/885 to 8/895 and 9/280 to 9
SH- Providing and laying 25mm thick Bitumens concrete laying with paver finisher and hot applied thermoplastic compound in km 1/000 to 1/500
Construction of road from Sapri Veterinary Dispensary to Shiv Dev, Kewal etc house in GP Hadwal km 0.0 to 0.400 SH Construction of Wire crate at RD 0.135 to 0.155, 0.275 to 0.290 and cc work at RD 0.0 to 0.123 and 0.130 to 0.230 under MMSY
SH FC R Wall B Wall CD MT precast concrete paver block RCC drain parapets and road furniture including five year maintenance.
SH- P/L 25 MM Thick BC laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 1/00, 1/00 to 2/00 and 2/00 to 2/500)
Initial rectification, periodic renewal and routine maintenance for five years
SH-Providing and Laying 30mm thick Bituminous concrete laying with paver finisher in km 0/000 to 1/000
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 2/140
SH Providing and laying renewal coat by providing Bituminous concrete in Km 4/0 to 7/0 including road marking
SH. Providing and laying 25 mm thick Bituminous Concrete in Km 0/0 to 2/500 Including 5 year Post DLP)
SH Providing and laying renewal coat using 25mm thick bituminious concrete surfacing in KM 0/0 to 4/650 and five years Routine maintenance in KM 0/0 to 4/650.
Providing and laying renewal coat using 25 mm thick BC in KM.0/00 to 2/00 and 2.5mm thick (10cm wide) Thermoplastic paint i/c 5 years routine Maintenance
(SH Providing and Laying tack coat 25mm bituminous concrete Hot applied thermoplastic and Routine Maintenance for five years after completion of Periodical Renewal)
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 2/000
Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplastic strip in Km 0/0 to 1/0, 1/0 to 2/0 and 2/0 to 3/0
Initial Rectification before Periodic Renewal Between Per kilometer 0/00-5/700 )Repair of Pot holes and Side Drain , Periodical Renewal Per kilometer 0/00-5/700 and Post Maintenace After Periodical Renewal Per kilometer 0/00-5/700)
Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete in Km. 0/00 to 3/200)
SH- Providing and Laying renewal coat using 25mm thick Bituminous Concrete in Km 0/00 to 7/670 and 2.5 mm thick (10cm wide)thermoplastic paint i/c five year routine maintenance
Providing laying renewal coat using 25mm thick (10cm wide) thermoplastic paint i/c 5year maintenance
Removal of formation deficiencies C/o passing places, Missing CDs Side drains, parapets CC pavement, interlocking paver blocks and tarring work
Providing and laying 30 mm thick bituminous concrete in km. 5/00 to 6/00, 6/00 to 7/00
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 3/0 to 4/0 and 4/0 to 5/0
Providing and laying bituminious concrete in km 3/0 to 4/00
ROFD protection work cross drainage works GSB G II G III DBM BC paver block road furniture and dumping site