Loading…
Loading…
10,907 results • Best match
Formation Cutting, R/Wall and B/Wall, Cross Drainage work, , Providing essential Stone soling, road side unlined drain, Essential Parapets,Dumping Structure and P/F sign board, Km Stone etc. in Km 0/0 to 6/0 UNDER NABARD
Construction of 900 mm dia RCC hume pipe culvert at Km. 4/507 and providing and laying cement concrete pavement in Km. 4/450 to 4/550
SH- Formation Cutting 5/7 mtr Wide road in km 0/00 to 1/00 Construction of wire crate for dumping site in km 0/00 to 1/00 in various RDs
Construction of 900 mm dia RCC hume pipe culvert at Km. 4/507 and providing and laying cement concrete pavement in Km. 4/450 to 4/550
Providing and laying G-I and G-II in between Rd. 0/00 to 1/600
SH- ROFD in Km. 3/045 to 3/510
Providing and Laying G-I,G-II in extended protion and 25mm thick bituminous concrete in km. 0/00 to 0/900
C/O RCC Retaining wall in back side of Block -4 under Police colony section
P/L G-I,G-II and Mettaling and Tarring of road in km. 0/00 to 0/180, 1/00 to 2/345
Providing and erection of Ornamental Public Gozebo rain shelter at Rd 3/090 Location (Khanouli)
P/L 80 mm thick cement concrete paver blocks.
SH 5/7 MTR F/C BETWEEN KM 0/300 TO 0/690 ,P/L KHARANJA STONE SOLING AT VARIOUS SLUSHY REACHES BETWEEN KM 0/00 TO 0/300 AND C/O B/WALL AT RD 0/137 TO 0/150 AND WIRE CRATE WALL AT RD 0/045 To 0/065
Formation cutting , C/o R/wall, B/wall, CD work, U and V-Shape drain, Parapets and P/L GSB, WMM and Premix carpet with seal coat in km. 1/500 to 2/500) Under NABARD RIDF-XXVI
Construction of Balance work of 53.41 Metre span bridge over Naad khad at RD. 0/257
FC, R/walls, CD work, GSB, WBM- II, III , Tarring work, C.C Pavement side drain , parapets and road furniture i/c 2 No. 15.25 mtr Span each RCC T- beam bridge Ghurlu Nallah at R.D. 0/200,0/240 i/c five year Routine Mtc) under Nabard RIDF- XXVIII
P/L Cement concrete pavement and V-shape drain at Rd 2/800 to 2/905.50) (Deposit work)
SH 14 05 meter span 2 Spans of 7 025 meter each RCC Box cell Bridge Under SCSP
SH P L Interlocking tiles in km 0 00 to 0 225
C/o, R/Wall at R.D. 1/645 to 1/659
Construction of 11 Nos. new HPC culverts at km 1/450, 1/600, 2/660, 2/900, 3/080, 3/340, 3/620, 3/990, 5/140, 5/490 and 5/600 along with wing walls
Formation cutting in Km. 1/390 to 1/735).
P/L Hume pipe culvert and cement concrete pavement (Deposit)
Patch work of 20mm thick mix seal surfacing at various location
Formation cutting , C/o R/wall, B/wall, CD work, U and V-Shape drain, Parapets and P/L GSB, WMM and Premix carpet with seal coat in km. 3/855 to 5/640) Under NABARD RIDF-XXVI
(SH- P/L 25mm thick Bituminous Concrete with Paver finisher in km. 1/000 to 2/000)
Formation cutting , C/o R/wall, B/wall, CD work, U and V-Shape drain, Parapets and P/L GSB, WMM and Premix carpet with seal coat in km. 5/640 to 6/615) Under NABARD RIDF-XXVI
Sub Head - Providing and laying interlocking paver Block between km 0/00 to 0/070 Deposit Work
P/L 30 mm thick B.C. 2.5 mm in Km.0/0 to 2/690 HP0302VR0070
C/o Cement concrete Pavement at RD 0/320 to 0/472). Under MMGSY
P/l 30mm. thick bituminous concrete in Km. 0/00 to 1/00
SH CO CC pavement BWall and Ushape drain etc in km 0000 to 0200 Under SCSP
P/L GSB and Interlocking Paver Block Pavement and R/Wall in km. 0/185 to 0/435
(SH - C/O Passing place, R/Wall, Cross Drainage work, GSB, WBM-II, WBM-III Tarring work, Cement concrete pavement, side drain and parapets)
Extra layer for surface coection at various damaged portions
Formation cutting,Passing places, R/walls, Cross Drainage work, P/L GSB, WBM-II, Tarring work, C.C.Pavement, C/o road side drain and Parapets etc. In Km. 0/0 to 2/457) .( Under Nabard RIDF-XXVI )
Providing and laying 30 mm thick bituminous concrete on Kharkoli to Rajana road in Km. 1/0 to 3/0 2.000 Kms and Danoi to Kotion road in km. 0/0 to 1/000 1.000Km and Renuka Sataun road in km. 12/0 to 13/450 1.450 Kms and Plastic road in km. 1
Providing and laying 80mm thick paver block at RD 1/110 to 1/191)
P/L 30mm thick bituminous concrete in kms 0/0 to 0/350 and 0/390 to 1/300, 1/340 to 2/0 including 80mm thick ISI marked paver block in kms 0/350 to 0/390, 1/300 to 1/340 along with U-shape drain
Construction of PCC R/wall at RD 0/0 to 0/07) VKV/2024/1739
C/O of PCC R/Walls at Rd 4/200 to 4/215
SH. Construction of 40.00 Mtr, Span PSC Box Grider Bridge at RD 1/076 and Formation cutting, Passing Places, R/Wall, Cross Drainage Work, GSB, WBM-II, WBM-III, Tarring Work, Side Drain and Parapets in Km 0/0 to 2/500) including five year Routine Main
SH Providing and laying cement concrete pavement length 22.50mtr
P/L bituminous concrete 30mm thick in km. 0/0 to 1/0 and 2/0 to 3/0) (DRRP NO. HP-03-03VR0068) Under PMGSY (With paver finisher)
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19) Package No. HP-04-395
C/O passing places missing CD side drain parapets CC pavement and Tarring work including five year maintenance under PMGSY Batch I 2018 19 Package No HP 04 373
Improvement, C/o Passing Places, Missing CD, Side Drain, Parapets, Crash Barrier, CC Pavement and Tarring work under PMGSY-II, Batch - I, 2019-20 Package No. HP-02-07
Up gradation of Nathan to Jana road Km 0/0 to 10/700 in district Kullu HP including 5 year routine maintenance under PMGSY-III Batch-I 2022-23