Loading…
Loading…
10,906 results • Best match
SH Providing and laying bituminous 25mm thick in km 0 00 to 1 600 with paver finisher Addl KM under PMGSY Incentive 2024 25 with five year maintenance
SH P/L Bituminous Concrete 30 mm thick in km. 0/0 to 1/300 with paver finisher). DRRP No. HP-03-05 VR0001 and VR0120 PMGSY incentive)
Routine maintenance for five years km. 0/0 to 8/0) Package No. HP-03-149 Under PMGSY-II batch,1, 2019-2020 Under RRP II AF-G
Formation Cutting, Protection works, Cross- Drainage works,Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc. under PMGSY Pahse III Batch I
Improvement, C/o passing places, missing CD, Side Drain, Parapats,Cement concrete pavement and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-781.
Formation cutting, C/o passing place, Side Drain, Parapats, Cross Drainage, Metalling a and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-791.
Formation cutting protection work, cross drainage, parapets kilometer stones and dumping sites etc.including five year maintenance Package No HP 11 180 under PMGSY III batch 1 2023-24
Formation Cutting, Protection works, Cross- Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc. under PMGSY Phase-IIi, Batch-II
Formation Cutting Protection works Cross Drainage works Metalling Tarring Road side Drains Crash Barrier Parapets Km stone Dumping Sites etc
Construction of road from Kasba Kotla to Koi road Km. 0/0 to 2/600 (SH. Providing and laying 80mm thick interlocking paver block Grade-40 at RD 1/350 to 1/450, 1/515 to 1/745, 1/900 to 2/0 and Construction of 900mm dia Hume Pipe culvert at RD 2/340
Improvement of Road, Passing Places, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII).
Improvement of Road, Passing Places, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII
Providing and laying Tack coat and Bituminous Concrete
P/L hume pipe culverts, C/O R/Walls , B/Walls interlocking pavers and PCC drain on various roads). (Under PDNA).
Providing and laying GSB,WMM and metaling and tarring works on various roads) (Under PDNA
Providing and laying BUSG for correction layer, bituminous concrete in km3-0 to 5-0 providing and laying hot applied thermoplastic edge line and construction of PCC Hill side drain
Providing and laying 25mm thick Bituminous concrete and thermoplastic paint in K.M. 4/0 to 5/0 and 6/0 to 7/0
Providing and laying 30mm thick Bituminous concrete in Km 0/00 to 2/510 2.510 Kms
Initial rectification Periodic Renewal and routine maintenance for five years
Providing and laying bituminous concrete in Km. 0/0 to 2/0)
P/L built-up-spray grout, Tack coat, Bituminous concrete 25mm thick and thermoplastic strip const.of earthen shoulders, unlined surface drains, 600mm dia pipe, road marking in Km 0/0 to 11/510 and five year routine maintenance in Km 0/0 to 11/510
Providing and laying 30mm thick Bituminous concrete with paver finisher in Km. 0/00 to 1/00
Providing and laying BUSG for correction layer, Bituminous concrete in Km.0-0 to 2-0 and construction of PCC Hill side drain
Providing and laying 30 mm thick bituminous concrete in km. 0/00 to 1/00 and 1/00 to 2/00
Providing and laying 25mm thick bituminious concrete in KM 1/0 to 4/0.
(SH Providing and Laying 30 mm thick Bituminous Concrete and Hot Thermoplast line in km. 0/0 to 2/0, 5/0 to 7/0 and 10/0 to 14/0) 8.00 km)
SH Metalling Tarring PCC V-Shape Drain PCC Parapets Unlined drain and Five Year Routine Maintenance
SH FC R wall B wall CD MT precast concrete pave block RCC drain parapets and road furniture i.c. five year maintenance.
SH RODF, Protection work, Cross Drainage work, road side drain, M/T dumping site and road furniture Package No.HP-06-192.
SH ROFD, C/O passing places, side drain, Parapets, CD works, and M/T including five year routine maintenance Package No.HP-06-203.
SH RODF, C/O passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-205.
SH F/C, C/O Passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-186.
SH C/O ROFD, Protection work, Cross Drainage work, M/T, Road side Drain, Crash Barrier, Parapets, Road furniture, Dumping site Package No.HP-06-177.
SH C/O ROFD, Protection work, Cross Drainage works, Metalling and Tarring, Road Side Drain, Crash Barrier, Parapets, Road furniture, Dumping site in Km. 0/0 to 2/600 Package No. HP-06-176.
SH RODF, R/walls, B/walls, Gabion walls, Cross Drain Crash Barrier, Citizen information Board, Logo Board, KM stone and 200 Metre stone and five years routine maintenance Package No.HP-06-202.
SH ROFD, Passing Places, Side Drain, Parapets, CD works and M/T including five years Routine Maintenance Package No.HP-06-212.
SH ROFD, C/O, Passing Places, Side Drain, Parapets, Cross drainage works and M/T including five years Routine Maintenance Package No.HP-06-211.
SH ROFD, Protection work, M/T, Cross Drainage work, Road side Drain, Crash Barrier, Parapets, Road furniture, Bio Engineering, Dumping site Package No.HP-06-174.
SH F/C, M/T, R/walls, B/walls, CD works, Drain, Crash Barrier and Parapets, etc. Package No.HP-06-169.
SH ROFD, C/O passing places, side drain, Parapets, CD works and M/T including five years routine maintenance Package No.HP-06-209.
SH F/C, M/T, R/walls, B/walls, CD works, Drain, Crash Barrier and Parapets etc. Package No.HP-06-170.
(SH - Providing and laying 20 mm Premix carpet, WBM-III for correction layer and thermoplastic for road marking in Km. 7/00 to 9/00)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 5/00 to 6/00 , 6/00 to 7/00 and 7/00 to 8/00
Improvement and Widening Old Kasumpti Junga road Km 0/00 to 1/540 and link road from Old Kasumpti Junga road to Shoghi Mehli Junga road from 0/00 to 0/156
SH P/L 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat, Tack coat and thermoplastic layer on VR Road. Link road Amroh to Jhaniara km 0/0 to 1/0
Construction of link road from Bus Stand Dhanser to Mandir G.P Jhalta km 0/00 to 0/467 SH F/C 5/7 mtr wide road km 0/00 to 0/090
SH- C/o B/wall in Km. 0/0 to 0/039 0/045 to 0/084 0/085 to 0/105
Construction of Breast wall at R.D. 0/105 to 0/120 and Retaining wall at RD 0/565 to 0/580
Formation Cutting, R/Wall and B/Wall, Cross Drainage work, , Providing essential Stone soling, road side unlined drain, Essential Parapets,Dumping Structure and P/F sign board, Km Stone etc. in Km 0/0 to 6/0 UNDER NABARD