Loading…
Loading…
19,136 results • Best match
C/o lane with drain R wall near pmgsy road to H/o haji chatoo kalas at check nasserpora Block Keller
C/O B PATH FROM PMGSY ROAD TO MASJID SHAREEF NADDI WALA WARD NO 07, JABLA BLOCK PARANPILLAN UNDER ADP PRI
Construction of link road to Tia Pharka by way of E/W and 01 mts RCC culvert km 3rd to 4th from RD 2750-4000mtr.(Under plan)
Please refer in BOQ
Construction Testing successful commissioning by way of laying and fitting of pipes ,Construction of 0.50 Lac gallons capacity RCC OHT Construction of Approach path Construction of Approach road to OHT Construction of Sluice Chamber Constructio
Restoration of of road from Approach road at fazalabad bridge Surankote by way of P/L WBM GR-II,GR-IIII and 25 mm thick Semidance with 6 mm thick seal coat in patches stretches
Permanent Restoration of Road by way of Providing and Laying of T-Wire Crates and Removal of Slips at approach Road from Gundla School and allied Links, Jammu Damaged on 26 to 30 August 2025.
Construction of Sluice chamber, Construction of chain-link fencing around structures, Construction of paths and levelling of premises, Construction of approach road and Stabilization of old pipe network for water supply scheme Chackpath (under NABAR
Construction Including Successful Testing and Commissioning of laying and Fititng of pipes, , 0.50 Lac Gallons S.R, 2 No.Sluice Chamber/Washout Chamber , Provision for Road cuts Restoration charges, cost for the Construction of approach road, and
Construction of approach road to motarable bridge taranwali makhuwala loran By way of balance earth work in cutting 900mm dia HP CULVERT walling and WBM GR-II IN KM 1ST RD 0KM 2ND RD 400.
Construction Including Successful Testing and Commissioning of laying and Fititng of pipes, , 0.20 Lac Gallons S.R, 2 No. SluiceChamber/Washout Chamber , Provision for Road cuts Restoration charges, cost for the Construction of approach road, and
Construction Including Successful Testing and Commissioning of laying and Fititng of pipes, , 0.30 Lac Gallons S.R,Sluice Chamber,/Washout Chamber , Provision for Road cuts Restoration charges, cost for the Construction of approach road, and C
Repair and recarpeting of approach road between Botanical Garden Turning on Raj Bhawan to E-Coy / Taz HQ 60 BN BSF New Hut location by way of 50mm BM, 25mm SDBC and 6mm seal coat.
Construction of 5.00 Lakh Gallons Underground Reinforced Cement Concrete (RCC) Service Reservoir at Wayan, 2 No. Sluice Chambers, Chain Link Fencing Around Structures and Approach Road for 100percent FHTC under JJM for WSS Regional Kupwara
Construction of 45 mtr span Prestressed concrete Bridge on Rathua road over Rathua Nallah in Km 4th RD 775 to 825 from chuchu Da Amb by way of Approach Road and Approach walls Both side.
CO LINING WALL ROAD SIDE FROM LO LT ALI SB AND OTHERS AND IMPROVEMENT OF ROAD WITH LINING WALL LO MOHD SULTAN AND OTHERS AT WATRINA AT BLOCK BANDIPORA
Improvement of road from Owami Pond to Sailera Mohalla via Shiv Temple to main road Janipur Amb Gharota road Ward No. 03 Under City and Town Programme 2022-23
Improvement of road from the H/o Ghara ram to onwards at Dhindey khurd W.no.8 Pyt. Harsa Dabber Block Bishnah year 2023-24 Scheme PRI Scheme(PYT. LEVEL)
Improvement of road from Swami Pond to Sailera Mohalla via Shiv Temple to main road Janipur Amb Gharota road Ward No. 03 Under City and Town Programme 2022-23
Improvement of road surface by way of laying 20mm thick premix carpet in lane no. 6-2 Block-B and left side sub lane Block A Roop Nagar Encalve
PROVN OF IMPROVEMENT OF ROAD AND PAVED AREA EXISTING INFRASTRUCTURE, RETAINING WALL AND VEHICLE PARKING AREA IN FRONT OF REZANGLA GATE AT HQ NORTHERN COMD UNDER GE (SOUTH) UDHAMPUR
Improvement of road Budhal Mahore Gul from Km 22.720 to km 62.940 Net length 29.080Km Package II to NHDL specification under project Sampark in UT of J and K
Construction of road from Rk road to Danna Bandian 2 nd Call
Construction/widening of road from Jhulas Bhera to Laxman Pani in Km.3rd. RD 0-350 mts. Km 4rt. And 5th. RD 0-650 by way of balance earth work in cutting and P/L 75 mm thick of WBM G-III
Constt. Of Lane Drain from link road to Moh. Ganesh Dass at vill. Rattanpur , Pyt. Ratwana Block Ghagwal under Scheme PRI Year 2024-25
Filling of RBM with edge wall on T/road from link road towards Mohalla Ayub Khan ward No. 3 Pyt Amwalla Block Nagrota Gujroo
Construction of link road from Firing Range Ground via Radha Krishan Mandir to Mohalla Ranjeet Singh In km 1st RD 0 1000 under ARD
Constt. Of L/d from link road to H/o Kamal Singh, Prem Singh and others w.no 05 BroAndoi Pyt. Hote Block Keerian Gandyal
Construction of link road from H/o Bhishan Singh to H/o Sham lal Ward No.1 near Peer Baba village Keeri Block Mathwar
Construction of Link Road alongwith culvert(Hume Pipe Culvert)from main Road to Mohalla Noor Hussain PYT Meen Sarkar Block Bari Brahmana District Samba
Construction of lane/drain from link road to mohulla Salarian and Brahmna, pyt. Baran block Bhalwal (UNDER P.R.I CAPEX BUDGET 2023-24) (Pyt Level)
Construction of Pacca Path Lane and Drain at Mohalla Fakot fro Link road to the House of Kamla Devi and others Pyt Mangloor East
epair of link road from Old Bus Stand towards city Chowk court complex and Zaba Khana Morh Part II under Distraict Plan MC Rajouri
Construction of link road at Ward No. 5 and 7 behind SBI Jourian ( Under Municipal Committee Jourian UT-Capex Scheme 2024-25) (Ist Call)
Construction of link road from main road Chandak to Mohalla Kangrati via Mohalla Sardara by way of Earth Work in Cutting,Cross Drainage,Walling
Construction of Link road by way of Earth Work in Cutting on Kalsan to Doom Khanater in Km 1st RD 0-100,Block Poonch
TILE WORKS STARTING ENTRY TO LINK ROAD DANGA BABRAL Pyt Keso Manhasan Block Ramgarh District Samba under Scheme DDC CAPEXfor the year 2023-24.
Constt. Of lane drain link road to Paras Ram House Pyt Abtal Block Ramgarh District Samba under Scheme Capex Budget DDC Year 2022-23
Constt of Lane Drain from H/o Sandeep Kumar and Mohalla Kumerian and culvert Vinod kumar and from link road to AWC under B2V3
Restoration and maintanance of road from Jarra Wali Gali to Draba via.Khaitan and Jarra Wali Gali to Moosawala Nakka Sanai link road Surankote Poonch
Providing and laying of WBM Grade-II (Shingling) in patches / stretches on link road Jinder Khurd and Radha Swami Ashram to Petrol Pump road
Construction upgd. macadamization of link road from Bishan Singh to the house of Sham Lal near Peer Baba Ward No. 01 village Keri Block
Construction of Lane / Drain from link road to Primary School Fattu Kotli w no .07 under PRI capex budget for the year 2022-23 .
Day to day Maintenance /General Upkeeping of Internal link road of Bhalwal Brahmana for the financial year 2025-26. Under Non Plan (2ND Call)
Permanent Restoration for Construction of link road from Warni to Sarsi via Sharee Km 6th to 10th upto village Kalaya Phase-II RIDF-XXII.
Construction of Lane from Link Road to mohalla Saiad Ali and others w.no 8, Bhagani Block Mathwar. Under DDC for the year 2025-26.
Construction of Protection Wall alongside the Link Road of Sabri MasjId Shari Taj Mohalla Bain Bajalta Near Chowdri Steel Works Under capex 2023-24
Providing and laying 20mm thick OGPC manually on link road from Mohalla Brahmana to Deyaran, S.C Mohalla, Bamu, Rampura, Mohalla Koluwala and Mohalla Mangwala
Constt. Of Lane at Chak Sona Nupa from link road to the house of Neeraj Sharma and others Pyt Chak sona Nupa Block Kathua
Construction of c/path from h/o Tarsem kumar to link road Khowara pyt. Naran block Ghagwal under scheme PRI for year 2024-25