Loading…
Loading…
19,109 results • Best match
Laying of Bitumen on the approach road from Main gate to Sub Divisional Office Complex and allied works at Mechanical and Hospital Sub Division Mechanical Complex Maitra Ramban
CONSTRUCTION OF 50 BEDDED COMMUNITY HEALTH CENTRE SUB- DISTRICT HOSPITAL AT MARWAH NOWPACHI DISTRICT KISHTWAR, BY WAY OF CONSTRUCTION OF APPROACH ROAD TO CHC MARWAH AT NOWPACHI MARWAH
Plastering and painting of boundary wall of power house complex and stone pitching on hill side beside approach road to Power house of Sewa-II PS (CW-662)
Restoration of approach Road by way of Construction of P.C.C Retaining Wall Near Mahamaya Mandir damaged due to heavy rain ward no 71 Jammu. (City Roads 2025-26)
Stage Contract for maintenance and snow clearance of Changa Kahaljugaser l 3.00 Km Approach road to Bus Stand 250mtr , Changa Chancer 1.20Km , Munshi Mohalla 0.50Km Gowari Dhossa Road
Stabilization of hill slope along approach road to Field Hostel Block-A and Protection of upper bench behind Field Hostel Block-A at Kiru HEP, Patharnaki, Dist. Kishtwar
Stabilization of slopes of approach road to Dam and at adit-II by providing and fixing boulder traps for Sewa-II Power Station, Distt.-Kathua, JK (CW-530)
Construction of drain on the left side of the nitco Lane - approach road from Bhagwati Nagar, near H/O Ashwani Kumar, Ward no. 31 (City Roads 2025-26)
Upgradation of GPRA colony Bemina Srinagar JandK during 2025-26. SH.External development of GPRA colony Bemina Srinagar i/c drainage system approach road pathway and grill work etc.
Construction of Causeway with Box / Pipe Culvert along with its approach road over Basanter river in AOR of BOP Nursery under SHQ BSF Indreshwar Nagar in Jammu Sector.
Upgradation and maintenance of road from T02-T01 Km 3rd (Kawoosa) to Peth Kanihama, Package no JK02-3007, Block S.K Pora, length 5.80 Km, Carriage way width- 3.75m Under PMGSY III, FY 2023-24, PMGSY Division Budgam
Construction and maintenance of road from L025- Manzmoh Bakerwal Check Km 2nd Rd 700 M To Sarpalan, (Waste Plastic Technology), JK01-4008, Length 3.50 KM, stage Complete, PMGSY-IV (Batch-I, 2025-26) PMGSY Division Division Kulgam.
Construction and Maintenance of road from L026 Reshgund Warsun KM 4 RD 200 to Gabarwardi Package No JK08 4014 Length 2 20 Kms Stage Complete PMGSY IV Batch I 2025 26 Waste Plastic Technology PMGSY Division Kupwara
Upgradation and Maintenance of Road T02- Handwara Magam Champora via Tulwari, Doolipora, (Waste Plastic Technology) PMGSY III (Batch-III, 2023-24), Stage-U, Length 25.50 Km, Carriageway Width 5.50 Mtrs. Package No JK08-3112, PMGSY Division Kupwara.
Construction and maintenance of road from L021 Ferkan To Keran Km 14 th RD 200 M To Kalas (Waste Plastic Technology), JK08-4003 Length 3.50 KM, stage Complete, PMGSY-IV (Batch-I, 2025-26), PMGSY Division Kupwara
Construction and maintenance of road from L027 Link from Kehlil Nagbal road Km 3rd RD 300 To Chewpaden, (Waste Plastic Technology), JK10-4019, Length 3.60 KM, stage Complete, PMGSY-IV (Batch-I, 2025-26), PMGSY Division Pulwama.
Construction and Maintenance of Road from L054-PMGSY Road Mari Dhakikote Km 47th to Ladha, Package No. JK20-4214, PMGSY-IV, Batch-I of 2025-26, Block-Jig Bagli, District Reasi (Using Waste Plastic) Length-3.085 Kms
Construction and Maintenance of road from L023 Para Amroohi Km 6 RD0 to Pakhian Nallah Shat Galiyan Kupwara Package No JK08 4021 Length 2 40 Kms Stage Complete PMGSY IV Batch I 2025 26 PMGSY Division Kupwara
Balance work for Up-Gradation of road from T01 Sulgar Block Boundary Chenani to Dalsar Khas (Barote to Dalsar Khas), under Package No. JK14-505, Regular PMGSY (Batch-I, 2018-19), PMGSY-I, Block Ghordi, District Udhampur
Construction and maintenance of road from L028- Gohallan-Choti Gohallan RD 2100 m to Dogi Hajam Mohalla, L. 3.500KM, Stage Complete, Carriageway width 3.75Mtrs, PMGSY-IV (Batch-I, 2026-27), P. No. JK03-4512, PMGSY Division Uri.
Construction and maintenance of road from L023-Batangi Prankutran RD 2900 to Banali A via Peerbela, L,4.600KM, Stage Complete, Carriageway width 3.75Mtrs, PMGSY-IV (Batch-I, 2026-27) (Waste Plastic Technology), P.No.JK03-4501, PMGSY Division Uri.
Construction and maintenance of road from L022 Kralpora Dardpora KM3 RD 0 to Gulnar Length 1 70 Kms Stage Complete Carriageway width 3 75Mtrs PMGSY IV Batch I 2026 27 Package No. JK08 4056 PMGSY Division Kupwara
lane from PMGSY road (Sray) to Tedu Thakar Mohalla (1.50) Lane/drain from PMGSY road (Sray) to Malli Wale Prohit Mohalla (1.50) Construction of lane from Sray to Giyan Singh House (Ward No. 8) (1.390) Panchayat Amwalla
Manpower Outsourcing Services - Minimum wage - Semi- skilled; High School; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Construction of 01 No. Inlet Tank Providing laying and Fitting of HDPE Pipe for Shifting of Alignment in Gravity main from Source to Kathogra and Saras, Damage due to road Construction of PMGSY Road from Dranga to Hud Saras under Deposit Contribut
Permanent Restoration of Dhalwas to Savni Karma Road by way of Constt. Of crated R/Walls in Km Ist, 2nd, 3rd, 5th in strecthes Pkg. No. JK19-3007, PMGSY-III, Block District- Ramban
Constt of 3 nos of lane a lane from link road to house of roop lal bua ditta and baba brahma. b) lane from link road to house of Surjeet c) lane at wno 2 to House of kuldeep singh and others
Restoration / Maintenance of roads on emergency basis likely to be damaged during the financial year 2025-26 on Bheja to Thanalla link road (L 1.000 Kms), Katyara Kansar via Haddal link road (L 2.000 Kms), Katyara to Kansar via Upper Haddal link ro
Restoration / Maintenance of roads on emergency basis likely to be damaged during the financial year 2025-26 on Sarolbagh to Atalgarh link road (L 3.450 Kms), Sarolbagh to Shamshan Ghat link road (L 0.500 Kms), Gupt Ganga Temple road (L 0.200 Kms)
construction of lane/Drain from Link Road to Romesh Kumar House and const of lane and P.work from link road to sham lal house at W.NO.8 under component PRIs Grants District capex Budget 2022-23 in respect of Panchayat Dhan Block Dansal
1/ Macadamization of link road from Biaspur to Gujjar Basti (Part-II) Km Ist and 2nd (Amount Rs. 15.00 Lacs). 2/ Macadamization of link road to Village Gharana Wetland (Amount Rs. 30.00 Lacs). (Under City and Town Programme for the year 2023-24)
Upgradation of Mangnar link road ,Mangnar Kalsi road,Super Bazar Nagri,Salootri link road Treatment of Patches and Pot Holes by way of Providing Laying WBM Grade-II, WBM III 25 mm thick Open Graded Premix Carpet including 6mm thick seal Coat
Double Lane bye pass from Pull Doda to Ganpat Bridge (L 1.85 Kms), Khellani to Ganpat Bridge road (L 3.00 Kms), Paryote link road (L 1.55 Kms), Khellani Durga Nagar link road (L 0.375 Kms) and Warni Sarsi road (L 10.00 Kms)
Restoration / Maintenance of roads on emergency basis likely to be damaged during the financial year 2025-26 on Chinote Bridge to University link road (L 1.800 Kms), Court road (L 0.225 Kms), Dheraja link road (L 1.000 Kms), Chinar Mohalla to Qill
Macadamization of following roads 1) Link road from Main road Malla Pukhrani to high school Pukhrani to Dagari (Naresh Kumar) and allied links of pyt Malla allied links (Paver).2) Link road Nai Basti to Lower Barmana (H/O Bod Raj) Pyt Khara
Providing and laying of 150mm thick WBM Grade-II (Shingling), WMM, 50mm thick BM and 25mm thick SDBC on following roads Link road to Choga (Amount Rs. 20.00 Lacs) Link road from Samka road to Rakh Yard upto Shamshan Ghat (Amount Rs. 21.00)
Providing and laying of 150mm thick WBM Grade-II (Shingling), WMM, 50mm thick BM and 25mm thick SDBC on following roads 1/ Link road from Badyal Quazian to PHC Satrayian (Amount Rs. 20.00 Lacs). 2/ Link road from village Magowali to Bhalesar
Construction of Bridge approaches by way of P/L of WBM Grade 2nd , and construction of Pcc Edge wall for balance link road connecting Bobsipora Bridge approach to feeder link road with Painting on Bridge and stone creatework for Watalbagh-Bobsipora B
Construction of Road From Dansal to Chandi Mata Mandir Samral Construction of Road From Dansal to Chandi Mata Mandir Samral
Improvement / Upgradation of Chunna link road by way of Providing and Lying WBM G-I (Under DDC). 4th Time Fresh
PLZ REFER BOQ
Repair and Maintenance of Rural Road and CDs/Bridges of Gagal to Andernad road, Package No. JK0898 under Incentive Funds Scheme of F.Y 2024-25
Renewal Coat/Macadamization of Road from Kachnambal to Chattergul, Package No. JK13-66. PMGSY Division Ganderbal.
Renewal coat / Macadamisation and maintenance of road Laroo - Munand, Length 15.50Kms, JK01-WB03, PMGSY Division Kulgam
CONSTRUCTION OF T/ ROAD FROM M/ROAD PMGSY DODASAN PAIN TO SAIM SAMITH VIA HILL SAYEDAN
Tile work PMGSY Road to Mohd Syed House Langdhar Pyt Lower Behota Block Marmat 2nd Call
Renewal coat Macadamisation of road Pehlipora Hilan Length 2.3 Kms Package No JK03_59 PMGSY Division Uri.
Constt. of T road from Nangla dal PMGSY road to Chudka shitla mata mandir wno 3