Loading…
Loading…
3,50,236 results • Best match
Construction of road from PMGSY Road to Munda Sahi Champajhar under DMF in the District of Keonjhar.
Construction of road from Kandyara PMGSY Janyar Dingla via Mohalla Baania Sattpaja Tandian ,Tehsil Haveli,District Poonch
Renewal work of Ekkatajpur Link Road Pure Imam Ali Link Road Gayaspur Link Road Evam Shahpur Shamshulhak Link Road
Premature link road repair program 2018 19 Phase 2 Group-1 MC Lalru Distt SAS Nagar WC SAS 2019 34
Recarpeting of Link road Repair of drainage system in Quarters of Kendriya Vidyalaya Staff at NSG Camp Manesar Gurugram Haryana
Improvement of Road by Providing Strengthening on NH-73 A to Kot Basawa Singh via Ledi in Yamuna Nagar District ( Under PMGSY-III of Batch-III)
Improvement of road by providing strengthing on Dukheri to Bahnpur via Mohra, Durana, Barola, Jansui, Niharsi, Rasulpur, Nakatpur in Ambala District (Under PMGSY-III Batch-III)
Improvement of road by pdg. wdg. and stg. on Ganaur Bega road to Ghasoli via Shahpur Taga Umedgarh in Sonipat distt. under pmgsy-III Batch-II
Improvement of road by providing widening and strengthening on Kurali to Bhikuka via Faizpur Atali and motuka in Faridabad District Under PMGSY III Batch II Reinvited
Improvement of Road by Providing Widening and Strengthening on Hudithal to Mandkola via Swamika, Gharrot, Puthly and Khokiyaka in Palwal District Under PMGSY-III Batch-II
Improvement of road from Taraka to Ghori via Khedla, Missa, Sihol, Sujwari, Rampur Khor in Palwal Block, Distt. Palwal Under PMGSY-III Batch-II T-02
Improvement of road by providing, widening and strengthening on Kurali to Bhikuka via Faizpur, Atali and Motuka in Faridabad District Under PMGSY III Batch II REINVITED
Farm approach road
S.T.B.T. TO DALITWASTI INTERNAL ROADS AND CONSTRUCTING GUTTERS AT- PACHGAON,TAL-KARVEER ,DIST-KOLHAPUR (L-655.00M B-3.00M SAINATH PARK, SHANTINAGAR SHIKSHAK COLONY INTERNAL ROADS LATITUDE-16.44098 LONGITUDE-73.84388)
TENDER FOR SPECIAL REPAIR OF INTERNAL ROADS AND APF AT FOCAL POINT RAMGARH SARDARAN AND REPAIR OF EXISTING INTERNAL ROADS AT SUB YARD SIARH MC MALOUD DISTRICT LUDHIANA.LDH2021-197
WIDENING OF ROAD AT DIG CHAURAHA ZONE NO 04 second call
Widening of road, Construction of surface water drain, footpath and Cycle track at Dividing road sec-9/10 and all other work contingent there to.
Construction of Road Widening, Renovation, RCC Nallah and Road Divider Work of Circular Road From RBM Hospital to Scheme No-3 Via Chandpol Gate, Bharatpur.
A mtc of internal roads in Sec 14PII Hisar Filling of pot holes with stone metal GrdaeII as per BM specifications and providing laying of 20mm thick premix carpet for patch work on the roads in Sector 14PII Hisar Hisar
BT renewal work of Saliwada approach road , Bahoripar approach road, Mohas approach road, Bargi Railwayfeedar road and Sukri Mangela road. Total length 7.275 km under sub division No. 2, Jabalpur
Renuwal of Rampur Mohaddeenpur link road, Sheetal link road and Badera link road
Renewal of Tilkachua link road and Rawatpur link road and Mangapur link road
Renewal of Imaliya Link Road, Damodar Link Road and Purwa Mhadhawsingh Link Road
Renewal of Bandiya Link Road, Inayatnagar Link Road, Bahera ka Purwa Link Road
RR to Hindu kheda Link Road, Mahesh Kheda Link Road, Dhakiya Link Road
Pure Madari Link Road, Dedani Link Road and Pure Baba Kailash Link Road
Renewal of Ganeshpur Link Road, Dhakiya Chaturiya Link Road and Umariya Link Road
Renuwal of Baghel link road, Pure Musaha link road and Ahalwar link road
Construction of Missing Link Road Newada Mahitha Link Road to Usraha Link Road
Naunpurwa revenue village Bashiya link road Dingurpurwa Link Road and Fattepur Link Road
Renewal of Hiyatpur Link Road, Madhvapur (Machhrehta) Link Road and Ramuvapur Link Road
Construction of Road at Village Mandegoan, Ta.Barshi, Dist.-Solapur.
CONSTRUCTION OF ROAD AT BHADALE PHADTAREWASTI TAL.KOREGAON (ZPCESS 2223)
Ponpuzha approach road concreting in melukavu gp of erattupettah block
Repair of Road Work in Km. 171 . 6-8,0.400 Km. on NH-75 (NH Sub - Division Rewa)
Construction of Approach Road to New Police Station Building, Ajitwal, District Moga.
Asphalting and C.C. road construction work in the main and internal roads of Rajbagh Yojna and Sukhram Nagar located in ward number-06 of Municipal Corporation North.
S.T.M.C. WORK OF (1) BADHAV APPROACH ROAD LENGTH - 1.80 KM. (2) SEMARI APPROACH ROAD LENGTH - 1.10 KM. (3) BUDHI APPROACH ROAD LENGTH 0.47 KM. (4) REST HOUSE NAGOD APPROACH ROAD LENGTH 0.20 KM. (5) SUB DIVISIONAL OFFICE NAGOD APPROACH LENGTH 0.10 KM
S.T.M.C. WORK OF(1) BABUPUR NIMI BARAJ ROAD LENGTH - 4.20 KM., (2) BADERA APPROACH ROAD LENGTH-1.55 KM., (3) JAIL APPROACH ROAD LENGTH - 0.90 KM., (4) DEGREE COLLEGE SATNA APPROACH ROAD LENGTH - 0.40 KM. (5) BAMHAURI APPROACH ROAD LENGTH-0.80 K.M., T
B.T. Renewal on Ahmadpur to Bhavjhar approach road L-0.45 km, Chatarpur Approach road L-2.00 km. Lato approach road L-1.50 km. Mandla Ghughri road to Kandra approach Road L- 2.00 and Madanpur Naijhar Road L-4.00 km. Total L- 9.95 km.
BT Renewal Work on (1) Saraskhedi Dhakoni Road Length 7.00 Km (2) Koharwas Approach Road Length 2.30 Km (3) Parsol Approach Road Length 1.00 Km (4) Janghar Approach Road Length 1.00 Km (5) Bharroli Approach Road Length 1.60 Km under PWD Sub Division
Repair of Roads at Paradip Refinery, Paradip, Odisha.
Annual Repair of Roads under Sub Division Datia
Repair of Roads under sardarpur sub division Dhar
Patch repair of roads in BHEL Township Haridwar
Repair of Roads in various Wards in city
SPECIAL REPAIR OF ROADS AT RAIWALA MIL STATION
CONSTRUCTION OF ROAD PART 2 AT MURTI SONALKARWASTI TAL BARAMATI DIST PUNE
Improvement of road and drain behind kesa substation and from kesa sub station to sri jagannath nishad at Makri kheda in ward-44 khyora under zone 6
Interim Improvement plan of SCB Medical College at Cuttack such as Strengthening of Road, Construction of foot paths and shifting of Utilities