Loading…
Loading…
751 live677 closing this weekmost from Chief Engineer Gorakhpur Zone PWD Gorakhpur UP and Directorate of Local Bodies UP
751 results • Best match
Construction of partial crust of 9.00 M and 12.00 M wide internal Road (Non-Bituminous) and general earth filling in Sector-1C in Bhumi Vikas, Grih Sthan Evam Bazar Yojna (GFT) Ayodhya.
construction of the link road from Kaptanganj Pokhar Bhinda Bankata Bodarwar Km. 2 to Pipra Mafi via Harijan Basti in Dist Kushinagar under CMGSY Scheme in FY 2026-27
Construction work of Chiutaha Hariya Sonai Ramji ke Madai Malauli Bandha Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 10 of 20
Construction work of Vishunpura Bajar Main road Madan Gond Home to Pipara Bhual Harijan Basti link Road. Block Pathardewa Under CMGSY Scheme In district Deoria in FY 2026-27
New Construction of Gram Kalyanpur Kachrauli to ( SwChhedilal Singh ke Mandir ke Pas) Gram Bhadiyapur tak Link Road (Chhooti Cadi) (With Five year Maintenance as per attached SOP) (5)
Construction of 2 cell box culvert of 5x5 meter at Bhattha Chauraha to Chhoti Retawaiya link road Km 1 in District Gorakhpur in FY 2026-27 LOT (6/6)
Construction of 2 cell box culvert of 3x3 meter at Chhamusthan to Ghirau Tola Sheetalpur link road Km 2 in District Gorakhpur in FY 2026-27 LOT (5/6)
Construction and maintenance work of Vikas khand Maharajganj Gramsabha Hilali me Dandupur Border pitch road in balbir gaud house vai nonari bind basti link road (including 05 years maintenance)
Road improvement work by drain and CC from Naresh Pals house to Nilesh Thakurs house via Buddhi Prakash Pandeys house in Mohalla Gaderianpurwa under Zone-06 Ward-44 Khyora.
Tajganj Zone (Ward Nos. 39 and 09) Road improvement work using hot-mix asphalt in Namner, spanning the stretch from Katghar via Bobby Shoe Factory up to the temple.
Lohamandi Zone (Ward No. 25) Road repair work using hot-mix from Bodla Main Road to Garhi Bhadauriya Culvert.
Under Lohamandi Zone Road repair work using hot-mix from Speed Color Lab to Rui ki Mandi Phatak (Crossing).
Lohamandi Zone (Ward No. 90) Road repair work using hot-mix from Kanha Gaushala to Avantibai Crossing in Shastripuram.
Construction of a small bridge 3 X 5 X 5 meter span and an additional approach road over the Chakdaha Nala, situated between Pakri Gosai and Pagra Padri, branching off at the 4th kilometer of the Rajpakar-Karmaini Road in Kushinagar district
Construction of a 3 X 5 X 4 meter span RCC box culvert in place of the damaged culvert located on Doranchi drain on Pakdi link road in Kushinagar district
Construction work of Banhaita Gidha Pitch Road to Khairi to Kasimpur Jigani Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 5 of 20
Construction work of Vikas Khand Gola me PWD Road to Jugesara Goan Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 17 of 20
Construction of Vikash khand nawabganj gram mainpur dr mamta pandey house to darampurwa pakki sadak to ram lalit pandey house chadi bagiya via chotki dubauli akbarpur main road link road
Construction and maintenance work of Sarpataha samodhpur road ke km 1 to right kammarpur gram me sthith stadium vai kammarpur link road ke pitch road tak (including 05 years maintenance)
Road construction work by Dans in Ward-14 R-Block.
Earth filling and Interlocking road construction in Kanha Gaushala premises.
NPM Sarava me Asutos ke makan se Banwari ke makan tak CC road work
New Construction of road from Gram Sabha Ain to Bhadoi and Mawai Padiyana in Lucknow District
Lohamandi Zone Road repair work using hot-mix from Nihal Niketan (No. 47-69) to the Sector-04 police outpost.
Construction work of Gocharan me Gocharan Mata Sthan hote hue Bansgoan Kusmaul Mukhya Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 11 of 20
Construction of a link road from Kali Mata Ji Temple in Gram Panchayat Bhadsar to Bajrang Bali Temple - Length 1-35 km including 5-year maintenance- Lot No 4 of 19
Construction of Vikash Khand Siswa- Barawa Pakari Siswa Gerama Road Nahar pich to Kishan Inter Collage Belawa Link Road under CMGSY Yojana with 05 year Maintenance Lot No 1 of 15
Year 2026-27 Construction of minor bridge over the Sot River at the Km 2 of the Nagla Khakam to Khetapur link road in District Sambhal. (5x8.00 Mtr. Span Box Culvert)
Construction and maintenance work of Vikas khand badalapur ke prayagraj gorakhpur SH-34 road to bhaluwahi me jitendra singh purv sabhasad ke ghar vai Vithuakala link road (including 05 years maintenance)
Gram Sabha Narayanpur me PMGSY marg se Ajay Shaw ke khet se Kishor Pathak Balika Vidyalaya hote hue Om Prakash Chauhan tak marg ke nav nirman ka karya
Road improvement and drain construction work by DANS from KA-33 to KA-60 and KA-94 to KA-117 and Delhi Morthoma Public School in Ward-30 Karpuripuram A-Block.
Road improvement work involving the construction of a drain and a CC (cement concrete) road in Ward-40, Sant Vihar Colony, stretching from Anurag Master house towards the Community Health Centre.
Road improvement work by laying drain and interlocking tiles from Raj Rathors shop to Manju Dubey house in Mohalla Guba Garden under Zone-6 Ward-35 Kalyanpur North, Old Shivli Road
Road Construction work from Mahmoodkheda to Gosha CC in Lucknow District.
4 CC road work from CC road to Sita Khost Temple in Gram Nagla Sahju
NPM Mujasa 2nd me Navshad ke makan se Durgesh wali gali tak CC Road work
Lohamandi Zone (Ward No. 90) Road repair work using hot-mix from Shastripuram Zonal Office to Sector-11 Shani Dev Temple
Construction of a 3 X 5 X 4 meter span RCC box culvert in place of the damaged culvert located on Doranchi drain on Pakdi Bazar Tola link road in Kushinagar district
Construction of Khajni Main Road Khanipur Chauraha to house of Pappu Pal via House of Ramashanker Singh Link Road - Length 1-35 km including 5-year maintenance- Lot No 3 of 19
Construction work of Rakhat Gadhi Beladar Baupar Rawatpar Road ODR KM 4 to Srirampur Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 12 of 20
Construction work of 7x5x3 m Span RCC Minor Bridge, Approch Road, and other safety work on between Balthar Link Road in Distt Gorakhpur in FY 2026-27 Lot No 1 of 1
Construction work of 2x3x3 m span Box culvert and other safety work on Pidra road to Belpar Mathiya Link Road in Distt Gorakhpur in FY 2026-27 Lot No 3 of 5
Construction and Maintanance of Gramsabha Manaura me PWD Sadak Se Banwasi Basti Brahaman Basti and Yadav Basti hote hue Gothawa Devi Mandir tak Link Road in Distt. Jaunpur (including 05 years maintenance)
Road improvement work from Fatehpur Madrasa to Durga Temple in Mohalla Fatehpur, Ward No. 5, Baba Gambhir Das Nagar, using a hot-mix plant, including thermoplastic road marking and installation of cateyes.
NAGAR PANCHAYAT AKBARPUR KE VARD NO. 12 BAJRANG NAGAR (JAMALPUR PRATHAM) ME VIJAYPAL KE MAKAN SE LINK ROAD JAMALPUR EVAM PAPPU KE MAKAAN SE LEKAR MATA HOLIKA DAHAN KI INTERLOCKING EVAM NAALI NIRMAN
Tajganj Zone, Room No. 70 Road repair work using hot-mix at various locations near the water tank in Tal Firoz Khan
Construction of Cement Concrete Road Work in Etawah District Under CSRFY 2026-27 at NTPC Auraiya.
NPM ke antargat Munshiganj me Ramkumar ki dukan se puliya ke pass tak RCC Road work
interlocking road work from ramji kesharwani to vasliganj chowk on the north track of sankatmochan ward.
Construction work of Baranagar Kalika Sthan to Baranagar pitch and Taryapar Dalit Basti to Kalika Mandir Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 13 of 20