Loading…
Loading…
1,04,004 results • Best match
RENEWAL OF APPROACH ROAD ON ISAN NADI NEAR KITHAH VILLAGE
RENEWAL OF APPROACH ROAD ON ISAN NADI NEAR GULALPUR VILLAGE
Construction CC road work from Shikohabad Mainpuri link road (Kaila Bhawani Traders) towards Budrai (field of Ram Singh).
Main road resurfacing work on both sides of the road from Link Road Max Cut to Allahabad Bank Badi Pulia under Vasundhara Zone.
Main road resurfacing work on both sides of the road from Link Road Max Cut to Allahabad Bank Badi Pulia under Vasundhara Zone.
The main road resurfacing work on both sides of the major bridge from Link Road Max Cut to Allahabad Bank under Vasundhara Zone.
General Repair and Renewal with P.C on PMGSY Bajiya link road km 8 Manru Mod to Karkachhi Khadi tola link road
Construction of road Ward-41 Sector-6A and 7 to Chandikapurwa Main road and Internal roads. (City Road)
STRENGTHENING OF ROAD (STRENGTHENING OF 45.00MTR WIDE ROAD AND M/O FOOTPATH, DRAIN, CENTRAL VERGE IN BETWEEN SECTOR-132 AND 128 ) NOIDA
STRENGTHENING OF ROAD (STRENGTHENING OF BOTH SIDE SERVICE ROAD OF MP-3 ROAD FROM SECTOR-71 72 XING TO PARTHALA CHOWK), NOIDA
Repair and protective work of the approach road of Suav bridge located at km 01 of Pranpur link road.
Construction of 2x6.00 M Span Box Minor Bridge and Approach road on Basi Chauraha to kushfara sanidev link Road
Construction work of pulia and Approach Road in Sarai Gopal Bari Road to gaura Dhiwaha and Barboli Link Road.
Construction work of 7x6.00 m span RCC small bridge and approach road on Lodhanpurwa Pasinpurwa (Jangalpurwa Tapri) link road.
Renewal work along with general repair on Approach Road of Bujurga Pahetiya Beso Nadhi and Laghu setu Link Road
Repair of Approach Road and protection work of RCC Minor bridge at Behata Mulahimpur link road in Km 1
Construction of Minor bridge Approach road and protection work on Mustafabad garhi to Pukhewala link road in District Bijnor
Construction of 2 x 3 mt span RCC minor bridge approach road and protection work at Purai link road
Special Repair of Approach Road of Bridge on Rind River in between Village Narkhurd and Chiddipurwa Link Road (VR)
Construction of 4x6.00 m span R.C.C. box culvert, approach road and protection work on Gazrolla link road. Km.-3
C/o. 3x5.00 mtr span RCC culvert and approach road in Km-1 at Manijaradandi to Judidah Link Road
Renewal with General Repair of Etauwa approach road to Mahuvarkol link road LOT 71 of 139 Length 1.50 km
Construction of Main Approach road and Protection work on River Garra Bilgram Nekpur Nevada Link Road in District Hardoi
C/O Box Culvert 3x4mx4m span, Approach Road at Patranga Mandi to Patranga gram link Road on Bhawariya Nala
Construction work of 1 x 6.00 M Span Culvert and Approach road on Murcha road to Shidhepur link road
25 Block Gajraula in villege sadpur link road construction of cc and drain work from pra. School to villege side
Construction of Link Road Sareni road nahar patri se pure jaysingh gaon nahar patri link road.(L-0.90 KM0
Special Repair of pure Gangaram link Road se PMGSY Road se Samadhi Tak, Special Repair of Gokula se Tand Link Road and Special Repair of Satgawan Link Road
Repair work of the approach road and additional approach road to the long bridge over the Madha River at Bala Pakoli on the Gosaiganj-Senpur link road in Ambedkar Nagar district.
Construction of CC road Work in Village Rajapur from Junior High School to Bhaisa-Brajpur Link Road
Construction CC road work from Nagla Khem Karan link road towards field of Satyendra Singh in Suratpur.
31 Block Amroha in Diyodhi urf Hadipur link road construction brick soiling work from Nainsukh house to Samarpal field
LINK ROAD ARKA FATEHPUR MARG SE AKORA TAK ROAD REPAIR WORK
Construction of CC road Work from Rasidpur Kanetta Highway from to Akalpur Damodarpur Link Road towards the Highway
Strengthening of road (P/L B.C. work on internal road in E-3 and E-5 Shatabdi Vihar Sector-52 ) Noida
Strengthening of Road (P/L BM and BC work in Internal Road Sector-8), Noida Part-II (Block- E and F)
Under District Jaunpur Construction of Road from Kuttupur Link Road to Link Road via Daya Saraswati School
Construction work of Gond Basti link road from km 28 to left Palhari of Bhadai Arar link road PMGSY under Kodai cluster
Construction of Road work in Village Mukarpuri (Dhampur Assembly Constituency) extending from Ikrar house towards the Gangadharpur link road. (Member of Parliament Nagina)
CC ROAD WORK ON THE BISANDA RURAL LINK ROAD
RENEWAL OF APPROACH ROAD ON ISAND NADI BETWEEN FATEHAGARHI PAHADPUR VILLAGE
RENEWAL OF APPROACH ROAD ON ISAN NADI BETWEEN JAKHA HAVILIYA VILLAGE
RENEWAL OF APPROACH ROAD ON ISAN NADI BETWEEN JAKHA HAVILIYA VILLAGE
SR ON APPROACH ROAD ON ISAN RIVER BETWEEN FATEHGARHI PAHADPUR VILLAGE
RENEWAL OF APPROACH ROAD ON ISAN NADI NEAR MYORA VILLAGE
STRENGTHENING OF ROAD (WIDENING OF 24 MT./18MT. WIDE ROAD AND P/L C.C. PAVER BLOCK ON ROAD PATRI OF ROAD IN SECTOR-70), NOIDA
Construction of a (5m x 5m x 4.70m box culvert) on the Khajraha-Ghaghri link road (rural road).
CONSTRUCTION OF ROAD WORK
Construction of road work
Construction of road work