Loading…
Loading…
1,906 results • Best match
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetera including five-year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetera including five-year routine maintenance
Formation Cutting, C-o Passing Places, R-wall, B-wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
C/O Sirmouri Mandir Baghtan road Km 0/0 to 10/300 ( SH ROFD in various Rds in Km 2/0 to 5/0, P/L Soling in Km 9/0 to 10/300 and M/T in Km 1/0 to 2/0 and C/o unlined drain30 mm thick, Bituminous Macadam 50mm thick and thermoplastic compound etc.
Providing and laying of Hot Applied Thermoplastic Paint in Km 9/000 to 21/000
SH Providing Grade III BC 30mm thick bituminour macadam 50mm thick and thermoplastic compound etc
P/L 30mm Bituminous Concrete, Thermoplastic paint strip in km 78.00 to 79.00 ) (MDR Road)
P/L 30mm Bituminous Concrete, Thermoplastic Paint strip in km 0/0 to 0/620
Providing laying renewal coat using 25mm thick (10cm wide) thermoplastic paint i/c 5year maintenance
P/L 30mm Bituminous Concrete, Thermoplastic paint strip in km 3/00 to 4/00
P/L 30mm Bituminous concrete, Thermoplastic paint strip in km 0/0 to 1/0
SH Supplying and fixing delineating road safety equipment from Km. 0.000 to 14.600
1.Purli to Jattan-Di-Dhar road km. 0/0 to 5/300. (SH P/L 30mm thick B.C. 2.5mm thick road marking thermoplastic strip in km. 0/0 to 1/0, 1/0 to 2/0, 2/0 to 3/0, 3/0 to 4/0, 4/0 to 5/0 5/0 to 5/300) HP0302VR0077. 2. Jungle Beri to Bouru via Cham
Providing and laying 25mm thick Mix seal surfacing, plastic mix seal surfacing and road marking in K.M. 0/0 to 3/340
SH Providing and laying renewal coat by proving 30mm thick bituminous concrete and road marking in km 64/0 to 65/320
SH providing and laying renewal coat by providing 30mm thick bituminous concrete and road marking in km 4/0 to 4/650
SH Providing and laying Pot Hole , Bitumen Concrete and 2.5 mm thick road marking strips in Km 2/00 to 4/765
SH Providing and laying Pot Hole , Bitumen Concrete and 2.5 mm thick road marking strips in Km 0/00 to 5/665
SH Providing and laying renewal coat by providing 30mm thick Bituminous concrete in Km0/0 to Km4/0 along with road marking
SH Providing and laying renewal coat by proving 30mm thick bituminous concrete and road marking in km 0/0 to 2/0
SH Providing and laying Pot Hole , Bitumen Concrete and 2.5 mm thick road marking strips in Km 2/00 to 3/00
SH Providing and laying renwal coat by providing 30mm thick Bitumenous Concrete in Km57/320 to 59/0 along with road marking
SH Providing and laying renewal coat by providing Bitumenous concrete in Km2/0 to 5/0 including road marking and side drain
SH Providing and laying renewal coat by providing 30mm thick bituminous concrete and road marking in km 2/0 to 4/0
SH Providing and laying renewal coat by providing 30mm thick Bituminous concrete in Km 1/500 to 3/330 including road marking
SH Providing and laying Pot Hole , Bitumen Concrete and 2.5 mm thick road marking strips in Km 0/00 to 0/680
Improvement of Stretches Junctions and Providing Road Safety measures on NH 503 Extn at following locations i Pakka Paroh Km 2 900 to 3700 ii Baduhi near Dussara Km 13 750 to 14 150 iii Kuthiyari Km 4 908 to 6 677 iv Diara Km 14 150to 15 665
SH 30 mm Bituminous concerete Thermoplastic paint strip in K m 0 0 to 1 0
P/L 30 MM Bituminous Concrete, Thermoplastic paint strip in km 71.00 to 72.00 )(MDR Road)
P/L GIII, Bitumenious Macadam for Correction layer , P/F cate-eye, Plasting Sheeting, Thermoplastic km
Providing and laying 25 mm thick bituminous concrete and thermoplastic paint lining in curve portion only
SH 30 mm Bituminous concerete Thermoplastic paint strip in K m 11 00 to 11 500
P/L 30 MM Bituminous Concrete, Thermoplastic paint strip in km 77.00 to 78.00 )(MDR Road)
SH 30 mm Bituminous concrete Thermoplastic paint strip in K m 0 0 to 2 250
SH 30 mm Bituminous concerete Thermoplastic paint strip in K m 10 0 to 11 0
Providing and laying 25 mm thick bituminous concrete and thermoplastic lining in paint curve portion only)
SH 30 mm Bituminous concrete Thermoplastic paint strip in K m 0 0 to 1 0
SH 30 mm Bituminous concerete Thermoplastic paint strip in K m 0 0 to 1 0
P/L 30.00 mm Bituminous Concrete, Thermoplastic paint strip in km 0/00 to 2/800
SH 30 mm Bituminous concrete Thermoplastic paint strip in K m 0 0 to 1 0
SH- Providing Fixing W metal bream crash barrier at RD 1/460 to 1/560 and at bus stop 0/00 to 0/200 and improvement of curve on Majhthai Bharyal road at Rd 0/00 to 0/660, 1/400 to 1/460, 1/700 to 1/760 and 2/400 to 2/445 UNDER SPMRM
P/L 25 mm. thick Mix seal surfacing in km 6/0 to 7/600 and Road marking) km 0/0 to 8/900 on Bangalu Luhnu road AND P/L 25 mm. thick Mix seal surfacing in km 5/0 to 8/900 and Road marking on Alsoo to Jambla road.
SH Supplying and fixing retro refractive road safety equipment from Km. 0.000 to 14.600
SH Providing and laying renewal coat by providing Bitumenous Concrete in Km0/0 to 1/0 including road marking C/o side drain
Repair of pot holes and providing 10cm wide road marking and 30 mm thick bituminous concrete in km 69/00 to 74/00)