Loading…
Loading…
9,252 results • Best match
TGGENCO KTPP CHP Servicing Inspection and trouble shooting of GE make PLC systems of Stage I II CHP and ACHP for the period from 01.04.2026 to 31.03.2027
Supply and installation of PLC Panel at PH No. II of KALIGANJ Water Supply Scheme in the District of Uttar Dinajpur under Malda Mechanical Division, PHE Dte.
Custom Bid for Services - Installation, AMC and Wiring for Siemens PLC Panel for A Centrifugal Machine, Thyssenkrupp Make 1250KG/Charges Panel Similar Category Repair and Overhauling Service
Repair, Maintenance and Installation of Plant Systems/Equipments - Manufacturing Unit; 244 NONCOMPREHENSIVE MAINTENANCE CONTRACT OF ROCKWELL PLC AT NITRIC ACID PLANT RCF TROMBAY UNIT; As per SOW
SH Replacement of rusted steel conduit and providing wiring, rewiring, power point and lights in 5th floor to 8th floor, New Boys Hostel
Taking down and new Sluice Valve 200 mm dia, Taking down and new Sluice Valve 150 mm dia, Taking down and new Sluice Valve 100 mm dia, Taking down and new Sluice Valve 80 mm dia, S I T and Commissioning of PLC based Slave Monitoring, SIT and ... of PLC based ... of PLC based ... of SCADA software, ... M SCADA system ... of SCADA system ...
Construction of Scada Room and Chlorine Room at Zone-IX X of Joypur Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte
Construction of Scada Room and Chlorine Room at Zone-I of Jhalda-II Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte
Construction of Scada Room and Chlorine Room at Zone-I, of Purulia-II Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-VII VIII of Para Block Of Purulia Pipe Water Supply Scheme (Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-XV XVI of Para Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone- XI of Purulia-II Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-XVII XVIII of Para Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-II of Raghunathpur-I Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Supply, Installation, Testing, Commissioning, Training, Maintenance, Electrification and Automation with SCADA System Including Construction Of Barrage Control Room at Chaudhary Charan Singh Rapti Barrage - Shravasti, Uttar Pradesh,Under National HHP
Construction of Scada Room and Chlorine Room at Jhalda-II (Zone - II, III VI) Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-XIV XV of Kashipur Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Electrical System or Installation; Repair of SCADA system installed at 1 MW Solar Plant at AF Station Phalodi
Additional works of addition and rectification in existing Siemens make SCADA system (software and hardware both) at 220 kV S/S R. C. Green, Gr. Noida under ETD-II Noida
Repairing and Servicing of 21 Nos ACs including parts and labour installed in AC Kiosks and SCADA room at 220 132 kV S stn Badli Bhadana Machrauli Garnawati and Assaudha
Construction of Scada Room and Chlorine Room at Zone-VII VIII of Puncha Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone- XVI of Jhalda-I Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-VII VIII of Hura Block Of Purulia Pipe Water Supply Scheme (Northern Sector) within Purulia District under Purulia Division, PHE Dte
Construction of Scada Room and Chlorine Room at Zone-XI, XIII of Kashipur Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-VI, VII of Joypur Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Repairing of Revolving chair Visitor Chair Executive Chair and Sofa at Corporate office SCADA Data Center I T Cell and the offices at Nishta Parisar Bijlee Nagar Colony Govindpura Bhopal.
DESIGN SETC OF 25 KV, 50HZ, SINGLE PHASE, OHE TRACTION SYSTEM TSS SWITCHING POSTS IN SENDURGARH PENDRA ROAD SECTION SCADA WORK OF GEVRA PENDRA ROAD SECTION, ALONG WITH ASSOCIATED WORKS
Creation of 01 no. 132 kV line bay at 132 kV S/Stn Dudianwali to accommodate stringing of 2nd circuit of 132 kV Nuhiyanwali-Dudianwali D/C line- SCADA Integration
Construction of Scada Room and Chlorine Room at Manbazar-II (Zone - II, IV VI) Of Purulia Pipe Water Supply Scheme(Southern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-I, II of Hura Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Providing and installation of MCC Starter panel with SCADA for whole operational system at Panaghar IT Park (Both WTP and Intake) and other allied works, DMC area, District-Paschim Bardhaman.
Construction of Scada Room and Chlorine Room at Zone-I III of Joypur Block Of Purulia Pipe Water Supply Scheme (Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-VIII of Purulia-I Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Housekeeping and cleaning services for the Data Center Building at New Town, Kolkata including Data Center at ground floor, SCADA Control Center at first floor and adjoining installations and pathways.
Construction of Scada Room and Chlorine Room at Zone-IX of Jhalda-II Block Of Purulia Pipe Water Supply Scheme (Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-IV of Jhalda-II Block Of Purulia Pipe Water Supply Scheme (Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-VII of Raghunathpur-I Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-IV V of Puncha Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte.
Construction of Scada Room and Chlorine Room at Zone-IV V of Joypur Block Of Purulia Pipe Water Supply Scheme(Northern Sector) within Purulia District under Purulia Division, PHE Dte
Design manufacturing,supply,installation,testing,training and commissioning of RSS,ASS,SCADA,OHE and switching stations for CMRL phase II_corridor 4 (From Poonamallee Bypass to Lighthouse,including Depot at Poonamallee)
Biennial day to day repair and maintenance of Administrative Building, Zonal Store, Zonal Testing, ZCC and SCADA Building along with grass/jungle cutting under the control of Zonal Office, Siliguri.
For the work of E-PBX, CCTV Camera, Video Conferencing System, Computer System installation and related networking work in CE (Trans Gomti) office SCADA Building, Vibhuti Khand, Gomti Nagar, Lucknow.
50 L Biofermenter, 5 L Seed Fermenter, PLC based Centralized Control Panel, pH Sensors, SOFTWARE Supervisory Control and Data Acquisition System for realtime bioprocessing control and monitoring of both 5L and 50L Fermenters, Laptop for SCADA software, Steam Generator Electric Boiler 18 KW, Air Compressor 10 CFM 100 L storage Tank, Chiller Circulator with water circulation pump, Ribbon Mixer Blender Total Capacity 300 kg, Steam Sterilizer Chamber Total Capacity 50 kg, SS Pipe line and fitting From Fermenter to Utilities, Ultra Pure Water purification Unit, DO2 Sensors
Custom Bid for Services - Perdiem charges on normal working days, Custom Bid for Services - Perdiem charged on Holidays, Custom Bid for Services - Overtime charges on Normal working days, Custom Bid for Services - Overtime charges on Holidays, Custom ... Aadvance PLC -Normal, ... Aadvance PLC Holiday, ... Aadvance PLC -Normal, ... Aadvance PLC - ...
Programmable Logic Controller (PLC) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6567489 Dated : 09-09-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 180000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 29 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CGM (RS, S & T) METROS, No.327, Anna Salai, Nandanam, Chennai - 600035, Tamil Nadu, India. (Chennai Metro Rail Limited) Splitting 2/7
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of Jackwell with pump houses at Cauvery river and Agara Tank, Impounding Reservoirs at Agara and Maddur tanks, MS pipe Raising main from Cauvery ... houses, SCADA , ...
Design, Supply, Installation, Testing and Commissioning of 110kW Advanced On-Grid Solar PV System with Micro inverter Architecture and Smart Energy Monitoring. And Lesioning with Electricity board, Supply, Installation of Luminaries for the safety & ... for SCADA System). ...
Propylene Unloading Compressor 323-K-1002 A, Propylene Unloading Compressor 323-K-1002 B, LPG Unloading Compressor 323-K-1003 A, LPG Unloading Compressor 323- K-1003 B, BUTENE-I Unloading Compressor 323-K-1004 A, BUTENE-I Unloading Compressor ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ... for PLC System ...
High End Desktop Computer (Q2), Multimedia Projector (MMP) (Q2), Online UPS (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), PLC based fire alarm system (Q3) (3 (3 ))
AC CONTROL CABLE 2TON W07, COOLANT REFUELING PUMP, FLOW SWITCH, RUGGED DIPOLE ANTENNA, PRESSURE GAUGE 30 to 350 PSI, MAIN PLC, ON DELAY TIMER, THREE TON AIR CONDITIONER