Loading…
Loading…
2,453 results • Best match
Building
RCC framed with ground floor first floor building
BUILDINGS
RCC Framed structure for Basement, ground, first and second floor.
Please refer tender document
Please refer Tender document
GENERAL Annual Plan 2023 24 Govt LP School Parippayi Construction of School building for Govt LP School Parippayi Kannur General Civil Work
GENERAL-Soil Investigation Work- Annual Plan 2022-23-Construction of school building for Government High School, Mathamangalam, Wayanad-Soil Investigation-Investigation Work
Construction of Ramp and Rail is prepared for the easier accessibility of disabled students to the school buildings. Two Ramps were proposed to the Main Block.The estimate is prepared based on DSR 2018 with cost index 35.59
Electrical
Soil investigation work
RCC Framed structure with Laterite masonry wall with cement plastering
Building etc
Construction of building with 6 class rooms, a counsiling room ,a staff toilet and toilet block
Provisions included in the estimate are for mobilization of tools and plants soil investigation details of 4 nos of boreholes with an average depth of 12 m in all class of soil
Please refer the tender documents
RCC framed structure with GF,FF and SF
Proposed building is of framed structure with individual R.C.C. footing for column connected with beams at plinth level and floor level. RCC slab is provided to the roof.There are total of four class rooms, Toilets,urinals and stair room.
Framed structure building for second floor of the existing building
The proposed work includes Soil excavation for foundation Form work RCC footing with M25 mix plinth beam Coumns beams and RCC roof construction using M25 concrete Structural work of 7 class rooms 1 staff room toilets Principals room stair
KIIFB Project 2019-20Infrastructure Development of School Vengara LAC - Construction of Building for GUPS Mundothuparamba Parappur, Mlpm Dist.
New construction
Please refer Tender document
Soil Investigation
tion including transportation Setting up boringBoring with rotary power drilling equipment for strata upto 10m Boring with rotary power drilling equipment for strata next 10m and upto a depth of 20m
This proposed building has Two floors with 3 class rooms staircase and Head room . Foundation proposed to G plus 2 Stories .The total plinth area is 307.28sqm .The footings are considered Isolated footing etc
GENERAL medical college flag postconstruction of flag post in govt medical college office functioning at nursing school building Manathavady wayanad general Civi Work
GENERAL-General Education- Annual plan 2018-19 Construction of School building for Govt. Fisheries H.S.S, Kuzhithura, Karunagappally, Kollam-Work-General Civil Work-1
Two storied RCC Structure
Annual plan 2022-23- Project No.47/23- Renovation of Padinhattumuri GLP School building in ward no3 of Koottilangadi Grama Panhayath - General Civil work
Govt Hss Chala-Construction of new School building and Amphitheatre for Govt .HSS Chala at Kannur-Supply and Installation of Audio system for Amphitheater
Annual Plan 2022 - 2023 - Project No 48 - Renovation Of Vallikkapatta GLP School Building In Ward No 8 Of Koottilangadi Grama Panchayath--General Civil Work
Please refer the tender documents
RCC framed structure for cellar, ground, first and second floor.
Building work
Electrification
Construction of Schol Building of Government Model Higher Secondary School Varkala Thiruvananthapuram Phase I General Education Annual Plan 2019-20
Provisions of 5 boreholes and total station surveying
Boring with rotary power drilling equipment for strata next 10m and upto a depth of 20m, Boring with rotary power drilling equipment for strata next 10m and upto a depth of 30m, Boring with rotary power drilling
RCC framed structure with GF and FF.
CONSTRUCTION OF BUILDING