2,454 results • Best match
REFER TENDER DOCUMENTS
This estimate includes total station survey and soil invetigation works .ie machine boring by taking 5 bore holes and testing samples at an intervel of 1.5m.
Block 1 -stair room and 3 class rooms( in First Floor ). Block 2 stair room and 3 class rooms( in First Floor ) Block 3 - Ground and First Floor
Please refer the tender documents
Building renovation
Construction of the third floor of HSS-A block at GHSS Munderi ( RCC framed structure structure ), Construction of Entrance Gate, Compound Wall , Open Air Theatre, Over head Tank.
Construction of building
Building Maintenance
Soil test
-Construction of New Building-block2 - RCC framed structure for ground and first floor-construction Toilet Block-Existing school Building Block1-Ground floor -Tile work and Repainting -PROVISIONS OF RAMP
New Construction
BUILDING REPAIR WORKS
Construction
Govt. N.S.S L.P School, Vazhoor work
Construction of new building G plus 2 and Construction of 2nd Floor in the existing Building Building.
New Construction No tender excess is allowed Estimate is prepared as per DSOR 2016 with cost index 31.06 percentage
Refer Tender Document
new building framed structure
Topographical survey and premilinary soil investigation work of the proposed site
Refer Tender Document
RCC framed structure - The balance area of the Ground floor and part of the first floor
Building
Construction of soak pit Kanhirangad LP School-Pro NO 24/22-23 Construction of soak pit Kanhirangad LP in Pariyaram G P
Building
compound wall and plot levelling
The estimate prepared as per the request of The Principal Model Technical Higher secondary School Kapprassery for construction of a new toilet block and Painting works of existing school building
GENERAL-Construction of New Building for Government High School, Karikkakom, Kazhakkuttam, Thiruvananthapuram - Phase I - Revised AS-Construction of School Building for Government High School, Karikkakom, Kazhakkuttam, - Phase 1- Composite Work
RCC Framed Structure - GF and FF
Building
Construction of the Third floor of the HSS-A block at GHSS Munderi (RCC framed structure),Construction of Entrance gate Compound wall, Open air theatre and OHT
BUILDING
BUILDING
The work includes new block with two floors with 6 class rooms toilet wash area and a stair room The building is planned as RCC framed structure on column footing
Electrical
constructing drain over a length of 80 m including a culver
4 numbers of bore hole exploration are proposed. The provisions included in the Estimate are Mobilization,Setting up borehole,Boring with rotary drilling equipment upto 10m,20m,30m,above 30metc,boring through hard strata,spt,compilation of field data
Investigation Work
Investigation Work
3 storied RCC framed structure Building
GENERAL Investigation estimate GHSS Sankaramangalam General Education Department Annual Plan 2021 22 Construction of School building for the High School Wing of the Govt Higher Secondary School Sankaramangalam Kollam Part TSInvestigation Work
Construction of toilet ,washroom
This work includes Earth work excavation PCC RCC solid block plastering painting Flooring with GI sheet roof necessary toilet fittings RCC septic tank PVC water tank etc