Loading…
Loading…
2,453 results • Best match
Refer Tender Document
Three storied building with RCC column framed structure
Construction of First Floor and Second Floor - RCC framed structure building.
The building is proposed as two story RCC framed structure
Soil Investigation work
Two storied RCC framed structure building.
completion of KNM UP School construction in ward 7 of Devikulangara Grama Panchayath
Govt. L.P.S Alathottam - Barrier free school-Construction of RampsAccessible Toilet-General Civil Work
MLA-SDF-2024-2025 Sri Adv Sebastian Kulathunkal MLA Poonjar LAC - Completion of Erattupetta Gov. Higher Secondary School Building Construction-Ward 22-General Civil Work
This estimate prepared for the constrction of a dining area with wash area by the maintanance work at the back yard of the School building.
General Education Department Annual Plan 2022 23 Construction of 3 classrooms Over Existing School Building for GHSS Paivalige Nagar in Kasaragod District General Civil Work
New Construction
Building Construction
GENERAL-Annual Plan 2021-22
This work is a composit work includes construction of A two storeyed RCC framed building with 6 class rooms stair roomverandha The provisionsgiven are all civil works including finishing works water supply sanitary and electrification etc
RCC Framed structure with GF FF SF
Building
ELECTRIFICATION
Buildings
The estimate is prepared as the balance works of phase 1 which includes 5 labs and two class rooms
Refer tender document
Three storied RCC framed structure having 5 classrooms of size 6.10x6.10m and stage.
Refer Tender Document
RCC framed structure with GF,FF and staircaseroom in SF
The total built-up area is 318.18 m2 for GLPS Kunhimangalam and 298.40m2 for GMLPS Kunhimangalam. For GMLP, the ground floor includes four classrooms, toilets, and a stair room, while the first floor
Maintenance of Govt UPS in ward 10 of Haripad municipalityis proposed under Annual Plan 2024-25. The project includes the maintenance work of 2 school building
GENERAL-General Education DepartmentConstruction of School Building For Govt. L P S Edamulakkal Punalur LAC Kollam For Edamulakkal Gov L P S Punaloor KollamGeneral Civil Work
RCC framed structure with GF FF
Please see tender documents
GF of the building is proposed for construction. In GF a lab NCC room Chemistry lab and fire staircase room disable friendly toilet Toilets for girls and boys is proposed. In FF the staircase room with sheet roofing is proposed.
provision for galvanised iron profile sheet work and the sheet roofing for movement of children to toilets from the dining area to safe guard them from the rain and sunshine also included.
Single storied RCC framed structure for lab builidng and open auditorium
Building proposed to construct in framed RCC structure in this proposal consist of class room staff room office toilets for girls boys staff toilet and dining hall
RCC framed structure
Construction of Building
Building
RCC framed structure
GENERAL Education Department Annual Plan2025 26 Construction of school building f o r G o v e r m e n t H i g h e r S e c o n d a r y S c h o o l T h e k k u t h o d u P a t h a n a m t h i t t a Construction of thekkuthodu school General
Please refer Tender document
Building work