Loading…
Loading…
2,454 results • Best match
building
Building work
Refer Tender Document
The work includes providing galvalume roofing to office and class room blocks to prevent leakage from roof.steel tublular truss work and galvalume roofing are proposed.providing M30 concrete
The work is proposed for replacing the damaged false ceiling of the existing school building and constructing a new kitchen anddining room in place of the damaged one etc. of the MV LP School.
Construction of Second floor and finishing works of all three floors.
minimum 3 nos of bore holes are to be drilled for collecting the soil samples from the site.
Earth work, RCC M 30 for plinth beam, lintel sunshade, roof slab, over head tank, septic tank etc. Solid masonry, plastering, etc in Civil head and . LED tube, ceiling fans, exhaust fan Power outlets, power plug etc. in Electrical head are included
New construction GTS School
This work includes Earth work excavation PCC RCC solid block plastering painting Flooring with GI sheet roof necessary toilet fittings etc
6no. Boreholes are proposed for a depth 42.50m.The provisions included in this soil investigation Estimate are Mobilization,Setting up bore,Rotary drilling at various depths,Drilling Hard rock,SPT,Collecting samples,Compilation of Field data etc.
construct ground plus first floors for class room Kitchen Toilet block etc
RCC framed structure 3 floors (Ground PLUS 2)
Construction of 2 stair rooms and 6 class rooms for High school and 4 class rooms for Higher secondary School.
CONSTRUCTION OF TOILET
As per the shape of this drawing, minimum 2 nos of bore holes are to be drilled for collecting the soil samples from the site.
RCC framed structure - Ground Floor and First Floor
LAC-ADS-2023-24 Construction of School Building for Chekadi G.L.P School at Pulpally G r a m a P a n c h a y a t h S u l t h a n Bathery
Construction of RCC Framed structure with 3 Floors
minimum 2 nos of bore holes are to be drilled for collecting the soil samples from the site
Refer tender documents
Soil test
GENERAL-General education department budget plan 2024-25-Venchembu School -General Civil Work
4 numbers of bore hole exploration are proposed. The provisions included in the Estimate are Mobilization, Setting up boring, Boring upto depths 10m,20m,30m,above 30m, , Boring through hard strata, , SPT,samples complation of field data
,Vitrified tile, wall tile, Tactile tile , Handrail ,GI Tubular work, enamel paint and GI Roofing sheet etc.
Building
THIS BUILDING INCLUDES FIRST FLOOR,SECOND FLOOR AND STAIR CASE ROOM,IN EACH FLOOR 3 NOS OF CLASS ROOM AND VERANDAH AND INCLUDE AUDITORUM
GENERAL-CONSTRUCTION OF SCHOOL BUILDING FOR GOVT LP SCHOOL K A R I M B I L A T T H O N D A R N A D U - MANANTHAVADY AT WAYANAD DT- ELECTRIFICATION TO LP SCHOOL KARIMBIL -General Electrical Work
Construction of second floor above the existing buiding, a grill covered sheet roofed third floor(for temperorally arranging play school for childrens), finishing works of all floors, Main gate, compound walls, septic tank, sump and soakpit etc
RCC framed building for HS block
New construction
The building is proposed as framed structure RCC, solid block, pressed steel Door windows, plastering, etc are included in the estimate
GENERAL General Education Department Annual Plan 2022 23 Construction of New building Ground Floor for Govt U P School Puliyannur Thrissur General Civil Work
CIVIL WORKS
GENERAL-SOIL INVESTIGATION WORK in Government Welfare HSS , Cherukunnu-- Soil Investigation Work for Construction of school building for UP Wing of the G o v e r n m e n t W e l f a r e H S S , Cherukunnu,Kannur-General Civil Work
Building
Electrical
Refer tender document
Balance finishing works in 1st Floor