Loading…
Loading…
2,222 results • Best match
AMtc of EPHS in Sector 7 UE Ambala City Providing and fixing of 16Sqmm submersible cable 6 MS pipe and repair of 25HP submersible motor pump and repair of Tubewell in Sector 7 STP UE Ambala City complete in all respect
Annual Maintenance of Street Light Points EDC on dividing road of Sector 1 and 4, Sector 4P-II and SP, STP, HSVP Nursery and various major parks at Hisar for the year 2026-27. Rates taken in DNIT are excluding GST
Silt clearance from Storm water drain from 40 MLD STP Rishi Nagar upto Shahpur Village multipurpose drain meeting point with minimum width 12 feet by 4 feet deep by poclain machine with driver fuel charges and lubricant charges including jungle
Annual Mtc Various WS scheme falls under PHE Sub Divn Barwala Job work for removing blockage in sewer system with Bamboos and Fattis at STP Barwala Town in Ward No one to ten complete in all respect for the period
Silt clearance from Storm water drain from 40.00 MLD STP Rishi Nagar upto Shahpur Village multipurpose drain meeting point with minimum width 12 feet 4 feet deep by poclain machine with driver fuel charges and lubricant charges including jungle c
Annual Mtc Various WS scheme falls under PHE Sub Divn Barwala Job work for removing blockage in sewer system with Bamboos and Fattis at STP Barwala Town in Ward No eleven to twenty complete in all respect for the period
laying of 200mm and 300mm i/d S.W. pipe sewer, const. of brick masonry Manhole chambers and all other works contingent thereto in Nuh town
Rough Cost Estimate for Development of Urban Forest in 5.0 Acres area in 100mtr. wide green belt in sector-25, HSVP, Hisar. (including one year free mtc. and defect liability period, free of cost).
IN TOWNS NAMELY JIND, JULANA, SAFIDON, NARWANA AND UCHANA IN HARYANA STATE
DNIT for providing and laying 900 mm id RCC pipe NP3, construction of manhole chambers and all other works contingent thereto
DNIT work for mtc. green belt, road side, STP and Central verge plantation, tree plants and shrub plants with watch and ward and watering in plants etc. at UE Sonepat EDC work P-III and all other works contingent thereto. Re-Invited
Aug sewerage scheme Hisar Town. Construction of 40 MLD STP Rishi Nagar. Providing and laying of 200 mm SW sewer line and construction of manhole in back side of Om Complex near Hanuman Mandir wali Gali New Model Town Extension Hisar Town
Manpower Outsourcing Services - Minimum wage - Skilled; Others; Lift Operator, Manpower Outsourcing Services - Minimum wage - Skilled; Others; Pump Operator, Manpower Outsourcing Services - Minimum wage - Skilled; Others; STP Operator, Manpower Outsourcing Services - Minimum wage - Skilled; Others; Electrician, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; Electrician
AMtc of EPHS in Sector 7 UE Ambala Providing and fixing of 15HP Horizontal Motor Pumping Set Monoblock Control Panel NRV Sub Cable and CI specials etc at STP sector 7 Ambala complete in all respect and all other works contingent thereto
job work for cleaning of sewer lines at Gol Chakkar towards Nasiyaji STP by bucket type sewer machine including cost of diesel, lubricants complete in all respect at Rewari Town, only sewer machines will be provided by the department and all other wo
AMtc of 15 MLD STP UE Kurukshetra Providing fixing and commissioning of outlet sensor with digital for supply of online data transfer to CPCB and HSPCB server for Existing system of water quality monitoring systems parameter is BOD COD TSS PH and E
AMtc of EPHS of 15 MLD STP at UE Kurukshetra Repair and service of Scada Supervisory Control and Data Acquisition panel CI specials MCCB and cable Kurukshetra complete in all respect and all other works contingent thereto A Mtc of EPHS of Amb
AMtc of EPHS in Sector 7 STP UE Ambala Repair of Ultrasonic Electromagnetic Flow Meter Inlet outlet sensor with Display MCCB Control Panel Board Sluice Valve NRV and Cables etc at Sector 7 Ambala complete in all respect and all other work
A/MTC. OF STREET LIGHT POINTS (EDC) DIVIDING ROAD OF SECTOR-6 AND 7 SECTOR 7 AND 8, SECTOR-8 AND 9, OUTER ROAD OF SECTOR -7,8 AND 9, HBC, STP, WTP AND VARIOUS MAJOR PARKS AT JIND FOR THE YEAR 2024-25
Development of park Near H. No 927 (PROVIDING AND FIXING OF OPEN AIR GYM AND CHILDREN PLAY EQUIPMENT IN PARK NEAR H.NO 590, SECTOR-6, MDC PARK NEAR H.NO 927 SECTOR-28 AND PARK NEAR H.NO 165 NEAR STP SECTOR-28, PANCHKULA
Annual mtc. of Street Light points on dividing road of Sector-6 and Sector-7, Sector-7 and 8, Sector-8 and Sector-9, outer road of Sector-7, 8 and 9, STP and WTP at Jind for the year 2022-2023 -EDC
Providing, fixing and commissioning of outlet sensor with digital meter for supply of online data transfer to CPCB and HSPCB server for existing systems of water quality monitoring systems, parameters is BOD, COD, TSS, PH an FLOW etc. of STP at Jind
Operation and maintenance of sewerage line network excluding 4.5 MLD STP 200 mm to 500 mm i/d S.W pipe and R.C.C pipe sewer including repairing of manholes, slab and fixing of missing manholes/broken cover etc. of sewerage scheme Punhana town pe
Providing and Fixing of outlet Effluent Quality Monitoring system for data transfer to PHED HSPCB CPCB server and monitoring of 6.00 MLD capacity STP at Barwala with 3 years O M after 3 months trial run period and all other works contingent theret
AMtc estimate for Sewerage scheme and 9 MLD STP of Hodal Town for the year 2022-23. Rising and Construction of Manhole Slab with manhole cover at various places in Hodal Town complete in all respect and all other works contingent thereto.
AMtc Sewerage Scheme Hisar Town Silt clearance from above 500mm but upto 900mm id circular sewer lines manhole chamber by sewer cleaning machine from 40 MLD STP to Padaw Chowk Hisar assuming 50mtr Reach to be cleaned in 3 days based on practic
Annual maintenance of 10 MLD STP at Gohana Road, Jind. Boring and installation of One No. Tubewell of size 250mm in PWD Workshop land Jind and all other works contingent thereto Including One year mtc. and defect liability period free of cost
Annual maintenance of 15 MLD STP Zone-III Hisar. Repairing and rewinding of 75 HP sewerage submersible Non clog motor, providing and fixing of sluice valve, NRV, cable etc. and brick work and repairing of dismantling boundary wall and manhole at 15 M
Supply and Erection of underground cable MCCBs to replace damagebrunt cables MCCBs for Annual Maintenance of Street Light Points EDC dividing road of Sector 6 7, Sector 7 8 Sector 8 9 outer road of Sector 7 8 9 HBC STP WTP
Nangal Chaudhary Town Annual Mtc Works for STP Sewage Hiring of Super Sucker Hiring of super sucker machine including cost of diesel, driver lubricants and labour for lifting of silt and dispose off the silt complete in all respect and all other w
Supply and Erection of underground cable MCB MCCBs to replace damage brunt cables MCB MCCBs for Annual Maintenance of street light point EDC in Water Works Sector 1 and 4, Main Water Works Tosham Road, Sector 9 and 11, STP, HSVP Nursery Disposal Sect
Aug. Sewerage Scheme Hisar Town.Construction of 40 MLD STP Rishi Nagar ). Replacement of under Size 350mm size sewer line by of 600mm i/d RCC NP3 pipe line from Storm water Disposal Mahavir Colony to Chahal Park Ward No-8 Hisar Town and all other
Replacement of blocked and damaged 1000 mm sewer line by RCC NP-3 1200 mm i/d pipe line and construction of 2 No. partially damaged manhole on Shamshan Ghat Road Rishi Nagar, near 40 MLD STP Hisar Town and all other works contingent thereto.
Providing and laying 900 mm outer dia HDPE pipe PE-80 grade and PN-6 for sewer application and earth filling in breached embankment of Ghaghar River for STP Lali at outfall of effluent channel at Ghaghar River and all other work contingents thereto.
Aug Sewerage scheme Hisar Town Const of 40 MLD STP Rishi Nagar. Providing and laying of RCC NP3 400mm and RCC NP2 300mm id pipe for sewer line in Sainyan Maholla and Saint Nagar ward No 4, construction of Temp. Sewerage IPS collecting tank, scree
Annual Maintenance estimate of Sewerage Scheme Hisar Town for the year 2023-24.Operation and Maintenance of 4 MLD STP based on SBR Technology at Kaimari Road Hisar Town for the period of 60 months (from the date of commencement) and all other works
Jhajjar Laying of 36 inchi 900mm DI pipe sewer and construction of New manhole due to settelment of old manhole and 36 inchi 900mm DI pipe line near Sursain Chowk STP 5.5 MLD at Kosli Bye Pass Jhajjar Town and all other works contingent thereto
A/Mtc Estimate of Sewerage Scheme Kalka Town Operation and Maintenance of 0 25 MLD STP at Bangala Basti Kalka Based on MBBR Technology for Civil Work elect and Mech Installation watch and ward etc complete in all respect and all other works cont
Providing and Fixing of inlet effluent monitoring system for data transfer to PHED HSPCB and CPCB and server 2 No of UV flow meter at Inlet and Byepass of STP as per guideline of Haryana State Pollution control Board and monitoring of 7 MLD
AMtc Estimate STP Sew. Sch in Y.Nagar Town for the year 2025 26.Job work for supply of labour for multipurpose activities to be carried out at various location to the entire satisfaction of Engineer in charge of under PHED2 Y.Nagar 7 Months (RECALL)
Work of Connecting Master sewerage line of Sector-13 and Sector-37 (Towards STP) by providing and fixing of 2 No. Non-Return Valve of 450mm dia. Including providing and fixing of D.I. specials and D.I. pipe of required size and hiring of hydraulic ex
Providing and laying of Sewer Lines i.e. 200mm, 250mm, 300mm dia S.W. pipe in recently approved colonies and 280mm o/d /Rising Main HDPE Pipe PE 80 grade and PN 4 from Proposed IPS to existing 16.50 MLD STP at Mandi Dabwali Town Distt. Sirsa
Bawal Town Annual Mtc Work for Sewerage Scheme Bawal Town Distt Rewari for the year 2026 27 Job work for Earth work around STP old pond to prevent seepage of water to adjoining fields and supply installation of LT Cable for Main power source to
REHABILITATION OF EXISTING 18 MLD SEWERAGE TREATMENT PLANT and CONSTRUCTION OF TERTIARY TREATMENT PLANT.
Job No.1067/2025 (HEW) Mtc. of all Horticulture works in along GT Road, Entry Point, STP Patla and Park in front of Ambedkar University plus Community Centre at U/E Sonepat along with Mali cum Chowkidar for watch and ward for the year 2025-26 (EDC
Aug sewerage scheme Hisar Town Construction of 40 MLD STP Rishi Nagar. Laying of RCC NP-3 pipe 800 mm id pipe line, Construction of manholes in Gali no 5 Azad Nagar an damaged manhole in front of PWD office Hisar Town and all other works contin
Work for hiring of JCB for removal of malba, rough dressing of green belt along railway line and making of roadside berm for plantation in Sector-7 and 8 and in newly developed block in Sector-19 and rear portion of 30 MLD STP along Barsat road
AMtc of EPHS in Sector 1 Jail Land and 7 8 9 and10 UE Ambala City Job work of attending complaints of sewerage and attending complaints of water supply line operation and watch and ward of 2 MLD STP and Canal base water works complete in
Bawal Town Annual Mtc Estimate of Sewerage Scheme Bawal Town for the year 2025 26 Providing and fixing 25 BHP Non clog Pump Panel Board 6 sqmm copper cable CI and DI special at MPS at STP Bawal Town and all other works contingent there to
Providing and fixing of 200 mm PVC pipe with all special and dismantling of Paver block and repair in same condition complete in all respect from Jindal Modern School, 0.0 RD to 600 RD towards 8 MLD STP Satrod Hisar Town and all other works continge