Loading…
Loading…
22,464 results • Best match
Work Giving Electrical Connection of 1202 KW/1356 KVA (LMV-VII) to 35, M.L.D Sewage Treatment Plant , Sarai Talfi, Bareilly C/o up Jal Nigam, Bareilly and EE, Nirman Khand E and M deposited fund 2021-22 under EUDD-I, Bareilly
DETAILED PROJECT REPORT FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT MUNAK DPR FOR AUGMENTATION OF W/S SCHEME MUNAK BY INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINES IN VILLAGE MUNAK DISTRICT KARNAL UNDER SWARAN JAYANTI MAH
Custom Bid for Services - Hiring of Operation & Maintenance Services for Trombay Terminal, ONGC & Allied Metering Stations Similar Category Operation And Maintenance Of Electro-Mechanical Installations Operation And Maintenance Of Other Machines And ... Effluent/ Sewage Treatment Plant
Custom Bid for Services - TWO YEAR RATE CONTRACT FOR SCAFFOLDING WORKS IN IREP AREAS OF BPCL KOCHI REFINERY INCLUDING UNITS, OFFSITES & UTILITIES AREA Similar Category Operation And Maintenance Of Other Machines And Plants Operation and Maintenance ... Effluent/ Sewage Treatment Plant
Custom Bid for Services - REMOVAL OF COAL TAR AND PHENOL SEDIMENTS FROM MANHOLE CHAMBERS AND PIPELINES FROM PG PLANT TO ET PLANT Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based Support Services Operation and Maintenance ... Effluent/ Sewage Treatment Plant
Custom Bid for Services - CPCLH25136-Annual Rate Contract (ARC) for Operation & Maintenance (O&M) of CPCL Desalination Plant at Kattupalli near Minjur, Chennai Similar Category Operation And Maintenance Of Water Supply Systems Operation and ... Effluent/ Sewage Treatment Plant
Construction of Phase (A plus B) works at JNV, North Dinajpur (West Bengal) including site development and electrical installations (Package II). SH: Construction of 1.50 Unit Boys dormitory with 6 Nos. wardens residence i.e (Total 1.50 unit consists ... , sewage treatment plant of ...
Kadapa Municipal Corporation - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewage treatment Plant of 20 MLD capacity based on Open Technology with three months trail run, Providing of balance sewer lines in existing Underground Drainage network in the entire area of Zone-I & II of Kadapa Municipal Corporation and Providing 30000 House Service Connections in the entire area of Kadapa Municipal Corporation including 2 (Two) years Defect Liability Period and Post completion Operation and Maintenance of entire sewerage Treatment Plant for 10 (Ten) years including 2 (Two) years Defect Liability Period in Kadapa Municipal Corporation
Kadapa Municipal Corporation - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewage treatment Plant of 20 MLD capacity based on Open Technology with three months trail run, Providing of balance sewer lines in existing Underground Drainage network in the entire area of Zone-I & II of Kadapa Municipal Corporation and Providing 30000 House Service Connections in the entire area of Kadapa Municipal Corporation including 2 (Two) years Defect Liability Period and Post completion Operation and Maintenance of entire sewerage Treatment Plant for 10 (Ten) years including 2 (Two) years Defect Liability Period in Kadapa Municipal Corporation
Construction of Residential accommodation consisting of 17 Nos Type II quarters G4 36 Nos TypeIII quarters G4 10 Nos Type IV Qaurters G4 2 Nos Type V quarters Ground floor 2 Nos TypeVI G1 MP Hall including internal water supply sainitary ... system Sewage treatment plant etc ...
Kadapa Municipal Corporation - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewage Treatment Plant of 20 MLD capacity based on Open Technology with three months Trail run, Providing of balance sewer lines in existing Underground Drainage net work in the entire area of Zone-I & II of Kadapa Municipal Corporation and Providing 30000 Houser Service Connection in the entire area of Kadapa Municipal Corporation including 2 (Two) years Defect Liability Period and Post Completion Operation and Maintenance of entire Sewerage Treatment Plant for 10 (Ten) years including two years Defect Liability Period in Kadapa Municipal Corporation.
Naraingarh Town, construction of Faecal Sludge Treatment Plant in existing campus of 3 MLD seweage treatment plant Naraingarh town Distt. Ambala. Naraingarh Town, construction of Faecal Sludge Treatment Plant in existing campus of 3 MLD seweage trea
Design, Supply, lnstallation, testing and commissioning of 30 KLD FSTP based on Hybrid Tech Up flow BIO treat Plus MBBR Technology Plus ..02 year Operation and Maintenance of FSTP including training of Municipal Corporation Satna (M.P.)
Estimate for the various Improvement Works taken up under Jal Hi Amrut scheme at 90 MLD Bellandur Amanikere STP, 35 MLD Agara STP and 10 MLD Hulimavu STP coming under EE(WWM-STP)K&T Division
SITC MAHUL STP SWITCHBOARD (Q3)
Operation of STP and T.W.
Annual Maintenance of Modular STP
FLEXIBLE CABLES FOR RAIPUR STP
PROCUREMENT OF STP VTS ITEMS
Construction of Pulli near STP
ULTRA FILTRATION MEMBRANE FOR STP
FBTec Technology Decentralise STP Work
LP of STP Spares Parts
STP CABLE LAYING (INCLUDING INSTALLATION)
Certification of STP treated Water
CMC of STP and ETP
Operation and Maintenance of STP
Operation and Maintenance of STP
STP Salamangalam in kanchipuram District
AMC OF 50 KLD STP
Operation and Maintenance of STP
SBM 2.0 2025-26 - STP
Flowmeter for STP CTPS,Obra
Sew.Sch and STP at Mudki
Internal clearance of STP Channel
Repair and maintenance of STP
Chemicals for STP 450 KLD
Stamp Pad - Faber Castell STP
150 KLD modular STP (Q3)
OCEMS for 58 nos. STP
ETP STP PLANT TURN KEY
STP 4MLD Irrigation Project, Sirhind
Repair Work of STP Anasagar
Lmc7/STP Drying Bed / 2019